V5 Ultimate
Ultimate
PricingResourcesCompany
English (original)العربيةDeutschΕλληνικάEspañolFrançaisItalianoעברית日本語한국어NederlandsPolskiPortuguêsSvenska
Talk to us Log in Start free trial
Food & Beverage
  • Bakery & Confectionery
  • Food Processing
  • Ingredients & Dry Mixes
  • Sausage & Meat Products
  • Produce Packing
  • Pet Food & Pet Supplements
  • Dairy & Chilled Foods
  • Beverages & Liquid Manufacturing
  • Infant Formula
Pharma & Life Sciences
  • Radiopharmaceuticals
  • Pharmaceutical
  • Medical Devices
  • Veterinary Pharmaceuticals
  • Blood & Tissue
  • Diagnostics & IVD Kits
  • Reference Materials & Standards
  • OTC Topical Creams & Gels
Supplements & Personal Care
  • Dietary Supplements
  • Cosmetics & Personal Care
  • Cannabis & Hemp Manufacturing
  • Fragrances & Perfumery
  • Soaps & Personal Hygiene
  • Botanical Extracts & Essential Oils
Chemicals & Materials
  • Plastics & Resins
  • Agricultural Chemicals
  • Specialty & Industrial Chemicals
  • Printing Inks, Pigments & Construction Chemicals
  • Lubricants & Metalworking Fluids
  • Coatings, Adhesives & Sealants
Other Manufacturing
  • Consumer Products
  • Electronics & Electrical Assembly
  • Textiles & Nonwoven
  • Contract Manufacturing & Co-Packing
  • Packaging & Food-Contact Materials
  • Regulated Warehousing & Distribution
Explore all industries
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Why V5? Product & Features
Why V5?Product & Features
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Explore all industries
    • Bakery & Confectionery
    • Food Processing
    • Ingredients & Dry Mixes
    • Sausage & Meat Products
    • Produce Packing
    • Pet Food & Pet Supplements
    • Dairy & Chilled Foods
    • Beverages & Liquid Manufacturing
    • Infant Formula
    • Radiopharmaceuticals
    • Pharmaceutical
    • Medical Devices
    • Veterinary Pharmaceuticals
    • Blood & Tissue
    • Diagnostics & IVD Kits
    • Reference Materials & Standards
    • OTC Topical Creams & Gels
    • Dietary Supplements
    • Cosmetics & Personal Care
    • Cannabis & Hemp Manufacturing
    • Fragrances & Perfumery
    • Soaps & Personal Hygiene
    • Botanical Extracts & Essential Oils
    • Plastics & Resins
    • Agricultural Chemicals
    • Specialty & Industrial Chemicals
    • Printing Inks, Pigments & Construction Chemicals
    • Lubricants & Metalworking Fluids
    • Coatings, Adhesives & Sealants
    • Consumer Products
    • Electronics & Electrical Assembly
    • Textiles & Nonwoven
    • Contract Manufacturing & Co-Packing
    • Packaging & Food-Contact Materials
    • Regulated Warehousing & Distribution
PricingResourcesCompany
Start free trial Log in Talk to us
HomeGlossaryDrug Establishment Licence
Compliance · The complete guide

Drug Establishment Licence

In short

Drug Establishment Licence decisions depend on matching the Canadian building, authorised activities and foreign supply-chain route to controlled licensing records.

4,528 words · ~21 min read
Drug Establishment Licence: a reviewer compares a Canadian drug activity and foreign-building register with shipment records
The licence review concerns the actual activities and buildings in the proposed supply chain.
On this page
  1. 01What a Drug Establishment Licence means for a Canadian building
  2. 02DEL, product authorisation and other licences answer different operational questions
  3. 03Check Canadian product and activity scope before assigning a licence gate
  4. 04Read each domestic building section with its own foreign building annex
  5. 05Build a versioned licence, annex, evidence and route decision register
  6. 06Worked route decisions: C-A, C-B and the proposed foreign packager P-B
  7. 07Worked quantity decision: planned units are not released inventory
  8. 08Control amendments, status changes and superseded sections without rewriting history
  9. 09Connect purchasing, quality and logistics without turning matches into release
  10. 10Catch building mismatches, stale evidence and misleading status shortcuts
  11. 11Use a practical pre-import and site-activity review checklist
On this page · 11 sections
  1. 1What a Drug Establishment Licence means for a Canadian building
  2. 2DEL, product authorisation and other licences answer different operational questions
  3. 3Check Canadian product and activity scope before assigning a licence gate
  4. 4Read each domestic building section with its own foreign building annex
  5. 5Build a versioned licence, annex, evidence and route decision register
  6. 6Worked route decisions: C-A, C-B and the proposed foreign packager P-B
  7. 7Worked quantity decision: planned units are not released inventory
  8. 8Control amendments, status changes and superseded sections without rewriting history
  9. 9Connect purchasing, quality and logistics without turning matches into release
  10. 10Catch building mismatches, stale evidence and misleading status shortcuts
  11. 11Use a practical pre-import and site-activity review checklist
AI · Explain it for MY operation

How does Drug Establishment Licence apply to your shop floor?

Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.

Your scale

01What a Drug Establishment Licence means for a Canadian building

Drug Establishment Licence is a Canadian authorisation identifying the drug-related activities authorised at each listed domestic building, as described in GUI-0002, section 15, Domestic Buildings. Commonly shortened to DEL, the term is also called a Canadian drug establishment licence.

The practical question is not simply whether a company possesses a licence. It is whether the particular Canadian building and proposed drug route match the relevant controlled documents. A useful assessment starts with the building address, intended activity and drug category, then connects those details to the proposed supply chain. This keeps the review anchored to the operation being planned rather than a supplier’s company name or a general assurance of licensing.

A licence register and route assessment are practical controls, not prescribed statutory forms. Their purpose is to make the document comparison, assessment owner and implementation decision traceable. A quality agreement can help allocate responsibility for communicating route changes. The focus here is establishment scope and import implementation: translating building-specific documents into a reviewable decision before the proposed operation proceeds.

02DEL, product authorisation and other licences answer different operational questions

Drug Establishment Licence review is an establishment-scope check, not a substitute for product authorisation review. For practical document triage, separate the document being assessed from the decision it informs. The comparison below organises review work; it does not determine which Canadian licensing regime applies to a particular product or activity.

record or termquestion it helps answerinformation to reconcileseparate assessment still needed
DELWhat establishment scope is documented?Holder, Canadian building, activity, category, dosage form and associated annexProduct authorisation and actual supply-route assessment
DIN or product authorisationWhich product identity or authorisation is under review?Product identifier, formulation, strength, dosage form and authorisation recordEstablishment, building and activity scope
GMP evidenceWhat supports the building’s GMP assessment?Building address, assessed activities, evidence scope, dates and findingsIssued licensing scope and evidence acceptability
Natural health product site licenceWhich site-licensing record belongs in the NHP review?Named entity, sites and documented activitiesNHP product licensing and classification
Natural health product product licenceWhich NHP product record is being assessed?Product identity, licence identifier and documented particularsNHP site-licensing review
Medical device establishment licence, or MDELWhich establishment record belongs in the device review?Named entity, documented activities and establishment detailsDevice classification and product-specific authorisation assessment

Keep issued licensing documents and supporting GMP evidence as distinct record types. An inspection report can inform an evidence assessment without answering what an issued licence records. Likewise, a product identifier is not a building-and-activity reconciliation.

Route natural health product records through a separate NHP product-licensing review, and device records through the device review stream. Do not infer Canadian classification from a supplier’s marketing description. Where classification remains unresolved, record the question and assign an assessment owner before selecting the establishment-licensing gate. This avoids treating drugs, APIs, natural health products and devices as interchangeable licensing cases.

03Check Canadian product and activity scope before assigning a licence gate

For drugs in Canada, check the current text of C.01A.004 for the activity prohibition and its exceptions, and Part C, Division 1A for the Division’s application.

Keep Canadian regulations on the binding-law track and GUI-0002 on the interpretive-guidance track. For Canadian drug establishment licensing, GUI-0002 explains Part C, Division 1A; it is not a replacement for the regulations. Keep this assessment specific to Canada rather than transferring its conclusions to another jurisdiction.

Use an applicability worksheet before comparing the proposed supply route with licence entries. Identify the product, operation and applicable scope in each row.

Worksheet fieldRecord or resolve
Canadian product classificationClassification conclusion and its basis; flag unresolved questions.
Product presentationFinished dosage form or active pharmaceutical ingredient (API).
Actual activityDescribe the proposed work, not merely the company’s business label.
Domestic buildingIdentify the Canadian premises associated with that activity.
Foreign involvementIdentify participating foreign buildings and their proposed roles.
Exception assessmentDocument the product or activity exception considered and the conclusion.
Assessment ownerName the person responsible for resolving scope and approving the assessment.

Ask explicitly whether API wholesaling or distributing falls within the applicable scope; do not assign either an automatic DEL trigger. Likewise, manufacturer, importer, distributor, tester and wholesaler are not interchangeable activity descriptions. Describe the actual operation, and assess the proposed activity separately from other work performed by the same holder. Complete the product or activity exception assessment before route matching. An unresolved classification question should remain visible, rather than becoming an assumed licence requirement.

Worked-case scope assumption

For the worked cases, assume the fictional importer’s product/activity assessment has identified Canadian DEL import controls as applicable to the pharmaceutical finished dosage form scenario. This is a hypothetical scenario assumption, not a classification rule for every drug-related activity.

04Read each domestic building section with its own foreign building annex

For Canadian drug importers, the published GUI-0002 summary, Section 6 clarification explains that each foreign building annex is specific to one domestic building. A supplier match at company level therefore does not resolve the operational question: does the annex associated with the intended Canadian building match this particular import route?

The GUI-0002 summary and detailed document are April 2020 guidance, not a new legislative change. For Canadian drug licensing applicability, check the current Food and Drug Regulations, Part C, Division 1A; do not use either guidance page to displace current regulation. The summary identifies the guidance update as April 1st, 2020.

For Canadian drug importers, GUI-0002 section 15, Foreign Building Annex describes an annex identifying foreign fabrication, packaging/labelling and testing buildings associated with the Canadian building. It describes foreign-building information covering authorised activities, drug categories and whether sterile dosage forms are authorised for each activity and category. These are separate matching dimensions, not interchangeable descriptions of an approved supplier.

Match the route, not just the supplier name

A practical reconciliation key is: the holder and domestic building, their activity/category/dosage-form scope, and each foreign building’s role. The key identifies the specific relationship under assessment. Use the key to compare the planned supply chain with the relevant licence section and annex, reading applicable conditions alongside the matching records.

  • Start with the Canadian building responsible for the proposed import. Locate its associated annex before searching for foreign sites; reversing that sequence can conceal a domestic-building mismatch.
  • Identify each foreign building by its site identity and address, then assign its actual route role. A company operating several locations is not a sufficiently precise match.
  • Treat contract testing as a named route role. Record which building performs the testing rather than leaving testing buried in a supplier qualification file or inferred from a commercial relationship.

For an operational review, retain a role-by-role comparison: fabrication matched, packaging/labelling matched, testing matched, and conditions assessed. Keep unresolved fields visible rather than converting a partial match into a positive conclusion. Where an electronic batch record identifies the manufacturing and testing route, use those identifiers as comparison inputs—not as substitutes for the building-specific licence assessment. The result is a traceable scope comparison for subsequent quality review, not a batch-release decision.

From proposed activity to documented route decision
  1. 1
    Classify proposalIdentify Canadian product, activity and applicability questions.
  2. 2
    Identify buildingSelect the domestic building responsible for the proposal.
  3. 3
    Read issued scopeMatch activity, category, dosage form and conditions.
  4. 4
    Trace foreign rolesCompare each route building with its associated annex.
  5. 5
    Assess evidenceRecord relevant GMP evidence and unresolved questions.
  6. 6
    Resolve exceptionsHold affected proposals while scope changes are assessed.
  7. 7
    Record hand-offDocument the human decision and next quality-review stage.
A practical sequence connecting scope, building records, evidence and human assessment.

05Build a versioned licence, annex, evidence and route decision register

Drug Establishment Licence records are easier to reconcile when a controlled register connects documents to the route being assessed. The following model connects issued documents to proposed and actual routes.

Link the holder to each domestic building, its issued licence sections and applicable annex entries. Link each foreign entry to a physical building and its legal entity separately: a company name alone is not a building identifier. Record addresses, activity, category, dosage form and foreign building role so reviewers can compare the documented scope with the proposed route.

Keep document issue date, observation date, recorded date and any stated effective date in separate fields. Observation means when the reviewer checked the document; recorded means when the register entry was made. Do not infer an effective date from either. Store the source document, version identifier, superseded relationship, assessment owner and rationale.

Preserve historical assessments against the exact document versions used. A replacement section should create a new version and reassessment link, not silently alter an earlier conclusion. Include these changes in an audit trail review workflow.

For each GMP evidence review, record the subject building, relevant activity and category, evidence identifier, assessment status, reviewer and unresolved limitations. Keep file possession distinct from assessment: an attached report is an input, not an assessed route outcome.

Define the decision record as a controlled assessment of a particular proposed route and document set. Capture its owner, rationale and outstanding actions. Keep planned quantities separate from actual stock references; populate receipt references from the relevant goods receipt note, not from the proposal. This preserves the difference between intended movement and received inventory.

Suggested register relationships

Holder → Domestic building → Issued section version → Applicable annex entry Foreign legal entity → Physical foreign building ← Annex entry Physical foreign building → GMP evidence review Proposed route + Document versions + Evidence reviews → Human assessment → Decision Decision → Planned quantities Decision → Actual stock references, separately

A building-specific licence and route register

Holder

Identifies the responsible entity.

  • holder_id
  • legal_name

DomesticBuilding

Links location to holder.

  • building_id
  • holder_id
  • address

LicenceScope

Versions issued building scope.

  • section_id
  • version_id
  • building_id
  • activity
  • category
  • dosage_form
  • status
  • effective_on
  • supersedes_id

ForeignAnnexEntry

Connects foreign roles to scope.

  • entry_id
  • section_id
  • foreign_building_id
  • role
  • category
  • sterile_authorisation
  • conditions

EvidenceReview

Records assessed supporting evidence.

  • evidence_id
  • subject_id
  • scope
  • observed_on
  • owner
  • assessment

RouteDecision

Preserves proposal and decision.

  • route_id
  • lot_id
  • building_id
  • section_version_ids
  • foreign_entry_ids
  • evidence_ids
  • planned_units
  • actual_units
  • owner
  • decision
Suggested record relationships, not statutory forms.

06Worked route decisions: C-A, C-B and the proposed foreign packager P-B

Drug Establishment Licence route checks can be recorded as completed decisions against explicit document assumptions. I-CA, C-A, C-B, F-A, P-A, P-B, T-A, L-31 and L-32 are fictional identifiers, not actual companies or licence numbers. I-CA is the importer; C-A and C-B are its Canadian buildings. Both proposed lots concern the pharmaceutical finished dosage form category and non-sterile tablets. Neither lot is represented as imported, received or released.

Assume C-A’s issued scope covers import for that category and dosage form, and its associated foreign building annex records F-A as fabricator, P-A as packager/labeller and T-A as tester. For comparison, assume P-B appears in C-B’s issued section and associated annex for the same category and dosage-form scope. L-31 follows F-A → P-A → T-A; proposed L-32 substitutes P-B for P-A. The observation date, hypothetical Review Day, is relative to this scenario, not a calendar date. The matrix rows assess L-31, L-32 and the C-B comparison respectively; evidence-review assumptions are stated in each row.

entitydomestic buildingactivitycategorydosage formforeign building rolelicence section/annexobservation dateGMP evidenceassessment ownerdecision
I-CAC-Aimportpharmaceutical finished dosage formnon-sterile tabletF-A fabrication, P-A packaging/labelling and T-A testingReviewed C-A import section and associated foreign building annexhypothetical Review DayRelevant F-A, P-A and T-A evidence reviewed for the scenarioImporter regulatory reviewer with QA evidence reviewerL-31: eligible for the next quality review, not batch release.
I-CAC-Aimportpharmaceutical finished dosage formnon-sterile tabletF-A fabrication, P-B packaging/labelling and T-A testingC-A section and annex with no P-B entry recordedhypothetical Review DayF-A and T-A reviewed; P-B assessment unresolved for this routeImporter regulatory scope ownerL-32: hold import implementation pending authorised-scope and amendment assessment.
I-CAC-Bimportpharmaceutical finished dosage formnon-sterile tabletP-B packaging/labellingAssumed issued C-B section and associated annex recording P-Bhypothetical Review DayP-B evidence associated with the C-B record; C-A route assessment unresolvedImporter regulatory scope ownerReference information only for this C-A assessment, not automatic coverage of L-32.

These outcomes apply the building-specific relationship covered above. L-31 matches the assumed C-A route documents. L-32 does not: its changed packaging/labelling building is absent from the assumed C-A annex. The C-B comparison identifies a separate record to investigate, not a basis for transferring coverage. The unchanged fabricator and tester do not resolve that route-specific gap.

The operational hold is I-CA’s fictional control, not a prescribed statutory hold procedure. This matrix is a practice record, not a statutory form. Record the assessment’s limited purpose through a clear signature meaning statement: the reviewer signs the route assessment, not a batch disposition. Refer the unresolved P-B change to the named scope owner without converting the comparison row into an approval.

07Worked quantity decision: planned units are not released inventory

Drug Establishment Licence route review in this fictional example concerns 300 planned units for importer I-CA’s Canadian building C-A. It does not assert that any units have arrived, been booked into stock or been released. Of that quantity, 180 units use the documented route; 120 units use the proposed changed route involving foreign packager P-B.

The reconciliation is exact: 180 units + 120 units = 300 planned units.

planned unitsroute basisimplementation decisionactual-stock conclusion
180 unitsDocumented route for C-AProceed to the next quality-review stage, subject to remaining checks; no automatic release.Actual receipt and stock disposition are not assumed.
120 unitsProposed changed route using P-BHold from import implementation under the fictional site policy.Actual receipt and stock disposition are not assumed.

The hold applies to the proposed changed-route quantity. It does not create a conclusion about inventory that has not been identified. Record this as a planning decision, not an inventory transaction or a statutory form.

If actual stock is later identified, create a separately owned assessment linked to its receipt and lot records. Assign a responsible quality reviewer to determine its disposition rather than copying the planning decision into stock status.

Keep arithmetic and decision categories separate: a reconciled quantity is not a licensing, product-authorisation or batch-quality conclusion. Human batch release approval remains a separate decision.

08Control amendments, status changes and superseded sections without rewriting history

For Canadian drug establishments, GUI-0002’s Amendment Application guidance describes an amendment application as the route for an existing DEL holder wishing to change its DEL. This guidance does not replace the current-law checkpoint above. Use that Division 1A checkpoint to assess the scope and effect of an amendment, suspension, reinstatement or new-licence application; do not treat these processes as interchangeable through an internal status label.

A practical change-control workflow keeps the proposed change separate from the documents establishing issued scope. The following sequence is a suggested operating practice, not a statutory form:

  1. Identify the proposed change and its intended operational effect. Assess every affected domestic building, foreign building and supply route.
  2. Assign an assessment owner, identify the applicable submission and prepare it. Record unresolved scope questions rather than treating assumptions as approvals.
  3. Track submission status and correspondence separately from issued-document status. A submission receipt belongs in the application history, not in the field establishing the proposed scope.
  4. Receive and reconcile issued documents against the requested change. Identify which sections or annexes they replace and retain any unresolved differences for assessment.
  5. Reassess affected routes against the reconciled documents. Record the decision, owner and observation date before changing the operational route status.

For Canadian drug establishments, GUI-0002, section 15 explains that an amended DEL replaces only the affected section or annex. Operationally, reconcile a partially amended licence as a controlled collection of sections, rather than assuming the newest document replaces the entire collection. Keep a section-level index showing the current document and its predecessor, so reviewers can reconstruct which collection supported an earlier route decision.

Preserve superseded sections, earlier observations and past decisions. Record later corrections as dated changes with a reason and accountable reviewer; do not backdate the register to make a previous decision appear supported. Keep application progress, document receipt and operational assessment as separate entries. Do not infer NERBY deadlines, a new grace period or automatic restoration from a document’s age. An internal status label should report an assessed position, not create a statutory consequence.

09Connect purchasing, quality and logistics without turning matches into release

Drug Establishment Licence route assessments can support cross-functional hand-offs through a shared decision record. This is a proposed operating arrangement, not a statutory form or software feature. Exchange the route identifier, domestic building, foreign building roles, product/category and dosage-form information, applicable licence/annex and GMP evidence versions, and assessment outcome.

Procurement links that record to purchase-order revisions; supplier qualification links the relevant building evidence. Assign regulatory scope review to the regulatory affairs lead, GMP evidence assessment to the supplier quality lead, and import-planning decisions to the import operations manager. Logistics uses the assessed route for shipment planning; inventory records distinguish proposed quantities from actual receipts.

The quality unit receives the assessment and unresolved conditions through the QA process. Its subsequent product and batch review remains separate from the route comparison in the worked cases. For late supplier-route changes or revised purchase orders, compare the new route with the assessed version rather than carrying forward the earlier order approval.

For an unresolved discrepancy, use this recovery sequence within change control:

  1. Stop implementation of the affected proposal.
  2. Identify impacted routes and quantities.
  3. Preserve the assessed snapshot, including document versions.
  4. Assign investigation and change ownership to named people.
  5. Reconcile corrected documents against the proposed route.
  6. Repeat the affected scope, evidence and planning checks.
  7. Record the authorised human decision, conditions and hand-off recipients.

10Catch building mismatches, stale evidence and misleading status shortcuts

Practical lookup: public information and an unresolved supplier route

Start with Health Canada’s current drug and health products inspections service page. It explains that the Drug and Health Products Inspections Database (DHPID) provides inspection information for Canada and abroad, covers inspections since 2012, identifies licensed or registered establishments and replaces the former drug establishment licence live listing. Find the Drug and Health Product Portal under Related forms, services and information. Use the appropriate drug inspection/licensing search when available, not the separate medical-device establishment listing. A retrieved result establishes the public information displayed for the matched establishment at the observation time; it is not the controlled licence section or its associated annex.

Checked on 22 November 2026, the service page reports that DHPID is temporarily offline due to cybersecurity concerns while secure restoration work is underway. It identifies an official drug-GMP inquiry contact for people needing drug inspection information. Consult that linked service page for the current status and contact details rather than treating this dated observation as a permanent outage. A missing result, failed search or service outage does not establish that an establishment lacks a licence.

In a fictional supplier review DEL-LU1, reviewer R-1 searches for importer I-CA and Canadian building C-A, recording the legal name, literal address, query, source URL and observation date. If a result is available, retain the displayed inspection history, licensing information and any identity limitations as a separate public observation. If the service is unavailable, record ‘public lookup unavailable on observation date’ rather than ‘unlicensed’. Request the actual current issued C-A licence section, associated foreign-building annex and relevant status correspondence through the supplier’s controlled-document process.

For the proposed P-B packaging route already used in the worked cases, a favourable inspection observation or company-name match still does not establish P-B’s inclusion in C-A’s current annex. DEL-LU1 therefore records ‘C-A/P-B annex relationship unresolved’, assigns the regulatory scope reviewer, identifies the missing current annex reference and preserves the next closure action. The affected proposal remains pending under the company’s review procedure until that specific scope question is resolved; this is neither a finding that the supplier is unlicensed nor a batch-release conclusion. Keep the public lookup observation, issued-document comparison and human supplier-review outcome separate.

Use Health Canada’s establishment-licence index for navigation. As a document-control safeguard, base the operational assessment on controlled issued licence sections, annexes and relevant status correspondence—not an index entry or inspection link. The following are practical review controls, not statutory forms.

symptommistaken inferencecontrolescalation owner
Company name matches; building unidentifiedCompany match establishes scopeReturn to scope review; reconcile building identityRegulatory affairs
Unrecognised document revisionNewest-looking copy governsReturn to register; establish provenance and supersessionDocument control
Evidence assessment has no ownerFiled evidence remains acceptableReturn to register; assign assessor and check currencyQuality assurance
Route changed after reviewEarlier decision covers substitutionReturn to change control; reassess affected routeSupply-chain change owner
Document records conflictFavourable record settles statusReturn to register; reconcile issued scope and correspondenceRegulatory affairs

Keep unresolved identity, scope, evidence and status questions separately visible, each with an owner and closure basis. Resolving an address discrepancy does not close an evidence concern. Keep the affected decision pending until its relevant questions are resolved; retain the conflicting records and reconciliation rationale.

11Use a practical pre-import and site-activity review checklist

Use this suggested checklist to close the building-specific review described above. It is a practice record, not a statutory form. Create a separate assessment for each proposed import route or domestic site activity.

  1. Applicability: record the product classification, activity assessment and any applicable exception considered.
  2. Proposal: identify the intended domestic activity; assess proposed testing or packaging independently of an import-route conclusion.
  3. Building: confirm the legal entity, Canadian building identifier and address.
  4. Documents: identify the licence section, relevant annex versions and observation date.
  5. Foreign roles: where relevant, match each proposed fabricator, packager/labeller and tester using the earlier route method.
  6. Scope: compare the proposed category, dosage form and sterile status with the reviewed documents.
  7. Evidence: record the GMP evidence assessment and its limitations.
  8. Conditions: identify unresolved restrictions, missing information and actions needed.
  9. Changes: distinguish proposed amendments, pending applications and issued documents.
  10. Ownership: name the assessor and the person responsible for resolving each open item.
  11. Decision: record the outcome, rationale, date and next permitted operational step under site procedures.

Preserve earlier decisions through contemporaneous recording. Route unresolved mismatches through exception-based review, retaining the hold reason and documented reassessment rather than silently replacing the previous result.

Frequently asked questions

Q.How should a screenshot of a public listing be recorded when it differs from an issued document?+

Keep the public observation as its own dated evidence item. Record the query used, displayed entity or location, source URL and capture time, then identify the particular field that conflicts with the controlled document. For example, an abbreviated address and an absent activity require different questions. Do not label the screenshot an issued licence or overwrite the issued document with the displayed information. Send a specific clarification request to the regulatory owner, with both references, so the resolution addresses the actual conflict rather than merely confirming that a listing was viewed.

Q.How should an address abbreviation be assessed before creating another foreign-building record?+

Compare the literal source addresses and preserve both spellings while assessing whether they identify one physical location. A shortened street name is not automatically a new building, but a changed unit number, city or site identifier may be material. Ask for an explanation where the correspondence is unclear and record the basis of any mapping. Keep the proposed match distinct from a confirmed match; unresolved identity should remain visible to the route reviewer. This avoids both duplicate records for one location and an unsupported merger of two different locations.

Q.Who should resolve a disagreement between the regulatory scope reviewer and the GMP evidence reviewer?+

Use the escalation owner named in the company’s procedure, typically accountable quality leadership working with regulatory affairs. Keep the questions separate: whether the documented activity and building scope supports the route, and whether the GMP evidence is acceptable for the intended work. Neither reviewer’s positive conclusion should erase the other’s unresolved finding. Record both positions, the additional information needed, and the final rationale within the quality assurance process. Maintain the affected implementation hold while the disagreement remains unresolved.

Q.How should an email reporting a route change be converted into a reviewable proposal?+

Extract the changed role and location from the message and ask the sender to identify the affected lots and proposed implementation date. Attach the original correspondence so the reviewer can distinguish reported facts from internal interpretation. Identify whether the email describes planned work or work already completed; do not infer that status from a future shipping date alone. Record unanswered questions and the owner of each response through supplier change notification. A revised proposal should identify the superseded proposal while preserving the actual movement record separately.

Q.How should mixed API and finished-dose activities be documented without combining their scope conclusions?+

Use a separate conclusion for each identified product and activity. The worksheet should identify the current provision assessed, why it applies or does not apply to that row, and the reviewer responsible for the interpretation. An API distribution conclusion should not be copied into a finished-dose import row merely because one business performs both. Preserve the shared entity information without collapsing the separate applicability analyses. If an activity description is ambiguous, clarify the actual operation before reaching a conclusion rather than interpreting the company’s broad commercial description as the licensing scope.

Q.How should a reviewer handle a supplier name change without assuming that it is also a building change?+

Compare the previous and proposed legal names alongside the physical address, building identifier, ownership information, and activities. Request documentation explaining whether the event is a rename, ownership transfer, relocation, or combination. Preserve the former name as a searchable alias without overwriting the historical route record. Through change control, assess implications for licence documents, annex entries, GMP evidence, and agreements. Keep identity confirmed separate from document updates completed so that a naming explanation does not silently close outstanding scope questions.

Q.What should be assessed before an import-focused Canadian building starts a proposed testing or packaging activity?+

Start with the proposed operation, not the company’s general description as an importer. Identify the Canadian building, exact work, product category, dosage form, equipment, personnel, and intended start condition. Compare those facts with the issued activity scope and assess whether a licence amendment is needed before implementation. Separately evaluate facilities, methods, training, and GMP readiness through technology transfer. As an internal implementation gate, keep the activity proposed until regulatory and quality owners document their decisions; an application receipt is not an issued scope document.

Q.How should a decision reference be repaired when one archived annex file can no longer be opened?+

Record the broken evidence reference and the affected decision rather than silently replacing its target with a current annex. Seek an authentic copy of the exact version from the controlled archive or documented correspondence and record its provenance. If the former version cannot be recovered, make that evidence limitation explicit to the review owner; the current file does not establish what was assessed previously. Separate restoration of a file link from reassessment of a past conclusion. A documented evidence gap is preferable to a reconstructed history that falsely appears complete.

Primary sources

  • canada-guidance
  • canada-document
Talk to us about Drug Establishment Licence

Want to see how Drug Establishment Licence could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.

Start free
Back to glossary
Related terms
  • → Health Canada
  • → Change Control
  • → Quality Agreement

Next Step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse All Features

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.

V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal Centre

© S.G. Systems, LLC