V5 Ultimate
Ultimate
PricingResourcesCompany
English (original)العربيةDeutschΕλληνικάEspañolFrançaisItalianoעברית日本語한국어NederlandsPolskiPortuguêsSvenska
Talk to us Log in Start free trial
Food & Beverage
  • Bakery & Confectionery
  • Food Processing
  • Ingredients & Dry Mixes
  • Sausage & Meat Products
  • Produce Packing
  • Pet Food & Pet Supplements
  • Dairy & Chilled Foods
  • Beverages & Liquid Manufacturing
  • Infant Formula
Pharma & Life Sciences
  • Radiopharmaceuticals
  • Pharmaceutical
  • Medical Devices
  • Veterinary Pharmaceuticals
  • Blood & Tissue
  • Diagnostics & IVD Kits
  • Reference Materials & Standards
  • OTC Topical Creams & Gels
Supplements & Personal Care
  • Dietary Supplements
  • Cosmetics & Personal Care
  • Cannabis & Hemp Manufacturing
  • Fragrances & Perfumery
  • Soaps & Personal Hygiene
  • Botanical Extracts & Essential Oils
Chemicals & Materials
  • Plastics & Resins
  • Agricultural Chemicals
  • Specialty & Industrial Chemicals
  • Printing Inks, Pigments & Construction Chemicals
  • Lubricants & Metalworking Fluids
  • Coatings, Adhesives & Sealants
Other Manufacturing
  • Consumer Products
  • Electronics & Electrical Assembly
  • Textiles & Nonwoven
  • Contract Manufacturing & Co-Packing
  • Packaging & Food-Contact Materials
  • Regulated Warehousing & Distribution
Explore all industries
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Why V5? Product & Features
Why V5?Product & Features
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Explore all industries
    • Bakery & Confectionery
    • Food Processing
    • Ingredients & Dry Mixes
    • Sausage & Meat Products
    • Produce Packing
    • Pet Food & Pet Supplements
    • Dairy & Chilled Foods
    • Beverages & Liquid Manufacturing
    • Infant Formula
    • Radiopharmaceuticals
    • Pharmaceutical
    • Medical Devices
    • Veterinary Pharmaceuticals
    • Blood & Tissue
    • Diagnostics & IVD Kits
    • Reference Materials & Standards
    • OTC Topical Creams & Gels
    • Dietary Supplements
    • Cosmetics & Personal Care
    • Cannabis & Hemp Manufacturing
    • Fragrances & Perfumery
    • Soaps & Personal Hygiene
    • Botanical Extracts & Essential Oils
    • Plastics & Resins
    • Agricultural Chemicals
    • Specialty & Industrial Chemicals
    • Printing Inks, Pigments & Construction Chemicals
    • Lubricants & Metalworking Fluids
    • Coatings, Adhesives & Sealants
    • Consumer Products
    • Electronics & Electrical Assembly
    • Textiles & Nonwoven
    • Contract Manufacturing & Co-Packing
    • Packaging & Food-Contact Materials
    • Regulated Warehousing & Distribution
PricingResourcesCompany
Start free trial Log in Talk to us
HomeGlossarySkip Testing
Quality · The complete guide

Skip Testing

In short

Skip Testing is a justified, regulator-approved approach to selected release tests for new drug substances and products in markets applying ICH Q6A, using pre-selected batches or predetermined intervals rather than testing every batch.

4,420 words · ~21 min read
A gowned analyst points to a tablet grid of batch rows with green checks and one red mark while a colleague holds a green binder beside a numbered rack of ten sample vials.
Selected batches are tested on a fixed schedule, and a failed periodic result is traced back to the batches made since the last pass.
On this page
  1. 01Skip Testing
  2. 02Compare five approaches that change testing
  3. 03Specify the selection rule and eligible attributes
  4. 04Map the plan to the product and market
  5. 05Build the justification before changing execution
  6. 06Keep the plan, selection and disposition traceable
  7. 07Recover missing schedules, samples and results
  8. 08ST1: Calculate a residual-solvent testing schedule
  9. 09ST2: Respond to a failed periodic microbial test
  10. 10ST3: Reassess the plan after a supplier change
  11. 11Watch for weak evidence and misleading trends
  12. 12Check the complete plan before relying on it
On this page · 12 sections
  1. 1Skip Testing
  2. 2Compare five approaches that change testing
  3. 3Specify the selection rule and eligible attributes
  4. 4Map the plan to the product and market
  5. 5Build the justification before changing execution
  6. 6Keep the plan, selection and disposition traceable
  7. 7Recover missing schedules, samples and results
  8. 8ST1: Calculate a residual-solvent testing schedule
  9. 9ST2: Respond to a failed periodic microbial test
  10. 10ST3: Reassess the plan after a supplier change
  11. 11Watch for weak evidence and misleading trends
  12. 12Check the complete plan before relying on it
AI · Explain it for MY operation

How does Skip Testing apply to your shop floor?

Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.

Your scale

01Skip Testing

What Skip Testing changes—and what it does not

Skip Testing is the performance of specified release tests on pre-selected batches or at predetermined intervals, rather than on every batch, for new drug substances and products in markets applying ICH Q6A. This article uses periodic testing, skip lot testing, skip-lot testing and periodic or skip testing as search aliases for that pharmaceutical concept. It concerns a specific release-testing arrangement, not the whole ICH Q6 specifications framework.

For new drug substances and products in markets applying ICH Q6A, ICH Q6A section 2.1 recommends that this reduced testing schedule be justified, presented to the regulatory authority and approved before implementation. It is therefore not a blanket permission to omit tests or a GMP shortcut.

For new drug substances and products in markets applying ICH Q6A, the guidance preserves the continuing expectation: “those batches not being tested still must meet all acceptance criteria established for that product.” Reduced test execution is not reduced product acceptance: an untested batch is not exempt from the criteria for the periodic test.

The distinction here is between performing a specified release test on every batch and performing it according to a justified, approved periodic plan—not between acceptable and exempt batches. Supplier-certificate arrangements for incoming materials are a different decision, compared in the table below.

02Compare five approaches that change testing

These approaches change different parts of the evidence chain. Distinguish when evidence is generated, what it demonstrates and whether the specification still contains the test. The operational comparisons below do not establish regulatory authorization.

ApproachWhat changesWhat remains in the control strategyDecision boundary
Skip TestingAs defined above, execution follows the approved periodic plan.The selected test remains associated with the specification.Frequency changes, not specification membership.
In-process testing substituted for release testingA test performed during manufacture satisfies the specification requirement instead of a separate release test.The test stays in the specification, and its acceptance criterion is identical to or tighter than the release requirement.ICH Q6A section 2.3 expects the approach to be validated to show that results or product performance do not change from the in-process stage to finished product. Checks used only to adjust process parameters, such as core hardness, are not specification tests.
Parametric releaseA separate alternative to routine release testing.Evidence from the applicable parameter-monitoring program.For drug products in markets applying ICH Q6A, use is described in certain cases with regulatory approval; see section 2.6.
Reduced supplier testing using a CoASupplier results accompany incoming material; receiving-site testing is reduced.Supplier-document review and the receiving site's material-control strategy.This concerns incoming-material evidence, not an interchangeable finished-product release route; see certificate-of-analysis controls.
Test elimination from the specificationAn attribute or test is removed from the specification.The remaining control strategy, assessed separately.Removal differs from periodic execution; approval assessment belongs in the jurisdiction section.

The in-process row is easy to confuse with ordinary process checks. ICH Q6A section 2.3 separates two kinds: in-process tests used only to adjust process parameters within an operating range—its examples are hardness and friability of tablet cores that will be coated, and individual tablet weights—which are not included in the specification; and tests such as the pH of a solution whose acceptance criterion is identical to or tighter than the release requirement, which may satisfy the specification when included in it and validated to show no change through to finished product. Skip Testing changes neither category: it changes how often a specification test is executed at release, not where in the process the evidence is generated.

For terminally sterilized drug products in markets applying ICH Q6A, the section 2.6 example bases release of each batch on satisfactory monitoring of specific manufacturing parameters, including temperature, pressure and time during terminal sterilization. That batch-specific evidence distinguishes parametric release from simply scheduling a laboratory test less often. The comparison is about the basis of the decision, not merely the number of laboratory results.

03Specify the selection rule and eligible attributes

A reproducible plan separates batch selection from calendar selection. Practical scheduling designs include:

  • Pre-selected batches: define the eligible product, process and site population, then apply an ordinal rule. A practitioner example is selecting each designated ordinal position in a repeating sequence of eligible batches, with the starting position recorded.
  • Predetermined intervals: define the calendar window and sampling rule. A practitioner example is selecting the first eligible batch manufactured within each scheduled window, rather than whichever batch is easiest to sample.
  • Combined rules: specify whether either trigger selects a batch or both conditions must coincide, and how overlapping selections count.
  • Boundary conditions: define whether campaign transitions carry forward or reset the sequence. Record no-production windows without treating them as completed tests; specify the restart rule. Identify deliberately excluded batches and their rationale before selection, including whether they count toward the ordinal sequence.

For new drug substances and products in markets applying ICH Q6A, the specification-frequency discussion recommends identifying routine batch-by-batch tests and other tests, with the actual testing frequency indicated and justified. This connects scheduling to the guideline’s general concepts rather than establishing a default frequency.

For solid oral drug products, section 2.1 names residual solvents and microbiological testing as examples, not blanket eligibility categories; the approval boundary is the one stated in the opening section. Q6A also says Decision Tree #6 provides additional guidance on when microbial limits should be included. One of its outcome boxes, reached only after asking whether production lots consistently meet microbial limits acceptance criteria, reads: “Perform skip-lot testing for microbial limits, or provide scientific justification for no routine microbial limits testing.” Treat that box as the end of a product-specific path through the tree, not as a general option.

For injectable suspensions in markets applying ICH Q6A, Redispersibility says development data may be sufficient to justify skip-lot testing—not that they guarantee it. For rapidly dissolving parenteral products requiring reconstitution in those markets, Reconstitution time similarly says development and process-validation data may be sufficient to justify skip-lot testing.

Treat rheology, osmolarity and functionality tests as formulation-specific review prompts: check the current applicable Q6A attribute text before extending a rationale to them. Anchor attribute selection in the product’s critical quality attributes, not convenience or assay cost.

04Map the plan to the product and market

Assess a proposed periodic testing plan by product and destination market, not simply by manufacturing site. A useful applicability record identifies the product, market, approved specification, proposed change and regulatory decision needed before implementation.

New drug substances and products

For new drug substances and products in markets applying ICH Q6A, the specification-change discussion warns that changes to the specification after application approval may need prior regulatory approval. Treat the scientific justification and the market-specific implementation decision as separate review questions.

US finished pharmaceuticals

For US finished pharmaceuticals, check the current text of 21 CFR 211.165(a) for the scope of batch-release laboratory determinations. Frame the review around each batch's conformance, active-ingredient identity and strength, and release timing. Do not infer an exemption from ICH Q6A; assess the proposal within the broader 21 CFR 211 framework.

EU medicinal products and lifecycle changes

ICH Q12’s illustrative CTD table lists, under 3.2.P.5.1 Specification(s), the test method and acceptance criteria for each quality attribute on the drug-product specification; it does not assign a reporting category to a change in testing frequency. Use ICH Q12 lifecycle context, EU Type IB variation context, EU Type II variation context and QP release context for orientation only. For an EU medicinal-product change, consult the current jurisdiction-specific route for the actual proposal.

Other product sectors

Do not automatically extend this pharmaceutical concept to supplements, food, devices or chemicals. Assess each sector's testing framework and destination-market requirements independently before proposing reduced testing.

05Build the justification before changing execution

For new drug substances and products in markets applying ICH Q6A, section 2.1 recognises that application-stage data may be limited and consequently recommends generally implementing periodic testing post-approval. Generally is not an absolute timing rule. For those products and markets, ICH Q6A section 3.1.2 recommends that actual results form the primary basis of specification justification, rather than relying primarily on theoretical tolerances.

A practical justification dossier connects the proposed reduction in testing to evidence that remains relevant during the untested intervals:

  • Attribute risk: explain the consequence of an undetected failure and what could cause the attribute to change.
  • Analytical performance: describe method suitability, variability and sensitivity to meaningful deterioration.
  • Process understanding: connect control mechanisms to the attribute, using qualification evidence from process validation.
  • Representative history: identify the manufacturing conditions, sites and suppliers covered, including atypical results rather than only passing summaries.
  • Interval rationale: explain why the proposed spacing is appropriate, what failures could escape detection and which signals would trigger reassessment.

Use continued process verification for ongoing monitoring, not as a substitute for qualification evidence. Keep release-frequency reasoning distinct from a stability protocol: stability sampling investigates behaviour during storage, whereas the periodic release plan selects manufacturing batches for a specified release test. Stability results can inform the rationale without establishing the release interval by themselves.

Assign analytical personnel to method and result assessment, manufacturing to process-history coverage, quality to controlled execution and human disposition, and regulatory personnel to market-specific approval coordination. Controlled implementation follows the approval boundary described above; dossier completion alone does not activate a schedule. Record who confirms readiness and which approved plan version becomes effective.

From justification to controlled execution
  1. 1
    Build justificationAttribute risk, representative history and process understanding.
  2. 2
    Define the planSpecification, eligibility, frequency and exception rules.
  3. 3
    Obtain regulatory approvalApproval boundary described above.
  4. 4
    Execute the scheduleSelect batches and record due-test outcomes.
  5. 5
    Review the resultPass: human QA disposition. Failure: exception branch.
  6. 6
    Notify and investigateAuthority notification and population assessment as in ST2.
  7. 7
    Reinstate when indicatedEvidence-led batch-by-batch testing and justification review.
ICH Q6A lifecycle for new drug substances and products in markets applying the guideline.

06Keep the plan, selection and disposition traceable

The entities diagram at the end of this section is an evidence-design example, not an application feature or prescribed legal data model. Its linked identifiers connect the approved plan, each batch’s eligibility decision, the analytical result, any exception and the human disposition, so that a periodic result can always be traced back to the plan version that made it due.

Record eligibility and whether testing is due before results are available. Preserve the rule version and inputs used at that point; do not reconstruct eligibility after a favorable result. Link these decisions to the batch execution history so a reviewer can reconstruct what was due, what happened and who decided the batch outcome.

  • Not scheduled: the recorded rule did not select this batch.
  • Scheduled but pending: testing is due and no valid result is available yet.
  • Valid result: an accepted analytical result is linked, whether passing or failing.
  • Invalidated result: retain the result and link the documented invalidation rationale.
  • Missed scheduled test: the planned testing point passed without the required execution; link the exception.

A blank field is not evidence that a batch qualified for omission. For practitioner batch-release review, keep analytical status separate from human disposition. Capture the approver, decision time and rationale; no passing periodic result automatically releases associated untested batches.

Records behind a periodic-testing decision

Approved plan

Defines the governing test and selection rule.

  • plan_id
  • specification_version
  • test_id
  • selection_rule
  • frequency_basis
  • approval_reference
  • effective_from

Batch eligibility

Explains the scheduled-test decision.

  • batch_id
  • site_id
  • eligible_ordinal
  • plan_version
  • due_status
  • due_reason

Test result

Preserves analytical evidence and status.

  • sample_id
  • batch_id
  • test_id
  • result_value
  • result_unit
  • criteria_version
  • result_status

Exception or change

Links affected batches and response.

  • event_id
  • event_type
  • affected_batch_ids
  • last_passing_batch_id
  • assessment_reference
  • notification_reference

Human disposition

Records the accountable batch decision.

  • disposition_id
  • batch_id
  • decision
  • approver_id
  • approved_at
  • rationale_reference
Illustrative evidence relationships, not software capabilities or automatic release logic.

07Recover missing schedules, samples and results

A vendor-neutral manufacturing–laboratory handoff connects manufacturing batch records, laboratory schedules, result records, regulatory commitments and quality disposition. As an evidence-control practice, reconcile batch identity, test identity, units and plan version at each interface. Record each exception’s owner, affected records and recovery decision; retain the original entry and its correction.

ExceptionSuggested ownerRecords and documented recovery
Duplicate batch messageIntegration ownerReconcile message log and schedule; cancel duplicate work.
Missing sampleSampling leadTrace collection and receipt records; assess valid resampling.
Late resultLaboratory leadUpdate result and disposition records; QA assesses release impact.
Unit mismatchLaboratory reviewerCheck source result and method units; document any valid conversion.
Wrong plan versionPlan ownerRecalculate affected schedules against the applicable version; identify missed tests.

Treat a missed scheduled test as a deviation to assess, not a reason to move testing silently to a convenient later batch. This execution problem differs from ST2’s analytical failure. QA documents the recovery and makes the human disposition decision.

08ST1: Calculate a residual-solvent testing schedule

ST1 is a fictional practitioner case. Assume a solid oral drug product with a justified residual-solvent periodic plan already approved by the regulatory authority. All quantities below are fictional inputs, not regulatory limits or recommended frequencies. The interval N is 2 eligible batches; the unchanged solvent acceptance criterion is ≤50 mg/kg. Other release determinations remain separate and unchanged.

Before results exist, the plan fixes the eligible manufacturing sequence: a batch is due when its positive eligible ordinal is an exact multiple of N. In this plan, ordinals continue across campaign boundaries without restarting. Campaign B begins at ordinal 4; this continuity is a case convention, not a regulatory rule. The batch execution history preserves that sequence.

Batch identifierEligible ordinalSelection-rule outcomeTest statusResult and unitApplicable acceptance criterionHuman QA disposition
A011Not scheduledNot testedNo result≤50 mg/kgReleased after review
A022DueCompleted12 mg/kg≤50 mg/kgReleased after review
A033Not scheduledNot testedNo result≤50 mg/kgReleased after review
B044DueCompleted14 mg/kg≤50 mg/kgReleased after review
B055Not scheduledNot testedNo result≤50 mg/kgReleased after review
B066DueCompleted13 mg/kg≤50 mg/kgReleased after review

At the planning cutoff after B04, eligible history H = 4 batches, an exact multiple of N. Scheduled analyses = H ÷ N = 4 ÷ 2 = 2. Analyses not performed relative to batch-by-batch execution = H − H ÷ N = 4 − 2 = 2. The next due ordinal = H + N = 4 + 2 = 6. Execution then followed that schedule: B05 was not scheduled, and B06 was tested and passed.

The same arithmetic shows what a different interval would have meant, which is useful when a justification proposes a spacing. With N = 3 over the same six eligible batches, the due ordinals would be 3 and 6, so 6 ÷ 3 = 2 analyses and 6 − 2 = 4 batches untested; with N = 2 the six batches gave 3 analyses and 3 untested. The longer interval also lengthens the worst-case exposure run—the number of consecutive released batches between two tests—from 1 untested batch to 2. That exposure run, not the analytical cost saved, is what the interval rationale has to defend for the attribute concerned.

For every disposition shown, a human QA reviewer assessed the whole release record, including other release determinations and applicability of the approved plan. Untested batches received no inferred solvent result; solvent history alone did not authorize release. The control lesson is reproducibility: fixing selection before results prevents choosing only batches expected to produce favorable results.

09ST2: Respond to a failed periodic microbial test

ST2 is a fictional practitioner case involving solid oral drug tablets under a justified, authority-approved periodic plan. All quantities and limits below are illustrative. M100 was the last periodic pass. M103 returned a total aerobic microbial count of 500 CFU/g (colony-forming units per gram), exceeding the fictional acceptance limit of 100 CFU/g. Containment began after M104 manufacture, before any further distribution.

For new drug substances and products in markets applying ICH Q6A, ICH Q6A section 2.1 recommends proper notification of the appropriate regulatory authority when a periodic test fails its acceptance criteria; it recommends reinstating batch-by-batch release testing if the data demonstrate a need to restore routine testing.

The OOS investigation assessed laboratory controls, sampling and manufacturing records. No laboratory explanation invalidated M103; a passing repeat was not treated as cancellation. Investigation identified contamination exposure after M100 affecting M101–M104, supporting restoration of batch-by-batch testing.

Batch identifierRelation to last passing testPeriodic-test statusFinished-unit quantityDistribution statusAssessment outcomeHuman QA decision
M100Last passPassed8,000 tabletsDistributedOutside exposure windowRetain original disposition
M101After M100Untested10,000 tabletsDistributedExposure implicatedRecall
M102After M100Untested12,000 tabletsHeldExposure implicatedReject
M103After M100Failed11,000 tabletsHeldFailure upheldReject
M104After M100; containment endpointUntested9,000 tabletsHeldExposure implicatedReject

Assume each listed quantity is the entire finished batch, with no split distribution. The three untested batches—M101, M102 and M104—total 10,000 + 12,000 + 9,000 = 31,000 tablets. Adding failed M103 gives 42,000 assessed tablets: 32,000 held and 10,000 distributed at containment. M100 is a boundary reference, excluded from these totals.

The population rule is recalculable from the identifiers alone: every batch manufactured after the last passing periodic test (M100) and up to the containment point (M104) is in scope, so the count is 104 − 100 = 4 batches, of which 3 were untested and 1 failed. Defining the window from the last pass, rather than from the failed batch, is what prevents M101 and M102—made before the failure was known—from being overlooked.

The completed notification record identified the authority, submission date, failure, affected batches and follow-up communication. Human QA signed each disposition; M101's recall was a documented case-specific market decision, not an automatic rule. After remediation, the revised schedule selected every batch from M105 onward for microbial release testing. Linked corrective and preventive actions documented contamination controls and effectiveness checks; human QA retained release decisions.

10ST3: Reassess the plan after a supplier change

Fictional practitioner case: a drug-substance supplier transfers final drying to different equipment. The existing residual-solvent periodic plan assumed that the original dryer and drying endpoint consistently controlled solvent carryover. The new equipment changes bed depth and drying behaviour; that equipment-specific assumption no longer matches the manufacturing condition, even though the solvent used is unchanged.

The team opens change control covering the residual-solvent attribute, specification, analytical method suitability, material source, drying controls, destination markets and approval references. Supplier drying studies enter the supplier qualification review, but approved-supplier status is not treated as evidence of unchanged solvent removal.

The fictional review covers 23 batches: 20 unchanged-process batches + 3 changed-process batches = 23 batches. The post-change evidence population is separately calculated as 23 − 20 = 3 batches. All three receive residual-solvent testing and pass the existing acceptance criteria. Their results are not pooled with the older history to imply equivalent process performance.

The signed review concludes that the existing rationale does not cover the changed dryer. The affected periodic plan is suspended; interim testing covers residual solvents batch by batch while other release controls continue. Historical results retain their original supplier, equipment and process-version references. The team evaluates a revised strategy rather than simply restarting the old schedule.

Regulatory staff complete separate US and EU impact assessments against the product’s approval references and document each applicable change route; distribution remains blocked pending those actions. Human QA records separate dispositions: changed batches A and B remain held despite acceptable analytical results; batch C also remains held for an incomplete drying record. The case closes with the periodic plan documented as invalid for this changed condition—not with a universal rule that every supplier change resets testing.

11Watch for weak evidence and misleading trends

No observed failures is not the same as demonstrated control: a clean history can reflect selective sampling or limited detection. As a practitioner review principle, require the justification to match the attribute, manufacturing domain and detection limitations—not merely the number of passing results.

WeaknessConcrete review control
Only favorable history includedPredefine inclusion rules; document exclusions and their rationale.
Unlike sites or formulations pooledStratify history by site and formulation before assessing comparability.
Unexplained method changesTrace each result to its method version and assess comparability across versions.
Rising variability hidden by averagesReview individual results, spread and time order, not averages alone.
Unclear periodic-review ownershipName a decision owner responsible for conclusions, escalation and follow-through.

An out-of-trend assessment can examine drift or widening scatter before an acceptance failure occurs. That signal calls for evaluation of the plan’s continuing justification; it is distinct from the confirmed-failure response in ST2. Record the review conclusion and unresolved uncertainties, with escalation through management review where ownership or resources remain unresolved. Do not substitute an arbitrary minimum history, confidence level or capability threshold for an attribute-specific argument.

12Check the complete plan before relying on it

Use these practitioner review questions alongside the batch release checklist, not as additional regulatory requirements:

  • Are the product, manufacturing site and market within the plan’s scope?
  • Which specification version and approval reference govern this batch?
  • Is the frequency justified, and does the deterministic selection rule identify the same batches regardless of who applies it?
  • Does the supporting evidence remain representative of current materials, methods and operations?
  • Who owns scheduling, result review, escalation and periodic reassessment?
  • Are scheduled, pending, missed and unscheduled tests distinguishable, including when an unscheduled test remains pending?
  • Can reviewers identify the complete batch population since the last passing result?
  • Is human QA disposition recorded separately from test status?
  • Are reassessment triggers defined for attribute failure, meaningful trend, method change, supplier change, process change and loss of representativeness, with change control linked where applicable?

Use ST1–ST3 above for execution examples. Finally, can an independent reviewer reconstruct from the records why this batch was or was not selected, which plan governed it, and who made the disposition decision?

Frequently asked questions

Q.Does a long history of passing results make regulatory approval of a periodic testing plan unnecessary?+

No. Passing results support the justification described in the opening section; they do not replace regulatory approval. What a long history adds is an argument about representativeness: a practical submission connects the history to the proposed attribute, manufacturing conditions and selection frequency, shows that atypical results were included, and explains whether the history covers the sites and suppliers now in use. A high pass rate drawn from one campaign or one supplier says little about the others. The broader ICH Q6 framework helps distinguish specification design from permission to change testing.

Q.How should a certificate of analysis identify an attribute that was not tested on the reported batch?+

A practical reporting approach is to distinguish an attribute covered by a periodic plan from an actual batch-specific result. Identify the attribute as not tested on that batch under the applicable plan, and reference the controlled plan where the reporting format allows. Do not populate a numerical result using an earlier batch’s measurement or imply that testing occurred. Keep the selection decision and supporting authorization traceable in the electronic release record, with human review of the batch’s disposition.

Q.What happens when a predetermined testing interval expires during a period with no production?+

The plan should anticipate this situation rather than leave the laboratory to improvise. As a practical distinction, a calendar interval can expire during shutdown, while a batch-count trigger does not advance without eligible batches. Define how the next manufactured batch is selected, whether restart conditions warrant additional testing, and how an overdue calendar trigger is recorded. Do not silently restart the clock. If the plan is ambiguous, use change control to resolve the interpretation before relying on it.

Q.Can the same periodic testing plan cover different manufacturing sites, product strengths or destination markets?+

Treat shared coverage as something to demonstrate, not assume. A practical scope assessment maps each site, strength and destination market to the relevant specification, manufacturing process and authorization. Identify whether the attribute’s variability could differ with equipment, formulation or local processing conditions. Historical results from one combination may not represent another. Keep unsupported combinations outside the proposed shared scope until assessed. Organizing the rationale around the affected critical quality attribute makes the comparison more useful than simply pooling passing results.

Q.Can a result generated under a stability protocol substitute for a scheduled release test?+

Not merely because the analytical method or attribute name matches. A practical suitability review compares the sampled batch, sample age, storage conditions, sampling design, method and applicable acceptance criteria. A stored sample may answer a different question from a release sample. Treat proposed reuse as a documented assessment against the periodic plan, not an informal laboratory substitution. The stability program can provide supporting knowledge, but QA should resolve whether the particular result fits the intended release decision before relying on it.

Q.How should an invalidated laboratory result be distinguished from a confirmed periodic-test failure during an OOS investigation?+

Practically, distinguish a demonstrated laboratory cause that invalidates the original measurement from a valid result showing product failure; a passing retest alone does not establish that distinction. Preserve the original result and document the reasoning through the OOS investigation. For new drug substances and products in markets applying ICH Q6A, section 2.1 recommends proper authority notification for periodic-test failures and reinstatement of batch-by-batch release testing if the data demonstrate that need. Human reviewers assess implications for intervening untested batches.

Q.Does a dietary-supplement supplier CoA program authorize skip testing of a finished pharmaceutical product?+

No. The product category, jurisdiction and purpose differ, as the comparison table explains. The one point worth adding is organisational: when the same laboratory runs both a supplier-certificate programme and a finished-product periodic plan, keep their schedules, approvals and exception records separate so that a reduction in incoming-material testing is never read as evidence for the finished-product plan. Use supplier qualification for the supplier relationship.

Q.Who decides whether a suspended periodic plan can restart after an investigation or manufacturing change?+

A practical governance model assigns QA the documented internal decision, supported by technical owners and regulatory affairs; it does not treat investigation closure as automatic permission to restart. Review whether the original justification remains valid, whether corrective actions address the failure mechanism, and whether the intended scope or frequency has changed. Regulatory affairs assesses the applicable authorization and change pathway. Use ICH Q12 as lifecycle context, not a preset reporting category. Record the restart conditions and accountable human approval.

Primary sources

  • ICH Q6A — section 2.1 Periodic or Skip Testing and related attribute text
  • ICH Q12 — established conditions and reporting categories for post-approval changes
Talk to us about Skip Testing

Want to see how Skip Testing could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.

Start free
Back to glossary
Where this term comes up
Pharmaceutical
Related terms
  • → ICH Q6
  • → Batch Release
  • → OOS
  • → Change Control

Next Step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse All Features

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.

V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal Centre

© S.G. Systems, LLC