V5 runs the FAI: drawing balloon, characteristic list, Forms 1 / 2 / 3, measurement capture from CMM / calipers / gauges, non-conformance handling, supplier submission and customer approval — with delta-FAI logic that only re-inspects what actually changed.
Ballooned drawing in one PDF, Form 3 in Excel, measurement data pasted from CMM printouts — reconciliation is manual and error rate is high.
A minor characteristic change triggers a full re-inspection because nobody trusts the delta logic — cost and lead time explode.
Forms without matching balloon numbers, missing measurement records, wrong revision drawing — QA rejects and the loop restarts.
Upload PDF or STEP; balloon on-screen; auto-generate the characteristic list with tolerance, method and inspection frequency — the source of truth for Form 3.
Part number, revision, materials, processes, functional testing, special processes — pulled from the item master and routing, not typed twice.
CMM (PC-DMIS, Calypso, Modus), calipers, micrometers, height gauges, hardness — direct or barcode-driven capture with in-tolerance / out-of-tolerance auto-flagged.
Change in drawing revision, process, sub-tier supplier, material lot, tooling or 2-year lapse triggers targeted delta — with Rev C decision tree evidenced automatically.
Supplier submits FAIR through the portal with completeness check; customer QA reviews, approves or rejects with rationale — all e-signed and archived.
FAI (AS9102) is where aerospace and defence programs fail on the paperwork. Criteria below are what to check.
What it tests: Are Forms 1/2/3 generated per Rev C?
Why it matters: Prime contractors reject non-conforming forms outright.
V5: Rev C forms generated with validation.
What it tests: Is drawing ballooning linked to CAD annotations?
Why it matters: Manual ballooning drops characteristics.
V5: CAD-linked ballooning with characteristic capture.
What it tests: Is delta FAI vs full FAI decided by change class?
Why it matters: Missed delta FAI is program-critical.
V5: Change class drives delta / full decision.
What it tests: Do suppliers submit FAI to you via portal?
Why it matters: Email FAI is the failure mode.
V5: Supplier portal with in-record review.
What it tests: Does the system produce PPAP where automotive customers require it?
Why it matters: Programs cross industries.
V5: PPAP levels 1-5 outputs supported.
FAI approaches.
| Capability | Spreadsheet | Legacy QMS | V5 Ultimate |
|---|---|---|---|
| Rev C forms | Manual | Static template | Generated with validation |
| CAD-linked ballooning | PDF markup | Separate tool | Native |
| Delta FAI | Judgement | Manual | Change-driven |
| Supplier portal | Optional | Native |
FAI standards.
First article inspection for aerospace...
V5: Form generation, characteristic capture and submission per Rev C.
Production process verification...
V5: Process verification records tie to FAI submission.
Production Part Approval Process...
V5: PPAP outputs supported for cross-industry programs.
FAI lifecycle.
CAD-linked ballooning captures characteristics.
Production run captured under DHR.
Metrology data captured with instrument linkage.
Rev C forms delivered to customer portal.
Class-based decision automated.
FAI ROI is program throughput and customer confidence.
CAD-linked capture and form generation.
Validated Rev C outputs.
Programs typically expand supplier base once FAI is repeatable and fast.
Setting
An aerospace prime supplier.
Before
FAI cycle 3 weeks; occasional Rev C rejections.
After
FAI cycle 4 days; zero Rev C rejections in the last 12 months.
PDF ballooning is on-screen with AI-assist suggestions the inspector confirms; STEP ballooning reads the PMI/GD&T annotations directly where the model carries them.
PC-DMIS, Calypso, Modus, PolyWorks, Verisurf — direct results parsing. Others via CSV/XML export.
V5 keeps the last full FAIR as baseline; a change event (drawing rev, process, sub-tier, material, tooling, 2-year lapse) computes the delta scope automatically per AS9102 Rev C §5.4, and only the affected characteristics require re-measurement.