Connect controls.Follow the process.Keep the readings.

Bring automated equipment into the production workflow: material targets, mixer parameters, line readiness and the record of what happened. Scope each PLC connection with your automation team, including what V5 reads, what it may write and what remains on the local HMI.

The machine signal joins the record.

AI assists.People check.
Start free trial
Engineers in hair covers, masks, safety glasses, coats and gloves reviewing a tablet beside a PLC cabinet, dosing hopper, mixer and conveyor
See it work

From production instructions to process evidence.

Five connection points to agree for an automated line. Direct setpoint writes and readiness handshakes must be confirmed for your equipment, not assumed.

Map the connection first.

Agree which tags carry targets, actuals and equipment status, and how they map to a V5 production step. Protocol compatibility alone does not prove a machine supports the required control operation.

PLC & automation: workflow and records

1. Map the connection first.

Agree which tags carry targets, actuals and equipment status, and how they map to a V5 production step.

Confirm OPC UA or Modbus TCP support, access permissions, engineering units and capture intervals with your automation team.

Acceptance
Protocol compatibility alone does not prove a machine supports the required control operation.

Protocol compatibility alone does not prove a machine supports the required control operation.

Connect

Equipment-specific implementation scope

Interface
PLC / gateway
Read tags
Mapped actuals
Write tags
Scope to confirm
Context
Work order + asset

Protocol compatibility alone does not prove a machine supports the required control operation.

2. Keep the addition with its material lot.

Scope automated dispensing around the formula target, source material lot, actual quantity and tolerance review.

Confirm how a target reaches the dosing controller and how the result comes back; retain manual steps where there is no suitable interface.

Acceptance
Dosing hardware performs the physical addition. Direct target transfer and exception handling need equipment-specific confirmation.

Dosing hardware performs the physical addition. Direct target transfer and exception handling need equipment-specific confirmation.

Dispense

Equipment-specific implementation scope

Target
Formula quantity
Material
Source lot
Actual
Quantity evidence
Exception
Review required

Dosing hardware performs the physical addition. Direct target transfer and exception handling need equipment-specific confirmation.

3. The instruction meets the process.

Keep mix time, speed and temperature instructions with the job, and record the actual process values for review.

Agree whether each setpoint is entered on the HMI or sent through a supported interface; do not assume automatic writes.

Acceptance
The PLC keeps its real-time control loop. V5 does not replace SCADA or the local HMI.

The PLC keeps its real-time control loop. V5 does not replace SCADA or the local HMI.

Mixer

Equipment-specific implementation scope

Mix time
Instruction target
Speed
Process parameter
Temperature
Recorded actual
Setpoint entry
HMI / confirmed interface

The PLC keeps its real-time control loop. V5 does not replace SCADA or the local HMI.

4. Make readiness part of the handover.

Scope line progression alongside previous-step review, equipment status and the cleaning evidence your process requires.

Agree the handshake, local/manual operation and the response to an interrupted connection before using it in production.

Acceptance
Machine safety, emergency stops and safety interlocks remain with the plant control system; a V5 run-permission handshake is not assumed.

Machine safety, emergency stops and safety interlocks remain with the plant control system; a V5 run-permission handshake is not assumed.

Line

Equipment-specific implementation scope

Previous step
Review status
Equipment
Readiness evidence
Cleaning
Required check
Handshake
Scope to confirm

Machine safety, emergency stops and safety interlocks remain with the plant control system; a V5 run-permission handshake is not assumed.

5. The equipment runs. People review.

Review recorded material quantities and process parameters in the context of the work order and equipment used.

Resolve gaps and excursions under your procedures. People approve instructions, review exceptions and decide product disposition.

Acceptance
A connected record is evidence for review, not automatic release, compliance or validation.

A connected record is evidence for review, not automatic release, compliance or validation.

Review

Equipment-specific implementation scope

Quantities
Material evidence
Parameters
Actual values
Exceptions
Human review
Disposition
Authorised person

A connected record is evidence for review, not automatic release, compliance or validation.

Where it fits

Between the instruction and the machine.

Connect production context and record review with your equipment, while your PLC, HMI and safety controls keep their responsibilities.

  1. InstructionsRecipe and work orderSee Instructions
  2. This pagePLC & AutomationAgreed connection scope
  3. EquipmentLocal control and safety
  4. Record reviewHuman exception decisionsSee Record review
V5 AI

AI and PLC & automation

Signals need an agreed interpretation

PLC & automation

Signals need an agreed interpretation

Use AI help to explore which equipment signals belong in execution records. PLC mappings and checks must be configured and verified separately.

AI use & review
What's included

Everything in this feature

Agree the interfaces, enabled functions and responsibilities for your line before implementation. Compare plans

Which plan and implementation does our line need?

Confirm the equipment, required read/write operations and acceptance tests with us. A protocol connection does not establish every control function. Heavily regulated operations requiring a validated environment need Enterprise private cloud with controlled upgrades; your team owns validation and approvals.

Material and process connections · Scope each operation

  • PLC / gateway connection

    Availability to confirm

    Confirm OPC UA or Modbus TCP support, permissions and tag mapping against your equipment list.

  • Automated dispensing interface

    Availability to confirm

    Agree target transfer, actual quantity capture, lot association and tolerance exception handling.

  • Mixer parameters

    Availability to confirm

    Confirm supported time, speed and temperature targets, units and returned values; HMI entry may remain necessary.

  • Line readiness

    Availability to confirm

    Define the required status checks and confirm any run-permission handshake with your automation team.

Implementation and review · Make the boundaries explicit

  • Connection gaps and recovery

    Availability to confirm

    Test timestamps, capture intervals, missing data and recovery. Never assume automatic replay or a universal safe-stop response.

  • Local operation and overrides

    Availability to confirm

    Define local/manual work and the reason, operator and review evidence required when an override is recorded in V5.

  • Batch-record context

    Availability to confirm

    Confirm which actuals and exceptions reach the record and how they remain associated with the equipment and work order.

  • Acceptance and change control

    Availability to confirm

    Your automation and quality teams test the intended use, approve mappings and govern subsequent changes.

Availability to confirm: the capability exists in V5, but which plans include it, and whether it is enabled for you, is not yet confirmed — ask us. Confirm control functionality and commercial scope with us. No universal machine compatibility, automatic release or safety-system replacement is promised.

Sample report

Explore the sample records.

Open a sample report to review its contents, supporting references and how the record is built.

  • V5Ultimate

    Sample report

    Electronic Batch Manufacturing Record (eBMR)

    Plan & make

    Electronic Batch Manufacturing Record (eBMR)

    3 pages · PDF

All sample reports and records
Free checklist3 pages · Online & printable · opens online

Batch Record Review Checklist

Use the existing batch-record review checklist for completeness, recorded exceptions and the hand-off to the person who decides release. It is not a PLC commissioning protocol.

What's inside
  • Record completeness check
  • Exception review log
  • Worked example with one exception
  • Release-decision hand-off

We ask for your name and email so we can handle this request. The full guide then opens on this site, ready to translate, print or save. Privacy policy.

Explore

More of the product

Start with one area. Add the rest when you are ready.

Start with one line and a clear connection scope.

Start a free trial or talk it through with us. No card needed.

Or (you can edit the question before sending).

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.