Electronics and electrical assembly software

Electronics & electrical assembly

Keep component lots, moisture-sensitive and ESD handling records, the approved assembly revision, inspection and test results, rework and serial dispatch connected. Industry acceptance standards are voluntary consensus documents your customers may flow down. Bring your process to the demonstration: these are evaluation scenarios, not a claim of a dedicated SMT engine.

  • Component lots follow kitting, placement and box build
  • Approved assembly revisions and change control stay with the work
  • People judge acceptability, disposition and release

7-day free trial, no card required. Or .

Electronics technician in hair/beard covers, safety glasses, gloves and an ESD smock with wrist strap using a tablet beside an SMT line and component reelsQuality inspector in hair/beard covers, safety glasses, gloves and an ESD smock with wrist strap reviewing a circuit board and tablet under a magnifying lampTwo assembly workers in hair/beard covers, safety glasses, gloves and ESD smocks with wrist straps checking a harness on a tablet beside labelled component bins
Why start now

The cost of waiting

Five reasons not to put it off.

Paper hides problems.

Missing signatures and wrong lots stay buried in binders until an audit or a customer finds them.

Start your free trial 7 days free. No card required.
Where V5 fits

Keep your ERP. Run the floor in V5.

Add warehouse and quality when you're ready.

Your ERP
WarehouseV5 or yours
ProductionV5 Ultimate
QualityV5 or yours
Lab instruments
Scales
Scanners & printers
Sensors & IoT
And more
Your devices, your choice. Connections confirmed for your setup.
How it works

One assembly revision. From component intake to serial dispatch.

  1. Labelled component reels beside a tablet showing supplier lot and date code123
    01
    Identify the components

    Keep available manufacturer and supplier lot codes, date codes and certificates with each container. Review identity and authenticity before acceptance.

  2. Kitted component bins beside a tablet listing the issued assembly revision
    02
    Kit the job

    Issue the approved assembly revision and kit the right reels and parts to the right line. Record substitutions only where your change control allows.

  3. SMT line beside a tablet recording setup checks and first-article results
    03
    Record the build

    Give the build its own identity. Capture setup verification, first-article checks and the observations your procedure requires.

  4. Inspection bench with a tablet showing inspection results and a pending item
    04
    Review inspection and test

    Retain inspection and test results against the criteria your customer and your procedures define. A pending result stays visible to the responsible reviewer.

  5. Boxed assemblies beside a tablet tracing serial numbers to dispatch
    05
    Trace the serial dispatch

    Record serial numbers, label revisions and reconciliation for each shipment. People decide disposition before dispatch.

Each record stays linked by lot, for example RM-MC-7781 → WO 4412 → Serial range 3180-0001…0250 → Customers A / B → Dispatch records. People make the quality and release decisions; V5 keeps the evidence together. See inventory & traceability

One platform

The board is tested. The surrounding records should be complete.

Quality, suppliers, equipment and labels alongside the build record.

Free guide18 pages · Online & printable · 3 worksheets · 8 primary sources · opens online

The Electronics & Electrical Assembly Operations Guide

Right revision. Recorded build. Reviewed test result.

What's inside
  • Board, harness or box build
  • Lot-to-serial trace
  • US and EU scope plus three worksheets

We ask for your name and email so we can handle this request. The full guide then opens on this site, ready to translate, print or save. Privacy policy. Practical orientation, not acceptability, counterfeit-detection, ESD-certification or legal advice. Your qualified teams review standards, intended use, current requirements and disposition.

Guide section on inspection and supplier evidenceGuide section on the build recordElectronics and electrical assembly browser guide cover
Ask V5

Which build handover is hardest to reconstruct?

Pick a question or write your own. It opens in the assistant for you to edit before sending.

No email needed to ask. All industries

Electronics technician in hair/beard covers, safety glasses, gloves and an ESD smock with wrist strap using a tablet beside an SMT line and component reels
Your team makes the calls. V5 keeps the record.

See it on your own floor.

Start a free trial or talk it through with us. No card needed.

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.