V5 Ultimate
Ultimate
PricingResourcesCompany
English (original)DeutschΕλληνικάEspañolFrançaisItalianoעברית日本語한국어NederlandsPolskiPortuguêsSvenska
Talk to us Log in Start free trial
Food & Beverage
  • Bakery & Confectionery
  • Food Processing
  • Ingredients & Dry Mixes
  • Sausage & Meat Products
  • Produce Packing
  • Pet Food & Pet Supplements
  • Dairy & Chilled Foods
  • Beverages & Liquid Manufacturing
  • Infant Formula
Pharma & Life Sciences
  • Radiopharmaceuticals
  • Pharmaceutical
  • Medical Devices
  • Veterinary Pharmaceuticals
  • Blood & Tissue
  • Diagnostics & IVD Kits
  • Reference Materials & Standards
  • OTC Topical Creams & Gels
Supplements & Personal Care
  • Dietary Supplements
  • Cosmetics & Personal Care
  • Cannabis & Hemp Manufacturing
  • Fragrances & Perfumery
  • Soaps & Personal Hygiene
  • Botanical Extracts & Essential Oils
Chemicals & Materials
  • Plastics & Resins
  • Agricultural Chemicals
  • Specialty & Industrial Chemicals
  • Printing Inks, Pigments & Construction Chemicals
  • Lubricants & Metalworking Fluids
  • Coatings, Adhesives & Sealants
Other Manufacturing
  • Consumer Products
  • Electronics & Electrical Assembly
  • Textiles & Nonwoven
  • Contract Manufacturing & Co-Packing
  • Packaging & Food-Contact Materials
  • Regulated Warehousing & Distribution
Explore all industries
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Why V5? Product & Features
Why V5?Product & Features
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Explore all industries
    • Bakery & Confectionery
    • Food Processing
    • Ingredients & Dry Mixes
    • Sausage & Meat Products
    • Produce Packing
    • Pet Food & Pet Supplements
    • Dairy & Chilled Foods
    • Beverages & Liquid Manufacturing
    • Infant Formula
    • Radiopharmaceuticals
    • Pharmaceutical
    • Medical Devices
    • Veterinary Pharmaceuticals
    • Blood & Tissue
    • Diagnostics & IVD Kits
    • Reference Materials & Standards
    • OTC Topical Creams & Gels
    • Dietary Supplements
    • Cosmetics & Personal Care
    • Cannabis & Hemp Manufacturing
    • Fragrances & Perfumery
    • Soaps & Personal Hygiene
    • Botanical Extracts & Essential Oils
    • Plastics & Resins
    • Agricultural Chemicals
    • Specialty & Industrial Chemicals
    • Printing Inks, Pigments & Construction Chemicals
    • Lubricants & Metalworking Fluids
    • Coatings, Adhesives & Sealants
    • Consumer Products
    • Electronics & Electrical Assembly
    • Textiles & Nonwoven
    • Contract Manufacturing & Co-Packing
    • Packaging & Food-Contact Materials
    • Regulated Warehousing & Distribution
PricingResourcesCompany
Start free trial Log in Talk to us
Home/Solutions

Availability × Performance × Quality

OEE calculated from recorded production and stops.

See OEE from your recorded runs and stops, with losses linked to their reasons.

Start free trial Talk to us
  • Availability from real stop events

    Every stop is captured with start, end, asset and reason code — planned downtime reported separately, never hidden inside the number.

  • Performance Against Nameplate Rate

    Actual cycle rate is compared to the rated speed per product, so micro-stops and speed losses surface instead of averaging away.

  • Quality from the Batch Record

    Good units versus total units come from the same in-process and release results QA already signs, and scrap is traced to root cause.

What goes wrong today3 common problems
  • OEE is calculated after the fact

    Numbers assembled from paper logs a week later cannot drive a shift meeting or an improvement decision.

  • Every Plant Defines OEE Differently

    When planned downtime is quietly excluded and micro-stops are ignored, the number looks great and means nothing.

  • Losses have no root cause attached

    You know the line lost four hours. You do not know to which asset, product, changeover or operator.

Everything V5 does here4 capabilities
  • Availability from real stop events

    Every stop is captured with start, end, asset and reason code — planned downtime reported separately, never hidden inside the number.

  • Performance Against Nameplate Rate

    Actual cycle rate is compared to the rated speed per product, so micro-stops and speed losses surface instead of averaging away.

  • Quality from the Batch Record

    Good units versus total units come from the same in-process and release results QA already signs, and scrap is traced to root cause.

  • Sliceable by Line, Shift, Product and Asset

    Compare the same product across lines or the same line across shifts, then drill into the events behind the difference.

Standards Referenced
  • ISO 22400 (KPIs for manufacturing operations management)
  • ISA-95 (enterprise-control system integration)
  • 21 CFR Part 11 (electronic records & signatures)
Related Pages
  • Food Processing
  • Consumer Products
  • Plastics & Resins
  • Maintenance & OEE
  • Analytics & KPIs
  • MES
  • ISO 22400
  • MTBF
Common questions5 answers
How is OEE calculated?
OEE is availability multiplied by performance multiplied by quality. Availability is run time divided by planned production time, performance is actual output divided by output at rated speed, and quality is good units divided by total units.
Does V5 hide planned downtime?
No. Planned downtime is excluded from availability by definition but reported alongside OEE so total asset utilisation stays visible.
Where does the data come from?
From execution: scans, weights, counts, stop events and in-process results captured as the line runs, plus device signals where a PLC or scale is connected through the device bridge.
Can we see OEE by shift and product?
Yes. Every event carries line, asset, product, order and shift, so OEE can be sliced any of those ways and drilled into event level.
Does it follow ISO 22400?
KPI definitions follow ISO 22400 terminology so figures are comparable across sites and with external benchmarks.

Next Step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse All Features

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.

V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal Centre

© S.G. Systems, LLC