MRPmulti-level, weekly, FEFO-honest.
V5's MRP explodes multi-level formulas against a Holt/Croston/Naive consensus forecast, walks on-hand lots earliest-expiry-first against weekly demand, pegs every requirement back to the firm sales order or forecast week that drove it, and groups planned buys into vendor-ready PO drafts you approve straight onto the supplier portal.
MRP that pegs every line back to a firm order.
Watch a real V5 MRP cycle: multi-level explosion across a 6-week horizon, FEFO lot-expiry-aware netting that flags stock you own but won't reach in time, every buy line pegged firm-SO vs forecast, and vendor-grouped auto-POs pushed straight to the supplier portal.
MRP sits in the middle — demand in, signed supply out.
Open sales orders, the consensus forecast, released-only lot on-hand, QC holds and preferred-vendor lead times all feed the planner. Approved POs flow out to the supplier portal — with the portal-ack timestamp flowing back onto the PO.
The edge cases a real planner lives in.
Textbook MRP assumes lead-times don't move, lots never hold, and sales never push a rush. Here are four moments where V5 doesn't shrug.
Lot expires before its demand week
FEFO walks lots earliest-expiry-first. Any residual that won't be consumed before its expiry week surfaces as an EXPIRING badge on the buy row — lot, at-risk qty, expiry date.
Need-by earlier than today + lead time
Planned release week goes negative — MRP flags the line as EXPEDITE (any_expedite). The planner sees every buy line that can't make its required week even if ordered today.
QC puts a lot on hold
FEFO netting walks released lots only. A lot moved to hold disappears from MRP availability the next run — no manual exclusion, no double-counting.
Rush SO mid-week
Re-run MRP and Save run. The History dialog lists every saved snapshot with headline counts and a Δ-vs-current column — Approve locks the new plan, Archive soft-deletes the old.
Just ask V5 — it knows the product cold.
Pick a question or type your own. V5 answers grounded in how mrp — multi-level weekly planning with fefo netting & auto-po | v5 ultimate actually behaves on the floor.
The rest of the platform this plugs into.
V5 isn't a bolt-on. Every module shares the same data, the same audit trail, the same operator. Pick where to look next.
MES
Operator-led execution: scan-gated dispense, step-by-step kiosk, equipment + scale integration, live yield. Built for regulated process & discrete manufacturing.
WMS
Receiving, putaway, transfers, cycle counts, picks, pack & ship — all lot-aware, bin-accurate, FEFO/FIFO-enforced and barcode-driven.
QMS
Built-in QMS: deviations, CAPA, supplier scorecards, in-process AQL, release-by-exception. Aligned with 21 CFR 211/820, ISO 13485 and 111.
Got questions, or want to see it on your shop floor?
Ask V5 — our code-aware assistant — or spin up a workspace. Both are free.

