QP Confirmation
Understand QP Confirmation for EU human medicines through its agreed scope, supporting records and review by the certifying Qualified Person.

On this page · 11 sections
- 1QP Confirmation
- 2Confirmation, certification and release describe different decisions
- 3The EU human-medicines regulatory map
- 4What an Appendix I confirmation contains
- 5Define responsibility before work crosses a site boundary
- 6Follow the confirmation from completed work to batch disposition
- 7Connect the signed statement to its supporting evidence
- 8Worked fictional cases: scope mismatch, identity mismatch and revision
- 9Handle document exchanges and recover from exceptions
- 10Recognise weak confirmations before they reach certification
- 11A practical review checklist
How does QP Confirmation apply to your shop floor?
Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.
01QP Confirmation
QP Confirmation is a Qualified Person’s signed statement that a defined process or test for an EU human medicine has been conducted in accordance with GMP and the applicable marketing-authorisation and/or technical-agreement requirements, as agreed in writing with the QP responsible for certifying the finished product batch.
The Annex 16 glossary gives the following definition. This article addresses its application to authorised EU human medicines:
Confirmation (Confirm and confirmed have equivalent meanings). A signed statement by a QP that a process or test has been conducted in accordance with GMP and the relevant marketing authorisation or clinical trial authorisation, product specification file and/or technical agreement, as applicable, as agreed in writing with the QP responsible for certifying the finished product batch before release. The QP providing a confirmation takes responsibility for those activities being confirmed.
For EU human-medicine site handovers, Annex 16 footnote 1 identifies where the confirmation’s content is set out:
Information required for the confirmation, where QP responsibilities for the batch are being transferred between sites, is presented in Appendix I to this Annex.
Qualified person confirmation, QP confirmation partial manufacture and Annex 16 confirmation are practical search aliases, not separate regulatory instruments. Readers needing background on the certifying role can start with QP release. The focus here is the signed statement, its defined scope and the responsibility attached to that scope.
02Confirmation, certification and release describe different decisions
These terms distinguish the work being confirmed, the finished batch being certified and the stock being made available. In operating procedures, use the specific decision name rather than treating every signed document or status change as release.
| Term | Scope | Decision or record | What it does not establish |
|---|---|---|---|
| QP confirmation | Defined partial work, as explained above. | Confirmation of that work. | Final certification of the finished-product batch. |
| QP certification | Finished-product batch for EU human medicines. | Under the Annex 16 general principles, point ii, the QP certifies batch compliance with GMP and its marketing authorisation. | That the subsequent stock-transfer stage has occurred. |
| Release for sale or transfer to saleable stock | The subsequent stock-disposition stage for EU human medicines. | Annex 16 general principles, point iii recommends taking QP certification into account when transferring the finished batch to saleable stock. | A substitute for the QP’s finished-batch certification. |
| Partial batch release | A quantity or portion of a batch. | Operational terminology for releasing a portion while another portion remains quarantined. | Confirmation of a manufacturing stage, or permission to use this release approach. |
| API GMP declaration or QP declaration on active substances | Active-substance GMP assurance. | A declaration concerning that assurance; this is a terminology comparison. | Confirmation of a specified finished-product batch operation. |
For commercial disposition, identify the MAH/commercial function and the stock-transfer operator according to the organisation’s documented arrangements; they need not be the same party. The practical distinction matters when interpreting QP release: identify which decision the term denotes. Likewise, partial batch release describes a quantity distinction, not the site-to-site handover discussed here.
03The EU human-medicines regulatory map
Legislation
The legal basis for the QP role in EU human medicines is Directive 2001/83/EC, Article 51 (consolidated text of 1 January 2025). Article 51(1)(a) makes the QP responsible for securing, “in the case of medicinal products manufactured within the Member States concerned, that each batch of medicinal products has been manufactured and checked in compliance with the laws in force in that Member State and in accordance with the requirements of the marketing authorization”. Article 51(3) adds that “the qualified person must certify in a register or equivalent document provided for that purpose, that each production batch satisfies the provisions of this Article”.
Notice what the Directive does and does not say. It places the batch-level duty, and the register entry, on the certifying QP. It does not mention confirmations at all. The confirmation is a GMP-guidance mechanism, set out in Annex 16, that lets the certifying QP discharge that statutory duty while relying on another QP for steps performed elsewhere. That is why a confirmation can support the Article 51(3) entry but can never stand in for it: the duty to certify each production batch stays with the person signing the register.
Official GMP guidance
For this discussion of EU human medicines, the Annex reference is the final European Commission Annex 16: Certification by a Qualified Person and Batch Release, dated 12 October 2015, with a stated deadline for coming into operation of 15 April 2016; it replaced the earlier version and should not be confused with the 2013 consultation draft. Consult the Commission’s EudraLex Volume 4 index for the current official listing.
For EU human medicines, the Annex 16 glossary, section 5 describes certification as being recorded by a QP in a register or equivalent document and expressly refers to Article 51 of Directive 2001/83/EC.
For EU human medicines, the Annex 16 scope states that the marketing authorisation defines the product’s basic batch-release arrangements; the Annex does not override them. See the Annex 16 glossary article for broader context.
Recommended operating practice
Treat proposed record fields, document links and workflow checks as practical review aids, not additional legal requirements. A useful procedure distinguishes the applicable obligation from the local control chosen to support it. Fictional decisions illustrate review reasoning rather than establish regulatory precedents; final disposition remains a human decision.
04What an Appendix I confirmation contains
The following is the exact content of Annex 16, Appendix I, applied here to EU human medicines. It is presented as official GMP guidance, separately from the recommended record-quality practices below.
Content of the confirmation of the partial manufacturing of a medicinal product [LETTER HEAD OF MANUFACTURER WHO CARRIED OUT THE MANUFACTURING ACTIVITY] 1. Name of the product and description of the manufacturing stage (e.g. paracetamol 500 mg tablets, primary packaging into blister packs). 2. Batch number. 3. Name and address of the site carrying out the partial manufacturing. 4. Reference to the Technical Quality Agreement (in accordance with Chapter 7 of the Guide). 5. Confirmation statement. I hereby confirm that the manufacturing stages referred to in the Technical Quality Agreement have been carried out in full compliance with the GMP requirements of the EU and the terms described in the Agreement for ensuring compliance with the requirements of the Marketing Authorisation(s) as provided by [Contract Giver/manufacturer certifying and releasing the batch]. 6. Name of the Qualified Person confirming the partial manufacturing. 7. Signature of Qualified Person confirming the partial manufacturing. 8. Date of signature.
Complete the fields precisely; keep review metadata separate
The following are recommended record-quality practices, not additional Appendix I fields. Their purpose is to make the signed statement interpretable without asking the receiving reviewer to infer its scope.
- Identify the actual operation. Describe the manufacturing stage performed rather than using a generic service description such as contract manufacturing. Match the wording to the work being confirmed, without implying coverage of other operations.
- Make the site address distinguishable. Use the operating location, not merely a group name or correspondence address. Where an organisation has several premises, make it possible to identify the particular premises involved.
- Resolve the agreement reference to a controlled version. A document identifier and applicable revision help the reviewer locate the agreement governing the confirmed work rather than a later replacement or an unrelated agreement.
Optional supporting review metadata can sit alongside the signed confirmation: the receiving reviewer, receipt date, linked evidence references and clarification status. Keep these distinguishable from the QP’s statement and signature. Administrative annotations should not appear to expand what the QP confirmed; a reviewer’s note is not a substitute for a corrected confirmation when the signed content needs correction.
For the neighbouring batch release certificate, use the comparison above to select the appropriate document rather than treating the names as interchangeable.
05Define responsibility before work crosses a site boundary
The confirmation expectation is tied to where the work happens. Annex 16, section 1.4 opens: “For manufacturing steps performed at sites in the EU each manufacturing site must have at least one QP.” Within that EU-site scope, section 1.4.1 provides that where a site only undertakes partial manufacturing operations, “a QP at that site must at least confirm that the operations undertaken by the site have been performed in accordance with GMP and the terms of the written agreement detailing the operations for which the site is responsible.” The market a product is destined for does not, by itself, place a non-EU subcontract site under this local-QP rule; steps performed outside the EU are handled through the importation and certification provisions that follow in section 1.5, which this article does not cover.
Section 1.4.2 explains why the mechanism exists: the certifying QP “may assume full responsibility for all stages of manufacture of the batch or this responsibility may be shared with other QPs who have provided confirmation for specified steps”, whether those QPs operate under the same manufacturing authorisation holder or a different one. Section 1.4.3 then requires that any such sharing “must be defined in a document formally agreed by all parties”, including who assesses the impact of deviations. In practice, that document is where most later disputes are settled, so its wording on deviation impact deserves as much care as the confirmation itself.
For EU human medicines, Annex 16, section 1.2 expects each confirming or certifying QP to have detailed knowledge of the steps for which that QP takes responsibility. For EU human medicines, section 1.4.1 also recommends access to the necessary marketing-authorisation details where the confirming QP is responsible for confirming those operations’ compliance with that authorisation.
As a practical control, build an operation-level responsibility map alongside the pharmaceutical quality agreement. Use a separate entry for each agreed activity rather than a broad description such as manufacturing services. The map is a review aid, not an additional prescribed Annex 16 form. Record:
- Work performed: the operation and the physical location where it occurs.
- Evidence generated: the records supporting completion and the team responsible for providing them.
- Deviation ownership: who investigates a deviation, assesses its implications and communicates the outcome.
- Confirmation scope: the activities the confirming QP takes responsibility for, with any boundaries stated explicitly.
- Escalation contact and handover recipient: who resolves questions and who receives the confirmation and supporting records.
Keep the physical site, contracting legal entity and postal address distinct in this map. A company name identifies an organisation; a correspondence address may not identify the premises performing the work. As a review practice, compare these identifiers with the agreement and relevant authorisation rather than treating a matching letterhead as proof of authorised scope. Before relying on the confirmation, resolve uncertainty about which premises performed which operation and which QP accepted responsibility for it.
06Follow the confirmation from completed work to batch disposition
A recommended confirmation lifecycle connects completed site work to an explicit human decision. Assign an owner to each handover and retain the evidence used at that point; the diagram below shows the sequence once, and the later sections refer back to it.
For EU human medicines, Annex 16, section 1.1 states that each finished-product batch must be certified by a QP within the EU before release for sale or supply in the EU or for export. For EU human medicines, section 4.2 recommends safeguards against transferring uncertified batches to saleable stock.
Recommended confirmation-record states are receipt, meaning the document has arrived; review pending, meaning assessment remains outstanding; clarification requested, identifying an unresolved question; accepted as supporting evidence, recording acceptance for the defined activity; and superseded, preserving an earlier version while identifying its replacement. These are administrative labels, not statutory status names. Keep them separate from the downstream QP release decision and stock disposition.
For EU human medicines, Annex 16, section 4.3 recommends defining certification-notification steps in a technical agreement for the site transferring the batch to saleable stock, with formal, unambiguous notification by a QP. In practice, communicate the actual decision and any unresolved restriction, rather than a generic completion message.
- Agree scopeIdentify the operation, site, agreement and responsible QPs.
- Complete activityRecord the work, results and relevant quality events.
- Assemble evidenceConnect batch identity, scope and supporting records.
- Confirm locallyThe confirming QP signs the scoped statement.
- Reconcile handoverReview identities, chronology, responsibilities and unresolved questions.
- Decide certificationThe certifying QP decides or withholds certification.
- Communicate dispositionResponsible personnel act on the recorded decision.
07Connect the signed statement to its supporting evidence
A useful evidence model connects product and batch identity to local batch identifiers, the performed operation, the actual site, the applicable agreement version, the signed confirmation and the receiving QP’s review. Treat these as relationships to test, not merely fields to populate. The example below is a recommended implementation model, not a complete mandatory schema.
| Record relationship | Review question |
|---|---|
| Product/batch ↔ local batch identifiers | What evidence establishes that these identifiers represent the same material? |
| Local batch ↔ operation ↔ actual site | Where was the work performed, and which records describe it? |
| Operation/date ↔ agreement version | Which agreed scope applied when the work occurred? |
| Signed confirmation ↔ supporting records | Which identifiable records support the activities confirmed? |
| Receiving QP review ↔ confirmation version | What conclusion was reached, by whom, and on what basis? |
Keep source documents separate from review metadata, and record the review conclusion with its basis. One detail is easy to miss: the confirmation signature date and the operation dates are different facts. A confirmation signed after a deviation was opened but before it was assessed may be accurate on the day it was signed and still incomplete for certification, so the model should hold both dates and the deviation status at signature.
Preserve signed originals and connect replacements through explicit supersession links. Resolve evidence references to identifiable records, including the relevant batch record, and retain the agreement version applicable at the time of operation rather than linking only to its current version.
The reconciled batch identity can connect the confirmation to a later batch release certificate. Include quantities only where needed to describe or reconcile the actual operation; this model sets neither universal limits nor retention periods.
Batch context
Connect local and finished-product identities.
- product_name
- finished_batch_id
- local_batch_id
- manufacturing_stage
Site scope
Identify the location and assessed operation.
- site_address
- authorisation_reference
- authorised_operations
- scope_effective_date
Responsibility agreement
Resolve the applicable responsibility boundary.
- agreement_reference
- agreement_version
- effective_from
- responsible_qp
Signed confirmation
Preserve the statement and its provenance.
- confirmation_id
- confirmation_statement
- qp_name
- qp_signature
- signed_at
- supersedes_id
Evidence review
Record the receiving QP's assessment.
- evidence_reference
- deviation_reference
- review_outcome
- certifying_qp
- decision_at
08Worked fictional cases: scope mismatch, identity mismatch and revision
These fictional training cases concern authorised human medicines in the EU. They use anonymised identifiers and documentary chronology rather than invented dates or numerical acceptance criteria. The review sequences illustrate cautious practice and human decisions, not legal conclusions about an actual batch or site.
Fictional Case Alpha: site and operation outside the documented scope
Assumptions: a subcontract site's confirmation for PRODUCT-ALPHA, BATCH-ALPHA names SITE-BETA at Example Campus, Example City, and includes repackaging. The applicable agreement, QTA-ALPHA, and authorisation records identify SITE-ALPHA and do not cover that stated site-operation combination. The confirming QP and certifying QP are different people.
The certifying QP builds a documentary chronology: actual operation date, agreement effective date, authorisation history and confirmation signature date. The review compares physical site identity, authorised operations, relevant deviations and allocation of responsibilities against the work recorded. Reviewing the historical scope of the pharmaceutical quality agreement matters more here than simply obtaining its latest signed version.
The reviewer keeps two explanations open: the confirmation may contain an incorrect address, or repackaging may actually have occurred outside the documented scope. Neither is assumed. Contemporaneous premises records, the applicable authorisation and its site details, executed repackaging records and a documented explanation from the confirming QP could substantiate a clerical mismatch. They need to establish where the activity actually occurred, not merely show that the organisations share a trading name.
In this case, certification is withheld while the discrepancy remains unresolved. A corrected confirmation is appropriate only when it accurately reflects substantiated facts. A newly signed agreement is not evidence of what the historical agreement covered. If the activity genuinely fell outside the documented scope, rewriting the confirmation cannot resolve the underlying issue: a separate quality and regulatory assessment examines the actual activity, applicable permissions, responsibility gap and implications for the batch before the certifying QP reconsiders the decision.
Fictional Case Beta: local testing identity does not match
Assumptions: a testing confirmation identifies LOCAL-BETA, while the certification package identifies BATCH-BETA. The reviewer follows sample receipt records, the chain of identity through laboratory handling, and the local-to-finished-batch mapping. The batch record provides production context against which that mapping can be checked.
A satisfactory analytical result does not itself establish which batch was tested. The reviewer looks for a documented connection between the received sample, LOCAL-BETA and BATCH-BETA, including any relabelling or identifier assignment. The case ends either with a substantiated mapping retained in the review package or with an unresolved review hold. It does not create a retesting rule: the immediate question is identity, not whether another result could be obtained.
Fictional Case Gamma: revision before final certification
Assumptions: a revised confirmation for BATCH-GAMMA arrives after the original has been reviewed but before final certification. The reviewer compares the changed scope and references, preserves both signed versions, identifies the superseding record and records the reason for replacement. The affected review returns to the certifying QP; the earlier review is not silently carried forward to changed content.
An audit trail review workflow can structure the examination of changes and acknowledgements. By contrast, a duplicate transmission of an unchanged signed record follows an administrative path: establish that it is identical, record receipt and avoid creating a competing authoritative version. A substantive revision prompts renewed human assessment of the affected evidence; neither receipt nor replacement constitutes certification.
09Handle document exchanges and recover from exceptions
For cross-site QP confirmation workflows, a practical exchange design connects document control with manufacturing records, laboratory records, quality-event records and inventory systems. Exchange stable batch identifiers, confirmation identity, signature date, document version and review reference. Preserve the relationship between the signed document and its supporting records when information is copied or transferred. An electronic release record can serve as the review reference without duplicating every underlying record.
For each exchange exception, assign an owner and record the reason, correction route and conclusions needing reassessment. Practical recovery actions include:
- Missing attachments: obtain the identified version and check that it belongs to the confirmation.
- Unresolved evidence links: restore access or establish a controlled replacement reference, then check the intended evidence.
- Duplicate deliveries: reconcile document identity and version before treating a delivery as new evidence.
- Stale master data: correct the authoritative record and assess which earlier mappings or reviews were affected.
- Interrupted review handover: identify the last completed review step, outstanding questions and the person accepting responsibility for continuation.
After recovery, reassess the affected conclusions and reconcile the confirmation record, the QP decision and the stock instruction against the lifecycle above. Where an interface carries the certification status to a warehouse system, configure it so that a confirmation received never changes stock status on its own; only the certifying QP's recorded decision should.
10Recognise weak confirmations before they reach certification
Use these practical diagnostic controls to test a confirmation’s substance, rather than treating a populated form as sufficient evidence.
| Failure mode | Specific review control |
|---|---|
| Confirmation signed by a QP not named for that site | Check the confirming QP against the site's authorisation and the responsibility document under section 1.4.3; a valid signature from the wrong person does not transfer responsibility. |
| Confirmation covers more operations than the site performed | Ask the confirming site to narrow the statement. A broad statement is not harmless: it suggests the confirming QP took responsibility for work done elsewhere. |
| Deviation still open at signature | Read the responsibility document for who assesses deviation impact, and obtain that assessment before certification rather than relying on the signature date. |
| Site moved premises during the agreement term | Establish the effective date of the move against the operation date; the confirmation must name the premises that actually did the work. |
Add an independent substance check: does the confirmation, read alongside the executed records and any approved change control affecting the site, demonstrate what happened, where it happened and which responsibility is being confirmed—not merely whether every field contains text?
11A practical review checklist
Use these practical questions when reviewing a QP confirmation for reliance by the receiving QP:
- Can the batch, site and operation each be named from the file alone?
- Does the responsibility document cover deviation impact for this operation?
- Was the agreement in force on the operation date?
- Has every revision been reconciled before the decision?
For each unresolved answer, identify the responsible reviewer and record what remains to be resolved. The responsible people resolve open questions and record their decisions; document completeness alone does not decide certification or commercial disposition.
For adjacent controls, see Annex 16, CAPA where a confirmation failure reveals a systemic gap, and data integrity for how signed records and their replacements are kept attributable.
Frequently asked questions
Q.What should the certifying Qualified Person do when a confirmation refers to supporting records that cannot be accessed?+
A practical response is to identify which inaccessible records affect the certification decision and ask the confirming QP to arrange access or a documented means of reviewing them. Record the request, the affected activities and the unresolved questions. Distinguish a temporary retrieval problem from records that are missing or cannot be traced. The certifying Qualified Person should withhold certification where the gap prevents a defensible assessment, rather than treating the signed confirmation as a substitute for resolving it.
Q.How can a reviewer distinguish a clerical site-address change from a change in the actual manufacturing site?+
Case Alpha above walks through the full review. The short version: a clerical change alters only the postal wording for the same premises, and the evidence for it is an address-history record from the site with an effective date. If buildings, rooms or operations moved, it is a site change and goes through the deviation or change route, not a correction to the confirmation.
Q.Can a satisfactory laboratory result resolve a mismatch between the operation performed and the operation described in a confirmation?+
No. As an evidence-review matter, a satisfactory result addresses the tested attribute, not whether the confirmation accurately identifies the work performed. Compare the executed instructions, laboratory records and confirmation scope to establish whether the mismatch is a description error or a different operation. Request a corrected confirmation or further investigation as appropriate. Preserve the original document and the reason for correction alongside the executed records, kept to ALCOA+ principles; do not use a passing result to close an unrelated scope discrepancy.
Q.How should a technical quality agreement be reviewed when subcontracted work changes while a batch is in progress?+
Treat it as a change before the work, not after. The confirming site should propose the change, the parties should amend the technical quality agreement and the section 1.4.3 responsibility document, and the certifying QP should accept it before the affected operation runs. If the work has already run under the old terms, Case Alpha's historical-scope review applies instead.
Q.Why does a confirmation covering one manufacturing stage not establish that partial batch release has occurred?+
Because the two answer different questions. The Annex 16 definition of confirmation is about responsibility for work; partial batch release, as compared in the terms table above, is about a quantity made available. To show that units changed status you need the disposition decision and stock history, which a stage confirmation does not contain.
Q.Can an API GMP declaration serve as the confirmation for a specific finished-product manufacturing operation?+
No. The comparison table above sets out why: the declaration concerns active-substance GMP, not a named finished-product operation. Where a site performs a finished-product step, request the confirmation for that step, and keep the declaration in the supplier qualification file where it belongs.
Q.What should happen if an error in an Annex 16 confirmation is discovered after the certifying QP has made a decision?+
Notify the certifying QP promptly and preserve the original confirmation. A practical assessment separates a transcription error from information that could change the decision, identifies affected batches and establishes their current distribution status. Link any corrected Annex 16 confirmation to the original, with the reason for correction and an attributable approval. The responsible people should assess whether containment, further investigation or reconsideration of disposition is appropriate; replacing the document alone does not resolve the potential impact on the earlier decision.
Q.How should a confirmation and a batch release certificate be connected when local and finished-product batch identifiers differ?+
Use an explicit, reviewed identifier cross-reference rather than relying on similar names or matching dates. Link the subcontractor’s local batch identifier, the operation performed and the finished-product batch identifier associated with the batch release certificate. Where work involves splits or combinations, show the applicable relationships and quantities with units. As a practical traceability control, retain the records supporting that mapping and identify who checked it, so a reviewer can follow either document back to the same manufacturing history.
Primary sources
Want to see how QP Confirmation could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.
