Approved Manufacturer List
An Approved Manufacturer List is a controlled record identifying which manufacturer part numbers are approved for an OEM part and revision at a specified site during a defined effective period.

On this page · 11 sections
- 1What an Approved Manufacturer List identifies
- 2AML versus AVL, supplier approval, BOM and as-built records
- 3US medical-device QMSR context and the limits of AML terminology
- 4The approval relationship: identity, site, dates and evidence
- 5From part evaluation to controlled use
- 6AML1: the approved distributor delivers an unlisted MPN
- 7AML2: add an alternate with defined site and effectivity
- 8AML3: trace builds that consumed the unlisted part
- 9Keep approval context intact across systems and outages
- 10Failure modes that make an AML look more reliable than it is
- 11A practical implementation and review checklist
How does Approved Manufacturer List apply to your shop floor?
Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.
01What an Approved Manufacturer List identifies
An Approved Manufacturer List is a controlled record identifying which manufacturer part numbers are approved for an OEM part and revision at a specified site during a defined effective period. In medical-device and regulated electronics assembly practice, it answers a specific sourcing question: which manufacturer's part is acceptable for this controlled design identity in this operating context?
The OEM part number is the organization's controlled design identity. The manufacturer part number, or MPN, is the manufacturer's product identity. Approval concerns the relationship between those identities, rather than the manufacturer name alone. A manufacturer may supply several superficially similar components, while only a particular MPN has been evaluated for the intended assembly. Likewise, accepting that MPN for one OEM part does not establish its suitability for every design that could physically accommodate it.
Common labels include AML, approved manufacturer part list and AML/AVL. Organizational terminology varies; these labels describe sourcing records or combined views, not separate regulatory document types. Readers should establish what each local label covers before interpreting an approval.
PTC's Managing the AML/AVL describes a table associating manufacturer and vendor parts with an OEM part within a sourcing context. This is vendor terminology, not regulatory guidance. For practical use, the relationship's scope matters as much as the listed identities: a search result showing an MPN without its applicable revision, site and dates leaves the approval question unresolved. Consistent production context tagging helps keep that context explicit when teams interpret sourcing information.
02AML versus AVL, supplier approval, BOM and as-built records
In regulated assembly practice, these records answer different questions. An organization may combine them in one system, but supplier qualification, purchasing-channel authorization, part approval, planned structure and actual consumption remain separate decisions. A shared screen does not make those decisions interchangeable.
| Record | Primary question | Typical controlled relationship | What it does not establish |
|---|---|---|---|
| AML | Which manufacturer part is authorized for this OEM part and context? | Manufacturer and MPN to OEM part and revision, scoped by site and effectivity. | Approval of the purchasing channel or proof of actual use. |
| AVL | Which vendor or distributor is authorized as a purchasing channel? | Vendor to purchasing scope; some organizations also maintain vendor-part relationships. | Approval of every MPN that vendor can deliver. |
| Approved supplier list | Which organizations are qualified, and for what scope? | Supplier organization to evaluated products, services or activities. | Approval of a particular MPN against a particular OEM revision. |
| BOM | What is planned for the product? | Product revision to component requirements and planned structure. | Actual consumption or, by itself, manufacturer-part approval. |
| As-built record | What material and identities were actually consumed? | Build, lot or serial identity to consumed components and recorded identities. | Authorization merely because a component was used. |
Keep these distinctions visible in material master data: a qualified supplier is not a substitute for a scoped MPN approval. Likewise, use batch execution history to investigate consumption rather than treating the planned BOM as proof of what entered a build.
PTC’s Managing the AML/AVL terminology describes sourcing status as approved, preferred or not used for a particular OEM part. Local procedures define the operational consequences of those labels. In practice, distinguish authorization from preference: a sourcing preference should not silently expand the approved OEM revision, site or effectivity scope.
03US medical-device QMSR context and the limits of AML terminology
For US finished medical devices intended for human use, 21 CFR 820.1(a) addresses controls for design, manufacture, packaging, labeling, storage, installation and servicing. This is a product-and-operations scope, not a rule to apply indiscriminately to every electronics assembly business.
For US medical-device manufacturers subject to Part 820, 21 CFR 820.7(b) incorporates ISO 13485:2016 by reference, including for 820.10. The standard, Medical devices—Quality management systems—Requirements for regulatory purposes, concerns medical-device quality management. For US medical-device purchasing-control scope under QMSR, consult 21 CFR 820.10 and the incorporated standard. The distinction between the regulation and standard is explained in QMSR versus ISO 13485.
An AML is one common organizational way to evidence controlled purchasing and approved-source decisions. Treat its name and structure as implementation choices, rather than presenting an AML as a universally prescribed FDA or ISO document. Vendor terminology describes how a software system organizes sourcing relationships; it does not establish regulatory obligations. An organization can explain its chosen record structure and terminology in its quality manual or supporting procedures.
For general electronics assembly and other markets, distinguish organizational procedures and contractual sourcing controls from US medical-device applicability. Before transferring a regulatory conclusion, check the applicable jurisdiction, product category and operations. Keep the basis for each control explicit: legal obligation, customer agreement or internal purchasing practice.
04The approval relationship: identity, site, dates and evidence
A practical AML schema treats approval as a relationship, not a flag on a manufacturer’s name. Use manufacturer identity plus MPN as the manufacturer-part identity, and OEM part plus revision as the design identity. Preserve meaningful MPN suffixes: removing a packaging, grade or temperature-range suffix can collapse distinct parts into a misleading match. Map manufacturer aliases to a stable identity; assess actual manufacturer identity changes separately rather than treating them as spelling corrections.
The fictional baseline below illustrates the relationship. Site means the consuming or assembling site. A manufacturer’s production location, when relevant to approval, belongs in a separate attribute or restriction—not in the same site field. This distinction keeps production context unambiguous.
| OEM part | Revision | MPN | Manufacturer | Sourcing status | Site | Effective-from date |
|---|---|---|---|---|---|---|
| TEMP-SENSOR | C | AL-TEMP | Alder Components | approved | North | baseline_effective_from |
Data-model diagram: OEM part + revision → scoped approval relationship ← manufacturer identity + MPN; relationship → consuming site + effectivity interval + status + restrictions; relationship version → approval decision + supporting evidence.
Supporting fields make the row interpretable: effective-to date, approval identifier, decision reference, approver, approval timestamp and restrictions. Keep the approval identifier stable across linked records, while identifying each historical relationship version separately. Restrictions can identify an allowed assembly, application or manufacturer production location; record an explicit absence of restrictions rather than leaving users to interpret an empty field.
Define the revision effectivity convention explicitly. For this schema, the interval includes effective-from and excludes effective-to. An open-ended record has no scheduled end; it does not authorize use before baseline_effective_from. Specify which business event is tested—such as receipt or component issue—and use its recorded event time consistently. If both events need checks, evaluate each separately. Define time zone and date-only boundary handling.
The approval timestamp records when the approver made the decision; effective-from records when the relationship becomes applicable. They can differ, so a later decision does not by itself establish approval for an earlier event.
Link the decision to identified specification revisions, evaluation results, the approved change and the basis for restrictions. Preserve historical relationship versions and their evidence references instead of overwriting them when an alternate is approved. That preserves the context needed to reconstruct an earlier receipt or build without applying today’s approval state retrospectively.
OEM part revision
Controlled design identity.
- oem_part_id
- revision
- specification_ref
Manufacturer part
Actual manufacturer's product identity.
- manufacturer_part_id
- manufacturer_id
- manufacturer_name
- mpn
Sourcing approval
Versioned authorization and context.
- approval_id
- approval_version
- oem_part_id
- revision
- manufacturer_part_id
- sourcing_status
- consuming_site_id
- effective_from
- effective_to
- change_record_id
- approver_id
- approved_at
Receipt lot
Observed identity and receiving decision.
- receipt_id
- supplier_id
- manufacturer_part_id
- component_lot_id
- evaluated_at
- disposition_ref
Build consumption
Actual use and historical linkage.
- build_id
- dhr_ref
- receipt_id
- component_lot_id
- approval_id
- approval_version
- consumed_at
- quantity_pieces
05From part evaluation to controlled use
A practical AML lifecycle starts with a defined need: a new design, an alternate source, or a proposed restriction on an existing manufacturer part. The request identifies the affected OEM part and revision, intended use, and proposed manufacturing sites. It initiates evaluation rather than granting permission to buy or use the candidate.
- Engineering evaluates the candidate for its intended use: specification fit, mechanical and electrical interfaces, materials, processing compatibility, reliability concerns, and relevant production evidence. Evaluation depth follows component risk and the proposed application; there is no universal test package or fixed acceptance threshold.
- Quality reviews the evaluation record, unresolved concerns, proposed controls, and approval conditions under local procedures. Engineering conclusions and quality review remain identifiable rather than disappearing into a single sourcing-status field.
- Designated human approvers authorize additions, restrictions, and withdrawals through change control. Publication carries the approved OEM revision, manufacturer identity, MPN, sourcing status, site scope, and effective-from date. A future approval remains distinguishable from permission applicable today.
- Purchasing executes orders against the applicable published relationship and communicates identity and substitution constraints. Buyers route proposed substitutions for evaluation rather than treating availability or price as technical approval.
- Material handling preserves identity and lot traceability through receipt, storage, issue, and consumption. Incoming inspection checks actual manufacturer identity and MPN against the applicable approval relationship, including revision, site, and effectivity. Production records then link the consumed manufacturer part and lot to the build.
Supplier change notification feeds this lifecycle when a change may affect the evaluation basis; the notification is not approval of the changed manufacturer part. Source inspection remains a separate activity and does not itself establish AML approval.
Approval and disposition authority stays with designated people. Published sourcing data supports their decisions but does not independently release received material or finished devices. Local procedures commonly identify who can resolve disagreements and who can authorize use when conditions remain open.
- Define contextIdentify OEM part, revision, consuming site and intended application.
- Evaluate candidateAssess manufacturer identity, MPN, technical differences and supporting evidence.
- Authorize relationshipDesignated reviewers decide status, restrictions and effectivity.
- Publish decisionDistribute the controlled version and reconcile downstream acknowledgment.
- Check receiptCompare actual identity with the applicable scoped approval.
- Resolve exceptionHold mismatches; humans investigate and record disposition.
- Link actual buildRetain component-lot consumption and historical approval references.
06AML1: the approved distributor delivers an unlisted MPN
Fictional assumptions: Harbor Supply is an approved distributor. The order and delivery identify OEM part TEMP-SENSOR, revision C, for site North. The applicable AML relationship approves Alder Components AL-TEMP and is already effective at receipt. Physical receipt instead identifies Brook Devices BK-TEMP. Distributor approval does not resolve this manufacturer-part mismatch.
| OEM part | Revision | MPN | Manufacturer | Sourcing status | Site | Effective-from date |
|---|---|---|---|---|---|---|
| TEMP-SENSOR | C | AL-TEMP | Alder Components | Approved | North | Precedes receipt (assumed) |
| TEMP-SENSOR | C | BK-TEMP | Brook Devices | Receipt observation: no matching AML relationship | North | Not applicable—no matching relationship |
Receiving identifies and holds the affected material under the organization's exception procedure, preserving packaging, labels, physical markings and accompanying identity documents. The receipt and hold record retain BK-TEMP and Brook Devices explicitly; an inventory description containing only TEMP-SENSOR would hide the discrepancy. Link the receipt to the applicable nonconformance or deviation record, keeping it outside released inventory while the decision is pending.
- Compare the order requirements with physical markings: establish what was requested and what actually arrived.
- Compare manufacturer documentation with those markings, retaining any conflicting identities rather than choosing the convenient description.
- Ask Harbor Supply to explain its distributor-to-manufacturer part mapping and whether it shipped a substitute.
- Check the historical AML context applicable to the order and receipt, including revision, site and effectivity. Distinguish a record-mapping error from an actual unauthorized substitution.
Authorized people then decide whether to return, reject, continue evaluation or use an authorized exception process where applicable. A satisfactory basic inspection result is evidence for that review, not a replacement for the missing authorization. If investigation establishes a mapping error, document the identity reconciliation and correction. If BK-TEMP was actually substituted, retain that identity and the disposition rationale; do not relabel it as AL-TEMP merely to clear the hold.
07AML2: add an alternate with defined site and effectivity
Fictional assumptions: Brook Devices BK-TEMP is proposed as an alternate to AL-TEMP for OEM part TEMP-SENSOR, revision C, at site North. Assume Alder Components manufactures the existing AL-TEMP. Approval for another revision or site is outside this scenario. Date placeholders below represent controlled effectivity dates, not evaluation-completion dates.
The evaluation package compares actual differences between AL-TEMP and BK-TEMP against affected specifications and assembly processes. Reviewers examine relevant characteristics—such as sensing performance, package geometry, termination compatibility and assembly settings—rather than assuming that similar descriptions establish interchangeability. The package records findings, unresolved questions and evidence sufficient for the organization’s designated reviewers to decide the proposed scope.
| Snapshot | OEM part | Revision | MPN | Manufacturer | Sourcing status | Site | Effective-from date |
|---|---|---|---|---|---|---|---|
| Before | TEMP-SENSOR | C | AL-TEMP | Alder Components | Approved | North | existing_effective_from |
| After | TEMP-SENSOR | C | AL-TEMP | Alder Components | Approved | North | existing_effective_from |
| After | TEMP-SENSOR | C | BK-TEMP | Brook Devices | Approved | North | alternate_effective_from |
The designated human approvers record their decision and supporting evaluation reference. Publication adds the scoped alternate without erasing the original relationship. North’s purchasing, receiving and production owners acknowledge the published change and identify any affected instructions or checks in the process control plan.
Under this case’s revision effectivity logic, an event evaluated before alternate_effective_from does not qualify under the new row. An event on or after that date is assessed against the remaining scope and any end date; the date alone does not establish authorization. Site South and a different OEM revision remain separate evaluation questions because neither is covered by the approved relationship.
The held AML1 receipt retains its own recorded human disposition decision. Adding BK-TEMP prospectively does not rewrite that receipt’s earlier authorization history or, by itself, authorize acceptance of the held material.
08AML3: trace builds that consumed the unlisted part
Fictional assumptions: the investigation finds earlier receipts of Brook Devices BK-TEMP, and some material was consumed before the alternate relationship became effective. The OEM part is TEMP-SENSOR, revision C, at North site. Dates below are relative to the alternate’s activation date.
Trace manufacturer and MPN → receipt identity → component lot → actual consumption → build lot → device history record reference. Here, DHR is the organization’s record linkage, not a claim that this record title is universally required. Check actual material consumption postings, including reversals and substitutions, rather than inferring use from purchase orders.
| OEM part | Revision | MPN | Manufacturer | Sourcing status | Site | Effective-from date | Receipt reference | Build reference | Applicable evaluation event |
|---|---|---|---|---|---|---|---|---|---|
| TEMP-SENSOR | C | BK-TEMP | Brook Devices | Unlisted at consumption | North | Later activation date | Receipt A / lot Alpha | Build A / DHR-A | Confirmed consumption before activation |
| TEMP-SENSOR | C | BK-TEMP | Brook Devices | Unlisted at possible consumption | North | Later activation date | Receipt B / lot uncertain | Build B / DHR-B | Possible consumption before activation |
Reconstruct authorization at each assessed event using the then-applicable revision, site, AML history and any documented exception. Later approval does not retrospectively establish authorization. Build A is positively identified through lot Alpha’s consumption record. Build B remains potentially affected because receipt identity or consumption evidence is incomplete; absence of a posting alone does not exclude it.
Quality, engineering and responsible operations personnel assess technical significance, remaining component inventory, work in process, finished stock and distributed-product implications. An unlisted MPN is not automatic proof of device failure. Humans decide containment, further testing and appropriate disposition under applicable procedures, documenting why the available technical evidence supports each decision.
Close the investigation with decision bases, unresolved traceability limits and corrective actions. Preserve links to the organization’s electronic device history records. The current AML row describes the approval relationship; it remains distinct from evidence of what earlier builds actually contained.
09Keep approval context intact across systems and outages
System-neutral integration practice starts with assigning an authoritative owner for each shared identity and decision, rather than letting whichever system updated last determine approval.
- Engineering or PLM stewardship owns OEM part revisions, manufacturer identities, MPN mappings and the versioned approval relationship; designated engineering approvers own technical acceptance.
- Purchasing or ERP stewardship owns vendor identifiers and purchase-order references, while consuming—not redefining—the manufacturer-part approval.
- Warehouse receiving owns receipt observations and material identification. Quality owns exception disposition decisions. Manufacturing execution owns actual consumption and build linkage.
Exchange the relationship identifier and version alongside OEM revision, manufacturer identity, MPN, site, sourcing status and effectivity. A global approved flag loses the context needed to interpret the relationship. In MES–QMS information exchange, link the exception decision to the affected receipt or build rather than copying an unexplained status.
- Missing publication acknowledgment: the interface owner checks delivery and acceptance; sending alone does not establish receipt.
- Rejected mapping: the relevant identity steward resolves the mismatch before replay.
- Stale local copy: the receiving-system owner refreshes it and identifies decisions made against the older version.
- Conflicting records: the approval owner resolves authority and scope; timestamps alone do not settle the conflict.
A controlled outage procedure identifies the historical snapshot permitted for use, its version and capture time, recorded checks, and the person authorizing any permitted continuation. An unavailable approval record is not affirmative approval; unresolved checks route to hold or escalation.
After recovery, reconcile intervening receipts, builds and decisions against authoritative records. Preserve the original receipt or build observation, link corrections, and record the responsible decision in the audit trail. Do not replace a consumed MPN with the intended MPN merely to make records agree.
10Failure modes that make an AML look more reliable than it is
An AML can look orderly while its identity rules or editing practices undermine approval decisions. These common master-data and sourcing-governance weaknesses call for practical safeguards, not merely more complete rows. The controls below are operational recommendations rather than universal regulatory prescriptions.
| Failure mode | Misleading result | Preventive control | Detection evidence |
|---|---|---|---|
| Manufacturer alias collisions or indiscriminate MPN suffix removal | Distinct identities appear interchangeable. | Control identity mappings; review whether each difference is administrative or technically meaningful before merging. | Original identifiers, mapping rationale and reviewer decision. |
| Distributor house-number mapping hides manufacturer changes | An unchanged ordering code appears to identify an unchanged part. | Retain the underlying manufacturer-part identity; reassess ambiguous or multiple mappings. | House-number mapping history compared with manufacturer identity on receipt records. |
| Relationships copied across sites or revisions | Approval appears valid outside its evaluated scope. | Compare contexts explicitly and assign approval ownership; avoid inheritance by convenience. | Source-to-target context comparison and named approval decision. |
| Overlapping relationship versions or unexplained blank statuses | Different users obtain contradictory eligibility answers. | Define status interpretation, including blanks; review conflicts rather than silently selecting a row. | Overlap reports, unresolved-status exceptions and retained conflict decisions. |
| Uncontrolled spreadsheet edits | A changed row looks like an authorised decision. | Restrict editing, review proposed changes and retain decision history separately from the current view. | Version comparisons linked to editor, reviewer, rationale and approval. |
A useful review samples transformations, not just populated fields: which identifiers were merged, which contexts were copied, and which decisions were overwritten? Consistent production context tagging helps expose scope differences that a simple part-number match can conceal.
11A practical implementation and review checklist
Use this practice checklist to test whether the AML controls described above work together. Demonstrate answers with retrievable records rather than relying on procedure descriptions alone.
- Ownership: identify the designated relationship owner, technical decision authority, quality disposition authority and downstream record stewards. Confirm who resolves conflicting decisions.
- Configuration: check defined OEM and manufacturer part identities, revision scope, site meaning, sourcing-status semantics and the event that determines effectivity. Retrieve a historical version without substituting today's approval state.
- Evidence: open the evaluation and change-control references. Follow a receipt to its manufacturer part and actual consumption to the resulting builds. Locate recorded exception decisions and their authorizers.
- Operational exercise: replay the fictional cases. For AML1, detect the receiving mismatch despite the approved distributor, hold the receipt and route it for human disposition. For AML2, publish the alternate only for its approved revision, site and effectivity. For AML3, perform a lookback that reconstructs affected earlier builds from actual consumption.
- Review triggers: consider relevant design, manufacturer, site, sourcing and system changes. Set review frequency through local procedures and risk rather than treating a universal interval as appropriate.
Which exceptions remain unresolved, who owns their next decisions, and what prevents unintended use meanwhile? Can receiving, engineering and quality retrieve and interpret historical records without relying on someone's memory?
Frequently asked questions
Q.Can a preferred manufacturer part be used when there is no separate approved status?+
Only if the controlled sourcing-status definitions make preferred an authorization for use in the applicable OEM part, revision, site and effectivity context. In common AML practice, preference ranks eligible sources; it does not independently establish technical acceptance. Check the approval decision behind the status rather than relying on its display label. If the meaning is ambiguous, hold the sourcing decision for clarification and resolve the status mapping through change control before treating the part as eligible.
Q.Does a distributor's private-label or house part number establish the underlying manufacturer and MPN?+
Not by itself. A house number may identify a distributor's catalog item without uniquely identifying the manufacturer and manufacturer part number supplied. Common practice is to obtain a controlled cross-reference and reconcile it with shipment identification and supporting documentation. If the distributor can fulfill that number from different manufacturers, evaluate the actual supplied identity against the AML. Keep the house number as a purchasing alias in material master data, not as a substitute for the manufacturer identity.
Q.Can a manufacturer rename or packaging suffix be treated as the same manufacturer part?+
Sometimes, after a documented identity and impact review. A corporate rename may leave the physical part unchanged, while an ordering suffix may distinguish packaging, finish, temperature grade or another characteristic relevant to acceptance. Common practice is to compare the manufacturer's explanation and technical documentation with the approved configuration, rather than normalize away the difference. Preserve old and new identifiers and their relationship. Where equivalence remains uncertain, route the candidate through alternate-source evaluation rather than treating it as an administrative correction.
Q.What happens when an alternate becomes effective after the purchase order but before receipt or build?+
The answer depends on which event the controlled effectivity rule governs: ordering, receipt, allocation or installation. Common practice is to state that event explicitly in the approval, alongside the applicable site and OEM revision. An alternate effective for builds may become eligible after ordering, but that does not resolve a purchase-order substitution or receiving discrepancy. Review those separately. Use revision effectivity to determine eligibility at the relevant event, without backdating approval or assuming the latest AML applies retrospectively.
Q.Does approval at one site cover a contract manufacturer or another plant?+
Not automatically. Common practice is to distinguish centrally accepted technical evidence from authorization to use the part at a particular manufacturing location. Another plant or contract manufacturer may have different assembly processes, test coverage, handling conditions or customer restrictions. Check whether the approval explicitly includes that location and operating context. If not, evaluate the differences and extend the authorization deliberately. Record the applicable location alongside the OEM revision and MPN so production context does not depend on informal assumptions.
Q.Can a one-lot deviation permit use without permanently adding the MPN to the AML?+
A controlled exception can be an appropriate practice where the organization's procedures allow it and the authorized reviewers accept the technical and quality justification. Keep that decision separate from permanent AML approval. Define the affected material lot, OEM revision, site, permitted use and closure conditions, with a link to the receiving and build records. A deviation should not silently enable unrestricted future purchasing. Human approval of the bounded exception does not establish the MPN as an ongoing alternate.
Q.How should remaining stock be assessed when a manufacturer part is withdrawn or marked not used?+
Start with the reason for withdrawal and the scope of the decision. Common practice distinguishes commercial obsolescence from a technical defect or unresolved quality concern; these can lead to different stock dispositions. Identify affected inventory, allocated material and work in progress, then document whether existing stock can be consumed, needs evaluation or is excluded from use. Specify any lot or effectivity boundaries. Route uncertain stock to material review rather than assuming withdrawal either permits consumption or requires scrapping everything.
Q.Can DHR traceability establish historical AML approval when the approval record is missing?+
No. In common recordkeeping practice, a device history record can establish what was installed and help identify affected builds, but use is not evidence that the MPN was authorized at the time. Search for contemporaneous approval evidence, such as a released change record or controlled AML history. If authorization remains unresolved, document the uncertainty and assess the affected product through the appropriate quality process. A later technical acceptance decision does not recreate the missing historical approval.
Primary sources
Want to see how Approved Manufacturer List could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.