Vacuum Deaeration
Understand how reduced pressure, surface renewal and controlled transfer remove entrained air while protecting formulation and fill consistency.

On this page · 11 sections
- 1What Vacuum Deaeration removes
- 2Deaeration, degassing and vacuum drying are different
- 3Trace air entry before choosing equipment
- 4Balance pressure, time, temperature and surface renewal
- 5Run an approved sequence with a defined endpoint
- 6Control foam carry-over, volatile loss and ineffective holds
- 7Worked cases: density, volumetric filling and re-aeration
- 8Preserve deaeration through transfer and filling
- 9Record approved limits, actual conditions and product checks
- 10Map the product and market before applying rules
- 11Check readiness from air source to final disposition
How does Vacuum Deaeration apply to your shop floor?
Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.
01What Vacuum Deaeration removes
Vacuum Deaeration is the controlled removal of entrained air from a liquid or viscous product by reducing pressure and exposing air-bearing material to a surface where bubbles can escape. In cosmetic creams, topical pharmaceutical gels, and viscous food or supplement batches, the target is air dispersed within the product—not simply gas occupying the vessel headspace.
Entrained air consists of bubbles distributed through the bulk material. Mixing can draw air into the batch; powder wetting can introduce air carried between particles; and transfer can add bubbles through splashing or air entering the flow path. A product can therefore contain troublesome air even when its exposed surface looks smooth. In thick formulations, bubbles may remain trapped rather than readily rise out.
Removing that air can reduce visible voids, inconsistent apparent density, unstable volumetric dosing and uneven product appearance. These defects connect deaeration to product performance: a fixed dispensing volume can contain different product masses when its bubble content varies.
Vacuum de-aeration and vacuum degassing are alternative search terms; the broader meaning of degassing is addressed in the comparison section. For production use, define the endpoint through a product result, such as an appearance criterion or density check within the batch’s in-process controls. Reaching a vacuum reading or completing a timer describes process execution; neither alone demonstrates that the air-removal target has been met.
02Deaeration, degassing and vacuum drying are different
These operations can share equipment without sharing an endpoint. In cosmetic, topical pharmaceutical and viscous food or supplement production, distinguish the material being removed or changed before choosing acceptance evidence.
| Process | Primary target | Mechanism | Evidence of success |
|---|---|---|---|
| Vacuum deaeration | Entrained gas bubbles | Reduced pressure expands bubbles; surface exposure permits escape | Residual-bubble checks and density consistency |
| Broader vacuum degassing | Entrained or dissolved gas | Reduced pressure promotes gas release and transfer out of product | Gas-specific measurement when dissolved gas is the target |
| Vacuum drying | Moisture or solvent | Evaporation under reduced pressure, with heat supplied as needed | Residual moisture or solvent against a defined endpoint |
| Mechanical foam breaking | Surface foam | Mechanical disruption collapses foam | Reduced foam layer or foam carry-over |
| Homogenisation | Droplets, particles or agglomerates | Mechanical energy reduces size or improves dispersion | Droplet or particle-size distribution and uniformity |
Entrained bubbles occupy discrete pockets; dissolved gas is present within the liquid phase. A density-based air estimate does not establish dissolved oxygen concentration. Use an appropriate dissolved-oxygen measurement when that is the objective.
Vacuum drying deliberately removes moisture or solvent. Deaeration primarily targets entrained gas; evaporation during that operation can unintentionally change formulation concentration. A drying endpoint therefore answers a different question from a residual-air check.
Likewise, a collapsed foam cap does not demonstrate removal of dispersed bubbles. Smaller droplets or better particle dispersion do not demonstrate air removal. Match acceptance evidence to the intended process result, not merely to use of vacuum or a visibly smooth surface.
03Trace air entry before choosing equipment
Map where air enters before specifying a vacuum system: powder wetting, agitator vortices, splashing, free-fall returns, leaking pump seals and poorly flooded transfer paths. Associate each suspected entry point with the relevant equipment identification, operating step and feed condition. This separates two jobs: preventing new entrainment and removing air already dispersed through the batch. A vacuum-capable vessel addresses the latter; it does not correct every upstream cause.
Use EmulXion's production-scale deaeration discussion as equipment-selection practice, not a regulatory prescription. Compare arrangements against process location, product structure, throughput and tolerance for repeated circulation:
- Vacuum mixing vessel: commonly suits batch operations where powder wetting, dispersion and air removal share a vessel. Assess whether bulk movement exposes the whole batch without damaging its developed structure.
- Recirculation arrangement: provides an external processing route but adds pump, pipe and return conditions to assess. Compare circulation capacity with batch size, and test whether repeated passes alter texture or introduce fresh air.
- Inline thin-film deaerator: commonly suits already-mixed product during continuous processing or transfer. Spreading product under vacuum shortens the bubble escape path; match throughput and product distribution to viscosity and allowable residence time, rather than chamber size alone.
Bulk agitation moves material through the vessel; high-shear dispersion wets powders and develops dispersion or emulsion structure. Those are different duties. The high-shear setting used to build a formulation is not necessarily suitable for final air removal: trials may support reducing or stopping that device while retaining enough bulk movement for surface renewal.
Include cleanability, drainability, retained product in pumps or pipe pockets, and access for inspection in design qualification. Compare these alongside air-removal performance: a configuration that handles bubbles well can still be impractical to empty, inspect or change over.
04Balance pressure, time, temperature and surface renewal
Reducing pressure promotes expansion of entrained bubbles, but expansion alone does not remove air. Bubbles still need to move through the product, coalesce where conditions permit, and reach an exposed surface to escape. A deeper vacuum cannot reliably compensate for a flow pattern that leaves air-bearing material stranded below that surface.
The operating profile therefore includes the pressure ramp and stable exposure period, not just the final setpoint. A progressive ramp gives expanding gas space to disengage without overwhelming the available freeboard. Define when the stable exposure period begins and which pressure, temperature and circulation conditions apply throughout it. Simply extending elapsed time may add little when fresh material never reaches the release zone.
Temperature changes both flow behaviour and evaporation risk. Warming may reduce resistance to bubble movement in some formulations, yet it can also increase loss of water, solvents or desirable volatile ingredients under vacuum. The useful temperature is therefore a compromise between mobility and formulation preservation, not necessarily the warmest condition the vessel can provide. Consider actual product temperature rather than treating a jacket setting as its equivalent.
A single apparent-viscosity result does not describe this behaviour adequately. Shear-thinning products become easier to move under shear but may resist bubble travel when agitation slows. Yield stress can hold bubbles in place; thixotropy makes behaviour depend on preceding shear and recovery time. Solids loading changes flow resistance, while proteins, surfactants and other foam-stabilising ingredients can hinder bubble collapse. Trials should represent the product’s processing history, not only a freshly stirred laboratory sample.
Surface renewal is the complementary control: bulk circulation, sweeping or thin-film exposure brings air-bearing product into contact with low pressure. Useful circulation transports material without repeatedly fragmenting and re-dispersing bubbles. Agitator speed alone is a poor description of that result. For cosmetic equipment discussions, transporting entrapped air toward the surface is a useful design question to take to manufacturer references such as EKATO’s cosmetic mixing overview, rather than treating an equipment example as a universal prescription.
Geometry determines whether that circulation reaches the whole batch. Greater product depth can lengthen the escape path; exposed area affects opportunities for release. Freeboard accommodates expansion, while agitator coverage determines whether wall, bottom and upper regions participate in circulation. Stagnant regions can retain bubbles despite an apparently steady vacuum. Assess these relationships at the intended working fill, rather than assuming vessel capacity predicts performance.
Establish a product- and equipment-specific operating window through process trials that vary these factors together. There is no universal vacuum, temperature, speed or hold-time value. Relate the exposure period to demonstrated air removal; use a separate hold-time study where batch waiting periods also need evaluation. Proposed operating-window changes belong in human technical and quality review before production use.
05Run an approved sequence with a defined endpoint
A practical batch sequence connects equipment operation to product evidence. Use the following framework within the site’s established process.
- Identify the authorised setup. Begin with the applicable product, formulation revision, batch size, vessel identity and approved parameter-set revision. Link the instruction to recipe versioning so operators can distinguish the current sequence from superseded settings. Confirm that the intended batch fits the vessel’s established working-volume and vacuum-service limits.
- Check readiness before charging or evacuating. Confirm vessel suitability and cleanliness, seal condition, instrument status, pressure-display basis, vacuum connections and isolation-valve positions. Check that condensate collection and handling are ready and that the intended discharge destination and transfer route are available. Resolve discrepancies before starting the affected operation.
- Build and condition the formulation in the established order. Complete the specified wetting, dispersion or emulsification stages, then condition the product to the prescribed temperature and agitation state. Apply vacuum progressively using the approved ramp, while maintaining the defined surface-renewal pattern. Avoid substituting equipment capability for the product-specific sequence.
- Define the hold clock explicitly. The instruction should identify which pressure, temperature and agitation conditions start the hold, what departures constitute an interruption, and whether timing pauses, restarts or awaits assessment. Record interruptions alongside pressure and temperature history, agitation state, foam behaviour, visible bubble release and unusual condensate observations. Do not count elapsed equipment-cycle time as qualified hold time by default.
- Keep adjustments and changes separate. Operators can make authorised adjustments within the approved parameter tolerance band, recording the reason and actual setting. Proposed changes to the range, ramp, hold logic or operation order go to authorised process and quality personnel, as applicable, for approval before use. An unsatisfactory endpoint is not permission to improvise a deeper vacuum or longer hold.
- Assess the endpoint, then discharge. Follow the defined sampling location, timing and handling instructions, using the specified density, appearance or other product checks and acceptance criteria. Maintain the sample handoff where testing occurs elsewhere. A completed equipment sequence alone is not endpoint evidence. After the required human assessment, follow the established vacuum-release and discharge sequence, handing the batch to downstream transfer controls.
- Select approved sequenceMatch the product, vessel and parameter revision.
- Confirm readinessCheck equipment condition, instruments and transfer routing.
- Condition the batchEstablish the intended temperature and circulation.
- Apply controlled vacuumFollow the ramp while observing foam behaviour.
- Assess the endpointConnect process history with defined product checks.
- Protect downstream transferPreserve the result through the filler inlet.
- Review dispositionAuthorised people evaluate results and unresolved exceptions.
06Control foam carry-over, volatile loss and ineffective holds
Treat vacuum-stage failures as different mechanisms, not a single instruction to pull harder or wait longer. Flash evaporation can increase vapour loading, burdening the condenser and vacuum system. Maximum vacuum capability is therefore not the preferred operating condition; use the established product-specific pressure ramp and equipment protection strategy.
| Observation | Plausible mechanism | Immediate containment | Follow-up evidence |
|---|---|---|---|
| Foam surges as pressure falls | Aggressive pressure reduction expands gas faster than foam collapses. | Pause further pressure reduction using the established protective sequence. | Compare pressure ramp, foam onset and protection-system response. |
| Foam reaches the vacuum outlet | Insufficient freeboard leaves inadequate expansion space. | Protect the vacuum train; contain carry-over under the equipment procedure. | Check batch loading, available freeboard and material in traps or lines. |
| Foam persists despite a controlled ramp | Formulation components stabilise the gas–liquid interface. | Avoid unapproved antifoam additions or agitation changes. | Review formulation lots, foam behaviour and the established foam-breaking strategy. |
| Bubbles remain after a long hold | Poor surface renewal, stagnant regions, product rheology or stable foam prevent escape. | Do not automatically extend the hold; seek review at the established endpoint. | Examine circulation, agitator operation, temperature, rheology and representative bubble observations. |
| Unexpected condensate or product changes | Volatile or solvent loss; flash evaporation may alter concentration. | Contain affected product and condensate; follow the approved response to excessive vapour loading. | Review condensate quantity/composition, mass balance, concentration-related checks and product-appropriate odour, flavour, texture or formulation attributes. |
| Pressure fluctuates or cannot be maintained | Suspected leakage, instrumentation error or vacuum-system instability—not necessarily difficult product. | Use the equipment fault procedure; avoid compensating with a longer hold. | Retain pressure history; assess gauge performance, seals, connections, condenser and vacuum-system condition. |
After carry-over, identify and contain affected product, condensate and equipment; prevent unintended use or transfer. Record the event through the established deviation process. Review contamination exposure, cleaning, inspection and functional checks before return to service. Product disposition remains a separate human decision. Route proposed parameter changes through change control as set out in the approved-sequence section, rather than an operator workaround.
07Worked cases: density, volumetric filling and re-aeration
These illustrative cases use symbolic calculations and qualitative observations, not production readings or acceptance limits. They show how density and sampling location can inform interpretation without prescribing vacuum settings.
Cosmetic cream: estimate entrained-air volume fraction
Let ρref be the reference density and ρbulk the aerated bulk density, both expressed in g/mL. The estimated entrained-air volume fraction is:
Estimated air volume fraction = (ρref − ρbulk) / ρref.
This calculation assumes representative samples, equal measurement temperature, unchanged formulation, negligible gas mass, and a reference assumed to represent the same product without entrained air. Compare measurements at the same pressure as well: bubble volume depends on pressure. The density units cancel, leaving a dimensionless fraction of the aerated sample volume.
The result estimates air volume at the measurement conditions; it is not a direct bubble count, a dissolved oxygen result or a standalone release criterion. A reference that still contains air can understate the estimate, while a compositionally different reference can invalidate it. When the density difference is small relative to measurement uncertainty, the apparent change may be inconclusive. A defined density checkpoint and metrological traceability help make comparisons interpretable, but do not eliminate sampling uncertainty.
Viscous food or supplement: predict a volumetric fill-mass change
For an unchanged delivered dose V in mL, with densities before and after deaeration in g/mL:
Predicted mass difference = V × (ρafter − ρbefore), giving mass in g.
If density increases, the same delivered volume contains more mass. This prediction assumes genuinely equal delivered volumes—not merely an unchanged machine setting—and comparable measurement conditions. It also assumes that composition has not changed. Confirm the prediction against measured net fills rather than treating it as an observed outcome.
A mass-controlled filler instead adjusts delivered volume toward its mass target. The fixed-volume prediction therefore does not describe its intended response; distinguish gravimetric from volumetric dispensing before interpreting fill results.
Topical gel: locate where the result changes
Compare representative vessel-discharge and filler-inlet samples from corresponding portions of the same transfer, collected without introducing air and measured under comparable conditions. If discharge samples meet the product’s established criterion but inlet samples show lower density or renewed bubbles, the contrast supports investigating re-aeration between those locations. It does not identify a particular component as the cause.
A vessel-only sample cannot establish filler-inlet condition. Record location and transfer timing alongside each result; downstream troubleshooting follows in the next section.
08Preserve deaeration through transfer and filling
Trace the product path from vessel discharge through pumps, recirculation branches, pipework, buffer vessels and the filler inlet. EmulXion's discussion of transfer-path failures supports investigating beyond the deaerator: a poorly flooded transfer line can introduce bubbles after successful treatment. This is manufacturer practice, not a regulatory operating limit.
- Check suction starvation and unstable inlet conditions separately: inadequate supply can interrupt pump feeding, while fluctuating buffer levels or valve switching can disturb otherwise adequate flow.
- Inspect seal leakage for air ingress and free-fall returns for entrainment at the receiving surface.
- Check high points for trapped gas pockets and abrupt restrictions for local pressure drops. Newly entrained air differs from dissolved gas liberated by reduced pressure; cavitation involves vapor cavities forming and collapsing, not simply air entering.
At each handoff, connect batch identity with equipment identification, transfer readiness and the approved parameter revision. Confirm the receiving vessel, valve route, available capacity and pump setup. Specify sampling locations before transfer and near the filler inlet; a sample login handoff can preserve location and timing. Align pressure, flow, temperature and buffer-level trends with density observations and filling results to locate where performance changed.
For an exception, identify the affected product interval using transfer times, line hold-up and filled-unit records. Preserve original observations, segregate the implicated material where appropriate, and assess the cause before choosing recovery. Link returned or recovered material to its original batch and affected interval. Repeat processing follows the approval path described in the approved-sequence section.
Extra circulation can alter shear-sensitive structure; another vacuum exposure can remove volatile formulation components. Assess cumulative processing and define post-recovery checks rather than assuming re-deaeration restores the original condition harmlessly.
09Record approved limits, actual conditions and product checks
A practical vacuum deaeration record separates intended operation, observed execution and human disposition. Keep approved instructions alongside, but distinct from, actual readings so reviewers can compare the run with its authorised conditions without reconstructing events from a final pressure value.
- Approved parameters: identify the pressure basis, such as absolute or gauge, and permitted range; ramp instructions; temperature range; agitation settings; hold definition; and endpoint criteria. Specify when hold timing begins and how interruptions affect it. Link the approved parameter-set revision to the applicable formulation revision, rather than relying on a recipe name alone.
- Run identity: associate each execution with the batch, formulation revision, vessel and relevant auxiliary equipment, parameter-set revision, operator, and start, interruption, restart and completion times. Give repeat runs distinct identities within the batch execution history.
- Observed conditions: retain timestamps, units, instrument identities and operating context for readings. Record foam events, pressure interruptions and interventions as they occur, including the action taken and subsequent observations. Preserve trends where available; a final reading alone does not describe the preceding hold.
- Density checks: retain the measurement method, reference basis used for comparison, sample identity and location, measurement temperature, instrument and result. Distinguish a reference density from a measured batch density, and retain any calculation inputs rather than only a calculated air estimate.
- Filling checks: record whether dosing is mass-based or volume-based, the tare treatment, measured net mass or volume, sample identity, and the associated transfer interval. Connect samples to the relevant run and transfer conditions so upstream and filler results remain interpretable.
- Exceptions and review: link deviations, proposed parameter changes, repeat-processing decisions and review outcomes to the affected run. Retain the original readings and instructions; append corrections with attribution and reasons rather than overwriting history.
Final disposition should identify the authorised reviewer, decision, time and rationale. Pressure trends, timers and product checks support that decision; they are not automatic release.
Approved parameter set
Versioned operating ranges with human approval.
- parameter_set_id
- revision
- product_id
- pressure_basis
- approved_ranges
- approved_by
Batch run
Execution linked to its approved configuration.
- run_id
- batch_id
- parameter_set_id
- equipment_id
- started_at
- ended_at
Process observation
Time-stamped measurements, including operating excursions.
- run_id
- observed_at
- parameter_name
- observed_value
- unit
- instrument_id
Product check
Sample context linked to measured results.
- check_id
- run_id
- sample_location
- sample_temperature_c
- density_g_ml
- net_fill_mass_g
Review decision
Human disposition and associated change history.
- review_id
- run_id
- deviation_id
- change_request_id
- disposition
- reviewed_by
10Map the product and market before applying rules
Start with intended product classification and destination market. Use this scope check before assigning regulatory obligations to a deaeration step.
| Destination | Intended classification? | Which current manufacturing, documentation and change-control provisions apply? |
|---|---|---|
| US | Cosmetic? | Check cosmetic-specific scope. |
| US | Topical pharmaceutical? | Check drug-specific scope. |
| US | Food or dietary supplement? | Check each category separately. |
| EU | Cosmetic? | Check cosmetic-specific scope. |
| EU | Topical medicine? | Check medicinal-product scope. |
| EU | Food or food supplement? | Check each category separately. |
Check the current applicable text rather than transferring obligations between categories or jurisdictions. Keep binding rules, official guidance and recognised industry practice distinct; do not treat recommendations as legal requirements.
Equipment-maker operating advice describes process practice; it does not itself establish a legally mandated vacuum level or hold time. Keep this regulatory mapping separate from the technical assessment of whether deaeration suits the formulation.
11Check readiness from air source to final disposition
Use this practical review checklist to close the assessment. Point each answer to batch-specific evidence rather than treating a completed vacuum hold as proof of readiness.
- Confirm the target defect and likely air-entry mechanisms are documented; refer to the air-entry and equipment-fit assessment.
- Confirm the approved sequence applies to this product, equipment configuration and batch size. Identify who approves parameter changes before execution, as covered in the approved-sequence section.
- Check that the pressure basis, units, measurement methods and endpoint evidence are unambiguous. Link the applicable density checkpoint or other product-result check.
- Check that foam carry-over and volatile-loss contingencies identify containment actions, affected material and the responsible review route; refer to the vacuum-stage controls.
- Confirm the assessment includes discharge, transfer and filling—not only the vacuum vessel—and identifies downstream sampling points.
- Check traceable links between approved settings, actual observations, density or fill results, exceptions and human disposition. Carry unresolved items into the batch release checklist for review, rather than closing them on equipment readings alone.
Frequently asked questions
Q.How should conflicting absolute-pressure and gauge-vacuum readings be reconciled?+
First identify each instrument’s pressure reference, units, location and sign convention. Absolute pressure is referenced to a vacuum; gauge pressure is referenced to atmospheric pressure. Convert readings to the same basis using local atmospheric pressure, rather than assuming a fixed offset. Compare simultaneous readings under stable conditions, accounting for pressure losses between the vessel and vacuum line. If disagreement remains, investigate blocked connections, condensate and calibration through an as-found/as-left assessment before using either reading to justify changing the process.
Q.When does dissolved oxygen testing add information that a density check cannot provide?+
Dissolved oxygen testing adds value when oxidation, rather than visible bubbles or dosing variability, is the concern. A density checkpoint can indicate entrained gas when temperature, composition and sampling are controlled, but it does not establish dissolved oxygen concentration. A batch may have consistent density yet retain oxygen relevant to colour, flavour or ingredient stability. Use a product-suitable oxygen method with controlled sampling exposure and temperature; assess downstream oxygen pickup separately, particularly where transfer or filling exposes product to air.
Q.How can a yield-stress cream be sampled without changing its apparent air content?+
Use a defined sampling location and a repeatable, gentle collection technique that avoids whipping, narrow restrictions and excessive suction. Collect into the density vessel without leaving artificial voids, using a filling method demonstrated suitable for the cream. Keep sample temperature, handling and elapsed time consistent: vigorous manipulation can release trapped bubbles, while careless loading can add them. Record these conditions at sample handoff. Compare replicate samples during method development to establish whether sampling variability obscures the batch’s actual air-content differences.
Q.Should fragrance, flavour or solvent additions occur before or after deaeration?+
Choose the sequence from formulation trials, not a blanket rule. Adding volatile ingredients before vacuum exposure can promote stripping and change composition; adding them afterwards can introduce air or leave inadequate distribution. Compare retention, uniformity, sensory attributes and residual bubbles across candidate sequences. Where late addition is suitable, use controlled incorporation and assess whether any subsequent vacuum exposure is acceptable. Route sequence or parameter changes through change control, with approval by responsible formulation, process and quality personnel before routine use.
Q.What should be reviewed before applying a pilot-scale sequence to a larger or smaller vessel charge?+
Review working depth, exposed surface, freeboard, agitator immersion, circulation pattern and the route by which material reaches the surface. A smaller charge can expose an impeller or return connection; a larger charge can increase bubble travel distance and reduce foam clearance. Also assess vacuum-system capacity, condenser load, temperature uniformity and discharge conditions. Matching pressure and elapsed time alone does not establish equivalent treatment. Define scale-specific sampling and acceptance checks in the technology-transfer plan, including product quality after transfer to filling.
Q.What if the hold timer finishes but the pressure history contains interruptions?+
Treat timer completion as an equipment event, not proof that the intended exposure occurred. Review when interruptions happened, their duration, pressure recovery, temperature and agitation, and whether the sequence counted elapsed time or only time within the approved operating conditions. Follow the established interruption procedure; do not silently add disconnected periods or restart the hold indefinitely. Record any departure in the deviation assessment. Responsible personnel should approve additional processing based on product condition and cumulative exposure, including potential volatile loss.
Q.How should repeated foam alarms be investigated when the vessel does not appear overfilled?+
Investigate transient foam expansion rather than relying only on the settled liquid level. Correlate alarms with pressure ramps, powder or liquid additions, agitator changes and temperature. Surfactants, proteins or formulation variation can stabilise foam even with apparently adequate freeboard. Inspect the detector for coating, condensation or response problems, and check the vacuum line and collection equipment for carry-over. Preserve the protective function while investigating: bypassing interlock logic can conceal a genuine entrainment event. Distinguish confirmed foam events from instrument faults.
Q.How should a partly deaerated batch be assessed after an extended shutdown?+
Reconstruct the shutdown conditions: temperature history, agitation status, vessel closure, vacuum loss and any intervening additions or transfers. Evaluate possible separation, structural recovery, oxygen exposure and microbiological risk where relevant to the formulation. A satisfactory density result alone cannot resolve those concerns. Compare the interruption with the product’s established hold-time study and assess whether representative sampling remains possible. Responsible personnel should decide whether controlled mixing, further deaeration, additional testing or rejection is appropriate before authorising restart and eventual batch disposition.
Want to see how Vacuum Deaeration could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.