PUPSITPre-Use Post-Sterilization Integrity Test
PUPSIT, pre-use post-sterilisation integrity testing, checks that a sterilising-grade filter is integral after it has been sterilised and before product is filtered. EU GMP Annex 1 expects it, while allowing alternatives where a documented risk assessment justifies them.

On this page · 18 sections
- 1What PUPSIT checks
- 2Integrity test methods
- 3Designing a PUPSIT system
- 4Risk-based justification
- 5Post-use testing still matters
- 6When a test fails
- 7Common pitfalls
- 8Practical points when executing PUPSIT
- 9Linking filter tests to the batch record
- 10Inside V5: recording filter use in context
- 11Explain it for your operation
- 12Why PUPSIT became contentious
- 13Single-use assemblies
- 14A practical PUPSIT example
- 15A proportionate implementation plan
- 16Internal review questions
- 17Records and evidence to retain
- 18Questions to ask when evaluating software
How does PUPSIT apply to your shop floor?
Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.
01What PUPSIT checks
Filters can be damaged during sterilisation or installation. A post-use integrity test detects failure after the fact; PUPSIT aims to detect damage before product is exposed.
A concern is filter masking: a damaged filter partially blocked by product might pass a post-use test. PUPSIT addresses that risk.
02Integrity test methods
Common non-destructive tests include bubble point, diffusion or forward flow, and pressure hold. Test parameters come from the filter manufacturer's validation for the specific wetting fluid.
The test method and limits should be qualified for the filter and fluid used.
03Designing a PUPSIT system
PUPSIT requires wetting and testing downstream of a sterilised filter without compromising sterility. This adds connections, valves and vents on the sterile side, each of which is a potential contamination risk.
Good design minimises sterile-side manipulations, uses closed or single-use assemblies and is qualified.
04Risk-based justification
Annex 1 accepts that PUPSIT may not always be possible, for example with very small volumes, and allows alternatives where a risk assessment justifies them and compliance is achieved.
Justifications should consider filter damage likelihood, masking potential, process design and supplier data.
05Post-use testing still matters
Post-use integrity testing remains expected. PUPSIT complements it rather than replacing it.
Failed post-use tests require investigation and batch impact assessment.
06When a test fails
A failed PUPSIT result can arise from improper wetting, leaks in the assembly, temperature effects or real filter damage. Retesting follows defined rules, often after re-wetting, before rejecting the filter.
Record each attempt and the conclusion; repeated testing without investigation is not acceptable.
07Common pitfalls
Pitfalls include adding sterile-side connections without considering contamination risk, inadequate wetting, unqualified test limits and weak documentation of retests.
Another is applying a generic justification to skip PUPSIT across all processes.
08Practical points when executing PUPSIT
- Design the filter assembly so the sterilised filter can be integrity tested without breaking the sterile boundary downstream.
- Define how wetting fluid is introduced and removed, and how its effect on the first product volume is handled.
- Record the test instrument, its calibration status, the test parameters and the pass limit on the batch record.
- Specify what happens on a failed test: re-wet and retest limits, filter replacement and investigation triggers.
Where a manufacturer decides PUPSIT is not feasible, EU GMP Annex 1 expects a documented risk-based justification. That justification should be reviewed whenever the filter, product or process changes.
09Linking filter tests to the batch record
Reviewers need to see pre-use and post-use integrity results next to the batch they protect. Capturing the results as structured fields, with the operator and time attached, makes it easier to confirm that both tests passed before the batch moves to release review.
Batch disposition remains a decision for the authorised person. A complete filter record supports that decision; it does not make it.
10Inside V5: recording filter use in context
V5 batch records, equipment and material records can capture filter identifiers, integrity test results and deviations against the batch, keeping them traceable.
V5 does not perform integrity tests or decide test acceptance. Qualified personnel and validated instruments do.
11Explain it for your operation
List every sterilising filtration step and record whether PUPSIT is performed or justified otherwise. Check that justifications reflect the current Annex 1 text.
Review failed tests over the past year for patterns.
12Why PUPSIT became contentious
Industry debate focused on whether the contamination risk of extra sterile-side manipulations outweighed the benefit of detecting rare damaged filters. Joint industry work studied filter masking and design approaches, informing current practice.
The outcome is that design quality matters: a well-engineered single-use assembly can make PUPSIT simpler and lower risk.
13Single-use assemblies
Pre-sterilised single-use assemblies with integrated wetting and drain bags can enable PUPSIT with fewer manipulations. Suppliers may provide integrity and sterilisation evidence for the assembly.
Qualify the assembly as part of the process and verify supplier documentation.
14A practical PUPSIT example
A pre-use bubble point test fails slightly below the limit. The operator follows the procedure to re-wet with the specified fluid and retests; the filter passes.
Investigation finds the wetting step was shortened. The procedure is clarified, the event is logged with both results, and trending is monitored.
15A proportionate implementation plan
- Confirm the applicable requirement, product scope and decision owner.
- Map the current method and the records already available.
- Define terms, responsibilities, evidence and exception handling in the approved procedure.
- Pilot the method on one representative process and challenge a difficult exception.
- Train affected roles, approve the change and monitor whether the method works as intended.
- Review after significant change and retain a transparent history of decisions.
Scale the formality to risk and complexity. A small operation still needs clear responsibilities and reconstructable evidence, while a multi-site operation also needs harmonised definitions, governance and comparison rules.
16Internal review questions
- Can a reviewer identify the source, owner, method and current approved version?
- Do summaries reconcile to original records and include unfavourable or missing evidence?
- Are exceptions visible, assessed and linked to the affected material, product or process?
- Are actions assigned, overdue items escalated and effectiveness reviewed?
- Have changes in product, supplier, equipment, method or regulation triggered reassessment?
- Does the record distinguish system support from the decision an authorised person made?
17Records and evidence to retain
- Approved scope, definitions and responsibilities for PUPSIT (Pre-Use Post-Sterilisation Integrity Testing).
- Source records and identifiers that let a reviewer reconstruct the work.
- Methods, assumptions, calculations, exclusions and any data-quality limitations.
- Exceptions, investigations, decisions, approvals and resulting actions.
- Version history showing when the approach changed and why.
Records should be proportionate to the decision and usable by someone who was not present. Preserve original evidence and corrections rather than replacing it with an unexplained summary.
18Questions to ask when evaluating software
- Can users trace every summary value back to its source record and version?
- How are roles, permissions, signatures and corrections recorded?
- Can the workflow reflect our approved procedure without inventing a universal rule?
- What happens during an outage, and how are later entries distinguished?
- Can we test the highest-risk exception with realistic data before committing?
- Which decisions remain explicitly assigned to an authorised person?
Frequently asked questions
Q.What is PUPSIT (Pre-Use Post-Sterilisation Integrity Testing)?+
PUPSIT, pre-use post-sterilisation integrity testing, checks that a sterilising-grade filter is integral after it has been sterilised and before product is filtered. EU GMP Annex 1 expects it, while allowing alternatives where a documented risk assessment justifies them.
Q.Is PUPSIT (Pre-Use Post-Sterilisation Integrity Testing) required in every operation?+
The applicable product rules, market, risk and approved quality system determine what is required. The method should be justified for the operation rather than copied without context.
Q.Can software make the final decision?+
No. Software can organise records, calculations and workflow, but authorised people remain responsible for planning commitments, scientific, quality and disposition decisions.
Q.How should a site start?+
Choose one bounded process, define the decision and evidence, test the method with real records, correct gaps, then expand under change control.
Q.What evidence should be retained?+
Keep the approved method, source records, assumptions, exceptions, review, decision, approval and any resulting action with enough context to reconstruct the work.
Q.Is a post-use integrity test still required if PUPSIT is performed?+
Yes. Pre-use post-sterilisation testing and post-use testing address different risks, and Annex 1 expects post-use integrity testing of sterilising filters.
Primary sources
Want to see how PUPSIT could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.
