Human Readable Interpretation
Human Readable Interpretation is the printed, human-readable representation of the user data encoded in a GS1 barcode.

On this page · 10 sections
- 1What Human Readable Interpretation means
- 2HRI compared with other label information
- 3Application Identifiers, placement and legibility
- 4US device UDI: FDA forms and GS1 presentation
- 5Checking HRI during label assembly and acceptance
- 6Fictional record: a transposed lot on LBL-2207
- 7Recovery cases: stale artwork and replacement labels
- 8Records that make label acceptance traceable
- 9Failure modes and proportionate controls
- 10Keeping HRI checks valid after changes
How does Human Readable Interpretation apply to your shop floor?
Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.
01What Human Readable Interpretation means
Human Readable Interpretation (HRI) is the printed representation of GS1-structured barcode data in characters people can read, positioned below, beside or above the barcode, as described in the GS1 HRI guideline’s introduction and glossary.
The defining feature is the relationship between the readable characters and the encoded information—not simply the text’s proximity to a symbol. GS1’s explanation of HRI content describes correspondence with the encoded user data and Application Identifiers. A nearby line of text therefore cannot be identified as HRI from its location alone. The relevant question is what data it represents and whether it follows the GS1 structure and format.
This article uses HRI and GS1 HRI for that printed representation. It treats presentation punctuation and technical symbol characters separately, because comparing meaningful data is not the same task as comparing every character displayed by scanning software. It also distinguishes HRI from neighbouring label information before addressing the acceptance workflow. These boundaries keep the term useful when a label contains several readable identifiers, descriptions and dates.
The working example concerns a US device label at assembly and acceptance. It follows an inspector comparing printed HRI, decoded barcode data, the released label revision and the lot/serial assignment record. That is a practical comparison model, not a definition of HRI or a rule for every manufacturing sector. Readers needing the broader device-identifier context can start with unique device identification. The example does not establish labelling requirements for pharmaceuticals, supplements, food or chemicals.
02HRI compared with other label information
Not every readable line on a label is HRI. The GS1 guideline glossary distinguishes non-HRI text: it can express information also encoded in the barcode without following the GS1 HRI structure and format. The distinction concerns presentation, not whether the information is useful to an inspector.
| Information | What it represents | Appropriate comparison |
|---|---|---|
| HRI | The printed representation defined above. | Compare corresponding values with decoded data and authorised label inputs. |
| Non-HRI text | Readable information outside the GS1 HRI structure. | Compare meaning with the approved content; do not assume identical formatting. |
| Decoded scanner output | What the scanner and its software report from the symbol. | Compare reported fields with printed HRI and assigned run values. |
| Released label artwork | The approved revision's fixed content, layout and variable-field design. | Compare the printed label with the applicable released revision. |
| Lot and serial assignment record | The lot and serial values assigned to the particular manufacturing run. | Compare actual printed and decoded values with those assignments. |
In GS1 guideline section 3.2, Figure 3-11, Expiry date: Dec. 31, 2027 is labelled non-HRI text. This reader-friendly date presentation illustrates why an expiry statement should not automatically be treated as an HRI field. The example does not establish a date-format rule for every label.
For controlled device-label work, the table is a practical comparison framework, not a prescribed record architecture. A scan result reports data; it does not authorise them. Likewise, artwork approval establishes the approved design, while the assignment record supplies run-specific values. Keeping those roles separate makes discrepancies easier to locate.
HRI concerns presentation. Identifier structure is a separate topic; see UDI-DI and UDI-PI for that distinction.
03Application Identifiers, placement and legibility
For GS1 HRI, parentheses distinguish Application Identifiers (AIs) from their associated values. The GS1 HRI guideline section 3.7 calls for parentheses around AIs in the printed interpretation, but those parentheses are not encoded in the GS1 AIDC data carrier. Treat them as interpretation punctuation, not additional characters to insert into the encoded data.
Matching HRI to encoded user data is therefore not a literal comparison with every symbol-level character. The guideline’s glossary entry for HRI, section 4, excludes start, stop, shift and function characters, together with the symbol check character, from the printed interpretation. A practical comparison works field by field, distinguishing presentation punctuation and symbol-control characters from the data being checked. It does not treat every difference in a scanner’s displayed output as a label discrepancy.
For the GS1 DataMatrix example, HRI need not sit underneath the symbol. GS1 HRI guideline section 3.3.1 permits placement above, to the left or to the right. For these placements, the guideline calls for HRI to remain adjacent to, and obviously associated with, its corresponding carrier while protecting quiet zones. Barcode dimensions and quiet-zone assessment belong in barcode verification, rather than in a text-layout shortcut.
Legibility is the governing font consideration. GS1 HRI guideline section 3.6 calls for a clearly legible font. It separately accepts reasonable alternative type fonts and character sizes when the interpretation remains clearly legible. That supports evaluating the actual printed result rather than treating a preferred typeface as sufficient evidence of readability.
Line wrapping also needs deliberate control: GS1 HRI guideline section 3.4 says a single data element shall not be broken across two HRI lines. As a local design practice, include representative long field values in artwork proof approval. Review whether the layout preserves complete elements, readable characters and an obvious association with the symbol. This is a practical artwork review approach, not a separate GS1 approval procedure.
04US device UDI: FDA forms and GS1 presentation
For US devices, 21 CFR 801.40(a) requires that every UDI meet the technical requirements of §830.20 and be presented in two forms: easily readable plain-text under 801.40(a)(1) and automatic identification and data capture (AIDC) technology under 801.40(a)(2). In GS1 terms, the plain-text form is usually satisfied with HRI and the AIDC form with the barcode, but the regulation itself names the forms, not GS1 presentation rules. This mapping addresses those forms, not whether a particular device is subject to UDI requirements; the broader UDI overview covers that separate applicability review.
For US devices under 21 CFR 801.40(b), the UDI must include a device identifier segment. For US device labels under that provision, whenever the label includes a lot or batch number, a serial number, a manufacturing date or an expiration date, the UDI must include a production identifier segment conveying that information. These are the label-information categories relevant to reviewing the fictional example; they are not an instruction to add every category to its label. See UDI-DI versus UDI-PI for the structural distinction.
Keep FDA’s plain-text and AIDC terminology separate from the GS1 presentation guidance covered above. In an acceptance procedure, treat regulatory form, GS1 presentation and agreement with approved production data as distinct review questions. Do not use an HRI appearance check as the sole basis for a compliance conclusion.
The fictional assembly inspection is a locally selected acceptance control: compare printed HRI and decoded data against the released label revision and assignment record, then document the disposition. It is not presented here as a legally prescribed inspection method. Assign responsibility for that comparison in the local procedure rather than treating the choice of barcode format as an acceptance decision.
21 CFR 801.40(c) adds a conditional disclosure duty: if the AIDC technology is not evident upon visual examination of the label or device package, the label or device package must disclose the presence of AIDC technology. That is a separate check from HRI content. Consult 21 CFR 801.45 separately for direct-mark questions. Other jurisdictions and product categories remain outside this regulatory mapping.
05Checking HRI during label assembly and acceptance
In the fictional device workflow, label acceptance connects controlled inputs to a physical printed label and a recorded decision. The manufacturer’s procedure defines responsibilities, the extent and frequency of checking, and how discrepancies are handled. This is a practical acceptance model, not a universal inspection schedule.
- Establish the approved baseline. The person preparing the run identifies the applicable released label revision and packaging level through document control. Confirm release status from the controlled record, not from a filename, printer-job name or locally cached template. The revision establishes the approved template and fixed identity for that packaging level.
- Retrieve the expected variable values. The run preparer identifies the applicable assignment record for expiry, lot and serial values. Keep that reference distinct from the artwork approval: an approved layout is an input to acceptance, not evidence that the values selected for this run are correct.
- Inspect the physical output. The inspector examines an actual printed label from the identified run and captures its decoded barcode fields. Tie the capture to the label examined, rather than substituting a preview or printer data file. Record enough run and label identification to connect the evidence to label issuance and subsequent accountability.
- Compare field by field. For each identity or variable field, the inspector records the expected field, expected value and its controlling reference, decoded value, printed HRI value, comparison result and reviewer. Compare the decoded and printed values with each other and with the applicable approved or assigned value. Use the presentation conventions covered above rather than judging the overall appearance of a text line.
- Record the decision. The designated reviewer evaluates the comparisons and records acceptance or hold, with references to unresolved discrepancies. The decision identifies the label revision, assignment record, run and inspected output. A held label remains distinguishable from accepted output while its disposition is determined.
These comparisons answer different questions. Revision review establishes whether the intended template was selected; assignment review establishes which variable values belong on the label; physical inspection establishes what was actually printed and encoded. None substitutes for the others: matching HRI and barcode data can still carry an incorrectly assigned value.
- Select revisionConfirm released artwork and packaging level.
- Bind valuesUse approved lot and serial assignments.
- Capture labelRecord printed HRI and decoded fields.
- CompareCheck both against revision and assignments.
- HoldIsolate mismatches and record the cause.
- ReconcileAccount for physical labels from the run.
- DispositionAuthorised people decide release or further action.
06Fictional record: a transposed lot on LBL-2207
Assumptions: device label LBL-2207 revision D is released; the carrier is GS1 DataMatrix; inspection occurs at label assembly/acceptance; and the unit of examination is an individual physical label. All record identifiers and events below are illustrative. The values are fictional case inputs, not issuing-agency allocation advice. The released revision supplies the expected GTIN and field layout; the assignment record supplies expiry, lot and serial.
Comparison recorded against the physical label
The inspector scans the label, retains its decoded field values and compares each with both the printed HRI and its controlling record. The inspector also checks the field layout against revision D. The recorded results are:
| Field | Expected value and source | Decoded value | Printed HRI | Result |
|---|---|---|---|---|
| (01) GTIN | 09524810000339 — revision D | 09524810000339 | (01)09524810000339 | Agrees |
| (17) Expiry | 271231 — assignment record | 271231 | (17)271231 | Agrees |
| (10) Lot | LOT-KM — assignment record | LOT-KM | (10)LOT-MK | HRI character transposition |
| (21) Serial | SN-ALPHA — assignment record | SN-ALPHA | (21)SN-ALPHA | Agrees |
The decoded fields agree with their controlling records, and the layout agrees with revision D. The observed discrepancy is specific: the printed lot reverses K and M. It is not a failed scan or an incorrect encoded lot.
Assume this label also has a passing verifier result. A passing symbol-quality grade does not establish agreement between printed HRI and encoded user data. Here, the direct content comparison identifies a discrepancy that the passing grade does not resolve.
Hold, investigation and scope
The inspector holds the discrepant label and links its comparison record to the print run and assignment record through deviation handling. The observation remains separate from the investigation conclusion. For this fictional investigation, the assumed cause is that the HRI lot text was separately keyed during print setup and its character order was transposed; the encoded lot came from the correct assignment.
Finding this label does not establish the full affected scope. The investigation records which output shared that setup, whether setup changes define a defensible boundary, and whether labels were already applied. Its scope decision identifies the affected output and the basis for further label checks. Where the boundary remains uncertain, the record keeps that uncertainty explicit rather than treating the inspected label as an isolated event.
Reconciliation and disposition
The run record closes with label yield reconciliation, using physical labels—not devices—as the accounting unit. At the reconciliation checkpoint, each label belongs to one mutually exclusive category: applied; unused and returned; destroyed; or retained unapplied on hold. Returned labels are not also counted as held labels, and retained inspection labels remain accounted for.
Disposition of already-labelled devices is tracked separately, with links back to the affected labels. Authorised people decide disposition from the investigation, scope assessment and reconciliation. Producing a corrected print alone does not release the run.
07Recovery cases: stale artwork and replacement labels
Stale print-job selection
Assume a prior print job produces a physical label whose printed HRI and decoded GTIN both read 09524810000353, while released LBL-2207 revision D expects 09524810000339. These are hypothetical identifier values, not measured quantities. Agreement between the printed and encoded values does not establish agreement with the released revision: both outputs can carry the same wrong input.
For this case, assume the cause is a stale print-job reference. Hold the affected output, record that cause, and reselect the job through the local controlled process using the released revision and its label specification. Compare the newly printed physical label with the expected values again; correcting the selection alone is not evidence that the replacement output is acceptable.
Replacement for an assigned unit
Assume a replacement label is requested for the same physical unit already assigned serial SN-ALPHA. Keep the replacement request linked to that unit and its assignment record, and record the superseded label’s disposition. Compare the replacement physical label’s HRI and decoded fields with the released revision and assignment before acceptance. This example preserves traceability for a particular replacement; it does not establish a general serial-reuse rule.
Preserve the handoff and comparison evidence
For both cases, connect the released revision reference, assignment reference, print-job reference and acceptance result. A practical handoff carries expected values and revision identity together rather than independently re-entering them at printing and inspection. Retain the captured scanner output and identify any field parsing or display transformation used for comparison. Do not treat a formatted scanner display as a literal rendering of the encoded payload.
Evaluate corrections through the applicable local process: correcting a run-specific entry differs from changing the approved label design. Route changes to field mappings, template-selection logic or comparison logic through change control, rather than treating them as routine reprint corrections.
08Records that make label acceptance traceable
A useful acceptance record connects the released label revision, assigned values, print run, inspected physical label and final disposition. These references let a reviewer reconstruct which instructions and data produced the label, and why it was accepted or held. This is a technology-neutral practice model, not a mandatory database schema; record organisation depends on the manufacturer’s controlled procedures.
Keep the evidence types distinguishable. A physical-label image documents the visible label and its layout, within the image’s resolution. Decoded output records what the scanner returned from that specimen. Transcribed HRI fields record what the inspector read from the visible text; they are not a substitute for the image. Identify each value’s origin as assignment record, scanner output or visible label, rather than storing an unexplained lot value.
In the fictional LBL-2207 rev D case, retain the original transposed-lot observation and failed comparison when inspecting the corrected label. Link the correction and recheck to that finding rather than overwriting it. Record the reviewer’s identity, decision and relevant references, including the cause investigation and disposition. A successful recheck describes the corrected specimen; it does not change the earlier result.
Connect print-run accounting to label issuance, and place the acceptance evidence within the applicable manufacturing record using device history record context. The relationships below support reconstruction without requiring these particular record names.
Label revision
Defines approved identity and layout.
- label_id
- revision
- approval_status
- approved_gtin
- field_map_ref
UDI assignment
Supplies expected variable values.
- assignment_id
- label_revision_ref
- expiry_value
- lot_id
- serial_id
Print run
Connects printing to controlled inputs.
- run_id
- label_revision_ref
- assignment_set_ref
- print_job_ref
Acceptance check
Preserves observed content and comparison.
- inspection_id
- run_id
- label_image_ref
- decoded_fields
- hri_fields
- comparison_result
- checked_by
Disposition
Records investigation, accounting and approval.
- disposition_id
- inspection_id
- cause
- affected_scope
- reconciliation_totals
- disposition
- approved_by
09Failure modes and proportionate controls
Select controls by failure mechanism and by the handoff where an error could escape. The following are practical risk controls, not universal regulatory acceptance criteria. Each pairs an action with evidence a reviewer can inspect.
- Independently maintained HRI values: use a shared value source for printed HRI and barcode content to reduce separate entry opportunities. Retain the source reference and compare the physical label with decoded content; shared inputs alone do not demonstrate correct printing.
- Incorrect field binding: maintain a controlled mapping from each source field to its HRI and encoded destinations. Review representative output against that mapping. Retain the mapping revision and field-level comparison results, rather than only a general pass notation.
- Stale print-job selection: tie job selection to an explicit released label revision. Retain the selected template identity, revision and job reference so reviewers can establish which configuration produced the inspected output.
- Ambiguous text-to-symbol association: check that an inspector can identify which printed HRI belongs to each symbol on the finished label. Retain an annotated specimen or image showing the association checked.
- Incomplete exception records: link the mismatch, affected output, containment action and authorized disposition in a discrepancy record. Retain the basis for disposition and any repeat inspection result, rather than closing the issue with an unexplained reprint.
Shared sources and controlled mappings are preventive controls; physical-label comparisons are detection controls. Neither guarantees error elimination. Acceptance criteria should name the comparison—HRI against decoded content, or both against released inputs—and specify how a mismatch is held, investigated and dispositioned.
The fictional transposed-lot record above illustrates the content-versus-quality distinction. Keep symbol-quality methods within barcode verification; use content-comparison evidence to support the separate matching decision.
10Keeping HRI checks valid after changes
An HRI comparison that worked at validation can quietly stop working when something upstream changes. This section looks at the change points that most often break agreement between printed text and encoded data, rather than repeating the inspection steps above.
Artwork and layout changes. A new label revision can move, wrap or re-font the HRI lines. Before release, compare a printed proof of the new revision with decoded data from the same proof, field by field, and confirm the application identifier labels in parentheses still sit with the right values. Record the comparison against the revision in the artwork approval record.
Variable-data source changes. When the system that assigns lot or serial values, or the interface that feeds the printer, changes, both the encoded data and the HRI come from the new path. A test run that decodes the symbol and reads the HRI against the assignment record shows whether both still carry the intended value, and whether date formats in the HRI still match the encoded format the procedure expects.
Printer and media changes. A replacement print head, ribbon or label stock can leave the barcode readable while degrading small HRI characters, or the reverse. Treat legibility of the HRI and decodability of the symbol as separate results, and route a change of printing equipment or materials through change control with a defined re-check.
Check ownership explicitly: who selects the revision, approves assignments, sets up printing, performs comparisons, investigates discrepancies, reconciles labels and authorises disposition? Roles may be combined locally; unclear handoffs are the review concern.
Test exception readiness: identify a place to hold affected labels, a way to identify the potentially affected run, a method to preserve the original discrepancy, and an accountable route to disposition. Confirm these arrangements are usable before relying on them.
Supplier and site transfers. When label printing moves to a contract printer or another site, the receiving party needs the released revision, the field mapping between assigned data, encoded elements and HRI, and the agreed acceptance comparison. Ask for first-run evidence that pairs decoded values with images of the printed HRI before routine supply begins.
Frequently asked questions
Q.How can staff use HRI for manual entry when a barcode will not scan?+
Use a documented fallback workflow that identifies the intended field before transcription. Enter the printed value without guessing missing or unclear characters, and distinguish data characters from the display’s field labels. GS1’s HRI guideline, section 3.8 explains that technical encoding characters are not represented in HRI. As an operational safeguard, record the scan failure and manual-entry origin, then check the saved value against the label. Attributable recording helps preserve who performed that intervention.
Q.Can the same HRI concepts be applied to GS1-128 and GS1 DataMatrix?+
Yes. The GS1 HRI guideline, section 2 covers both barcode types. For an inspection procedure, use a common comparison method: associate the printed HRI with its symbol, decode the data, and compare the corresponding values against their approved source. Keep carrier-specific layout checks separate rather than copying an artwork arrangement unchanged. A transition involving GS1-128 is also a useful occasion to check that scanner output is presented consistently to inspectors.
Q.What should a reviewer do when several barcodes appear on the same label?+
Start by mapping each symbol to its intended purpose and associated text in the released artwork. Scan symbols individually so that an unintended successful read cannot be mistaken for acceptance of the intended symbol. Record which symbol produced each decoded result, particularly where nearby text could appear to belong to either barcode. An annotated label specification can make these associations explicit. If the association remains ambiguous, hold acceptance for clarification rather than infer it from proximity alone.
Q.How should an inspector resolve visually similar characters in a printed lot or serial value?+
Compare the disputed character with the authorised assignment record and decoded field, using the actual printed label rather than the artwork preview alone. Magnification may help inspection, but knowledge of the intended value does not make an ambiguous print acceptable. Record whether the issue is incorrect content, poor legibility, or both, and route it through the applicable acceptance procedure. Serialized unit tracking can provide context for locating the affected unit without treating neighbouring serials as proof.
Q.Should labels at different packaging levels be compared with the same released label record?+
Not by default. Select the released record applicable to the actual packaging level, product configuration, and label location. A shared product name or common lot does not establish that artwork and identifier assignments are interchangeable. Where a controlled record covers multiple levels, use its explicit mapping to select the relevant acceptance criteria. Keep the relationship between levels separate from label-content comparison; serialization aggregation addresses that relationship without substituting for the applicable released label record.
Q.What happens when the printed HRI and decoded data agree but the lot or serial assignment is still pending?+
Treat the agreement as a successful comparison, not as evidence that the value has been authorised for use. Under a practical acceptance workflow, keep the affected labels pending until the responsible person confirms the assignment through the approved process. Preserve the comparison result, but leave the assignment check unresolved rather than filling it retrospectively. An in-process quality gate can distinguish completed inspection work from the outstanding decision that prevents acceptance.
Q.What information belongs in a supplier handoff for outsourced label printing and acceptance?+
Provide the released artwork reference, applicable packaging configuration, variable-data source, field mapping, and agreed acceptance responsibilities. Specify how the supplier returns decoded results, representative printed labels, exception records, and reconciliation information. Include instructions for reprints and unused labels so a corrected print does not obscure the original discrepancy. Define who can authorise changes rather than permitting informal substitutions. The label issuance record can connect the authorised printing request with the labels received for acceptance.
Q.Who decides the disposition of devices already labelled before an HRI mismatch is discovered?+
The personnel authorised by the manufacturer’s quality procedures should decide disposition, with input from production, labelling specialists, and regulatory staff as appropriate. The discovering inspector should initiate containment and preserve the evidence, not independently decide that the discrepancy is harmless. Establish which devices received affected labels and whether any left controlled inventory. Assess relabelling, additional inspection, and any downstream action through the applicable procedure. Recall readiness supports traceability planning; discovery alone does not determine the final action.
Primary sources
Want to see how Human Readable Interpretation could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.
