V5 Ultimate
Ultimate
PricingResourcesCompany
English (original)العربيةDeutschΕλληνικάEspañolFrançaisItalianoעברית日本語한국어NederlandsPolskiPortuguêsSvenska
Talk to us Log in Start free trial
Food & Beverage
  • Bakery & Confectionery
  • Food Processing
  • Ingredients & Dry Mixes
  • Sausage & Meat Products
  • Produce Packing
  • Pet Food & Pet Supplements
  • Dairy & Chilled Foods
  • Beverages & Liquid Manufacturing
  • Infant Formula
Pharma & Life Sciences
  • Radiopharmaceuticals
  • Pharmaceutical
  • Medical Devices
  • Veterinary Pharmaceuticals
  • Blood & Tissue
  • Diagnostics & IVD Kits
  • Reference Materials & Standards
  • OTC Topical Creams & Gels
Supplements & Personal Care
  • Dietary Supplements
  • Cosmetics & Personal Care
  • Cannabis & Hemp Manufacturing
  • Fragrances & Perfumery
  • Soaps & Personal Hygiene
  • Botanical Extracts & Essential Oils
Chemicals & Materials
  • Plastics & Resins
  • Agricultural Chemicals
  • Specialty & Industrial Chemicals
  • Printing Inks, Pigments & Construction Chemicals
  • Lubricants & Metalworking Fluids
  • Coatings, Adhesives & Sealants
Other Manufacturing
  • Consumer Products
  • Electronics & Electrical Assembly
  • Textiles & Nonwoven
  • Contract Manufacturing & Co-Packing
  • Packaging & Food-Contact Materials
  • Regulated Warehousing & Distribution
Explore all industries
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Why V5? Product & Features
Why V5?Product & Features
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Explore all industries
    • Bakery & Confectionery
    • Food Processing
    • Ingredients & Dry Mixes
    • Sausage & Meat Products
    • Produce Packing
    • Pet Food & Pet Supplements
    • Dairy & Chilled Foods
    • Beverages & Liquid Manufacturing
    • Infant Formula
    • Radiopharmaceuticals
    • Pharmaceutical
    • Medical Devices
    • Veterinary Pharmaceuticals
    • Blood & Tissue
    • Diagnostics & IVD Kits
    • Reference Materials & Standards
    • OTC Topical Creams & Gels
    • Dietary Supplements
    • Cosmetics & Personal Care
    • Cannabis & Hemp Manufacturing
    • Fragrances & Perfumery
    • Soaps & Personal Hygiene
    • Botanical Extracts & Essential Oils
    • Plastics & Resins
    • Agricultural Chemicals
    • Specialty & Industrial Chemicals
    • Printing Inks, Pigments & Construction Chemicals
    • Lubricants & Metalworking Fluids
    • Coatings, Adhesives & Sealants
    • Consumer Products
    • Electronics & Electrical Assembly
    • Textiles & Nonwoven
    • Contract Manufacturing & Co-Packing
    • Packaging & Food-Contact Materials
    • Regulated Warehousing & Distribution
PricingResourcesCompany
Start free trial Log in Talk to us
HomeGlossaryEarly Feasibility Study
Quality · The complete guide

Early Feasibility Study

In short

Early Feasibility Study is a limited clinical investigation of a medical device under the US FDA IDE framework for a specific indication early in development, “typically before the device design has been finalized,” as described in [FDA guidance section 3](https://www.fda.gov/regulatory-information/search-fda-guidance-documents/investigational-device-exemptions-ides-early-feasibility-medical-device-clinical-studies-including).

4,200 words · ~20 min read
A gowned engineer in a hair cover, mask, safety glasses and gloves checks serial-labelled sealed catheter pouches on a steel bench while holding a tablet showing a table.
For an early feasibility study, the manufacturing record shows which build revision each investigational unit belongs to.
On this page
  1. 01What an Early Feasibility Study means
  2. 02EFS, first-in-human, traditional feasibility and pivotal studies
  3. 03US IDE guidance, change pathways and current regulatory scope
  4. 04From a controlled build baseline to authorized unit use
  5. 05The records that join a revision to an individual unit
  6. 06Worked case: allocating revision A and revision B units
  7. 07Worked case: returned revision A units stay distinguishable
  8. 08Worked case: a nonconforming component blocks one unit
  9. 09Connecting records and recovering broken evidence links
  10. 10Failure modes that make an EFS build history misleading
  11. 11A manufacturer review checklist for one investigational unit
On this page · 11 sections
  1. 1What an Early Feasibility Study means
  2. 2EFS, first-in-human, traditional feasibility and pivotal studies
  3. 3US IDE guidance, change pathways and current regulatory scope
  4. 4From a controlled build baseline to authorized unit use
  5. 5The records that join a revision to an individual unit
  6. 6Worked case: allocating revision A and revision B units
  7. 7Worked case: returned revision A units stay distinguishable
  8. 8Worked case: a nonconforming component blocks one unit
  9. 9Connecting records and recovering broken evidence links
  10. 10Failure modes that make an EFS build history misleading
  11. 11A manufacturer review checklist for one investigational unit
AI · Explain it for MY operation

How does Early Feasibility Study apply to your shop floor?

Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.

Your scale

01What an Early Feasibility Study means

Early Feasibility Study is a limited clinical investigation of a medical device under the US FDA IDE framework for a specific indication early in development, usually before its design is final. FDA guidance section 3 describes this timing as “typically before the device design has been finalized”. EFS is the abbreviation; early feasibility medical device study and early feasibility IDE are related search terms, not separate authorizations. The investigational plan provides the investigation context for understanding the device configuration being studied.

For US medical-device EFS IDEs, FDA guidance characterizes the study as involving a small number of subjects, generally fewer than 10 initial subjects. That description is a guidance characterization, not a universal statutory enrollment ceiling. The same definition places the learning boundary around information about initial clinical safety and device functionality that additional nonclinical assessments cannot practically provide, or for which appropriate nonclinical tests are unavailable.

The manufacturer-side question is: which configuration could an investigation participant have received, what evidence supported that configuration, and what documented decision permitted its use? Manufacturing records establish configuration history; clinical conclusions belong to the investigation. This distinction keeps a successful build, an acceptable inspection result and a clinical observation from being treated as interchangeable evidence.

In practical recordkeeping, the device history record connects the individual unit to its actual manufacturing history. The useful review follows that unit back to its build revision, supporting evidence and documented use decision, rather than relying on the latest design document alone. A later revision does not explain an earlier unit unless the records establish that relationship. The focus here is that reconstruction across manufacturing and investigation records, not clinical procedures or interpretation of study results.

02EFS, first-in-human, traditional feasibility and pivotal studies

For US medical devices, section 3 of FDA’s EFS guidance distinguishes study types by their purpose and development context. The comparison below uses those definitions; it is not a sequence of compulsory stages in the total product life cycle.

TermDevelopment positionMain purposeRelationship to EFS
EFSSee the definition aboveSee the learning purpose aboveThe reference category for this comparison
First-in-humanFirst human evaluation for a specific indicationIdentifies first human evaluation, rather than a separate evidence objectiveWithin this guidance only when it also meets the EFS definition
Traditional feasibilityNear-final or final device designPreliminary safety and effectiveness information to plan a pivotal studyDoes not necessarily follow an EFS
Pivotal studyMay proceed with or without preceding feasibility studiesDefinitive safety and effectiveness evidence for a specified intended useNeither EFS nor traditional feasibility is necessarily a prerequisite

For US medical devices within FDA’s EFS guidance, first-in-human status and EFS classification therefore answer different questions. First-in-human concerns whether the device has been evaluated in humans for that specific indication; EFS concerns whether the investigation meets the EFS definition. A US medical-device EFS does not necessarily involve the device’s first clinical use.

For US medical devices, FDA’s guidance treats feasibility and pilot as synonymous. It also states that FDA would not mandate an EFS and that not every novel device or use warrants one. Novelty alone is therefore not a sufficient basis for choosing the EFS classification.

For manufacturer records, a useful practice is to keep the study classification separate from the build revision identifier. A study label describes the investigation; it does not identify the configuration of an individual investigational unit.

03US IDE guidance, change pathways and current regulatory scope

For US medical-device EFS IDEs, FDA’s EFS guidance contains nonbinding recommendations; it is not an independent regulation. For these investigations, the guidance describes contact with FDA before IDE submission as advisable to determine whether the proposed investigation qualifies as an EFS—not as a mandatory Pre-Sub.

For US medical-device IDE changes, the guidance’s supplemental-applications overview distinguishes changes needing prior FDA approval from changes handled through notification. For US medical-device EFS IDEs, its discussion addresses changes appropriate for implementation under a 5-day notice. For those changes, the guidance also discusses contingent approval as an alternative approach that identifies the information needed to justify a change—not blanket permission for future modifications.

For US medical-device IDE changes, check the current conditions in 21 CFR 812.35(a)(3) before selecting a notice pathway. In manufacturer practice, a delivery-system change should trigger a documented pathway assessment, not an assumption of notice eligibility. Keep the sponsor regulatory function’s decision, rationale, correspondence reference and applicable authorization separate from engineering approval. Neither approval nor processing time should be treated as assured. This separation makes the basis for implementation visible without confusing technical acceptance with permission to use the changed configuration.

For US investigational medical-device labeling, check 21 CFR 812.5 for current scope. In the fictional manufacturer example, an investigational device labeling review field records the label version assessed for each configuration; a revision identifier alone does not document that assessment. For US investigational medical-device sponsor and investigator records, check 21 CFR 812.140 for current scope before mapping shipment and disposition fields.

For current US medical-device quality-system scope, check the effective-date, applicability and incorporated-standard provisions of the current 21 CFR Part 820, now titled the Quality Management System Regulation. ISO 13485 concerns medical-device quality management systems; detailed standard requirements are outside this discussion.

ISO 14155 clinical investigation and EU MDR are different frameworks, not interchangeable labels for the US IDE approach. As a practical record control, keep the jurisdiction and study framework explicit when assessing a configuration’s authorized use.

04From a controlled build baseline to authorized unit use

An illustrative manufacturer workflow connects the investigation and indication to a specific physical unit, then carries that identity through dispatch and reconciliation. The sequence below is a practical record model, not a mandated FDA sequence. Its starting reference is the applicable version of the investigational plan, without extending into clinical procedures or enrollment decisions.

Human reviewers make the engineering, quality and regulatory decisions within their responsibilities. Engineering assesses evidence applicability, quality reviews the unit’s manufacturing disposition, and the sponsor’s regulatory function records the basis and limits of permitted use. Internal sign-off does not itself create external authorization.

At each handoff, retain the referenced versions and decision dates rather than replacing historical links with the newest revision. Connect sponsor dispatch to site reconciliation through investigational device accountability, preserving both the shipped configuration and subsequent custody or disposition.

Configuration-to-use record chain
  1. 1
    Identify baselineLink investigation, indication, revision and controlled build documents.
  2. 2
    Record buildAssociate serial, components, assembly history and deviations.
  3. 3
    Assess evidenceIdentify applicable verification and unresolved configuration questions.
  4. 4
    Document decisionRecord regulatory pathway, authorization reference and unit disposition.
  5. 5
    Review labelAssociate the label version and review record.
  6. 6
    Record shipmentConnect serial, destination, dispatch and receipt events.
  7. 7
    Reconcile dispositionPreserve site issue, return, quarantine or other disposition.
Illustrative manufacturer handoffs preserve identity while responsible people document decisions.

05The records that join a revision to an individual unit

A practical EFS evidence model separates revision-level support from unit-level history. A verification report can support a configuration; a build record identifies what was actually assembled. Neither alone establishes that a particular unit was authorized for investigational use.

Use design history file, device master record and device history record as practical navigation terms for design evidence, build instructions and executed unit records—not as assertions that these names are universal legal requirements. Connect the revision baseline to the bill of materials, delivery-system configuration, approved departures and applicable evidence-set identifiers.

Use stable joins through revision_id, serial_number, dhr_ref, evidence_set_id, change_id and authorization_ref rather than a shared folder name or the latest attachment. Preserve document revisions within each evidence set. A report’s existence is not documented applicability: an applicability rationale explains which configuration it supports, what changed and why its conclusions remain relevant—or where additional evidence is needed—without prescribing test methods.

Link label review and accountability events separately; manufacturing completion, regulatory authorization and site custody should not overwrite one another in a single editable status field. Preserve who recorded each decision and when.

Revision-to-unit evidence model

Build revision

Defines the controlled configuration.

  • revision_id
  • dmr_ref
  • bom_revision

Unit build

Identifies what was assembled.

  • serial_number
  • dhr_ref
  • revision_id
  • evidence_set_id
  • label_review_id

Evidence set

Explains configuration-specific evidence applicability.

  • evidence_set_id
  • report_refs
  • applicability_rationale

Change decision

Preserves sponsor assessment and authorization.

  • change_id
  • affected_serials
  • pathway_decision
  • decision_ref
  • authorization_ref
  • use_status

Label review

Links label version and assessment.

  • label_review_id
  • label_revision
  • review_ref

Accountability event

Tracks custody and unit disposition.

  • event_id
  • serial_number
  • site_id
  • shipment_ref
  • event_type
  • disposition_ref
Illustrative records join through identifiers, preserving historical configuration and decisions.

06Worked case: allocating revision A and revision B units

Fictional assumptions: a sponsor is developing a novel catheter-delivered implant for a US EFS. DMR draft revision A covers EF-001 through EF-006. Early clinical information prompts a delivery-system change; revision B covers EF-007 through EF-010. These serials identify units, not enrollment or clinical results. All records and Site Cedar events below are invented.

DV-EF-A and DV-EF-B are fictional design verification evidence sets whose applicability assessments identify the configurations evaluated and the conclusions supporting each baseline—not merely attached reports. CR-EF-12 connects the delivery-system change, evidence assessment, affected units and sponsor regulatory decision through change control.

Two fictional authorization references sit beside, not inside, the change record. AUTH-EF-A is the sponsor's record of the original IDE approval covering the revision A configuration; its unit scope, as recorded by the regulatory function, is EF-001 through EF-006. For the delivery-system change, the regulatory function first records its pathway assessment in REG-CR-EF-12 and, in this case, concludes that prior approval is needed. AUTH-EF-B then records the resulting supplement approval for the revision B configuration, with unit scope EF-007 through EF-010 and any conditions attached to it. CR-EF-12 is the engineering change record; REG-CR-EF-12 is the pathway decision; AUTH-EF-A and AUTH-EF-B are the authorizations. Keeping the four references distinct lets a reviewer follow each serial from configuration to the permission that applied when it was shipped. The decision is fictional, not a classification of all delivery-system changes, and a 5-day notice could be assessed instead where its regulatory conditions are met.

SerialBuild recordBaseline and verification setChange, pathway and authorization referenceLabel-review referenceShipment and disposition
EF-001DHR-EF-001Revision A; DV-EF-AAUTH-EF-A (rev A scope); CR-EF-12: historical-configuration impact onlyLBL-EF-ASH-EF-A to Site Cedar; site issue recorded in accountability
EF-002DHR-EF-002Revision A; DV-EF-AAUTH-EF-A (rev A scope); CR-EF-12: historical-configuration impact onlyLBL-EF-ASH-EF-A to Site Cedar; site issue recorded in accountability
EF-003DHR-EF-003Revision A; DV-EF-AAUTH-EF-A (rev A scope); CR-EF-12: historical-configuration impact onlyLBL-EF-ASH-EF-A to Site Cedar; site issue recorded in accountability
EF-004DHR-EF-004Revision A; DV-EF-AAUTH-EF-A (rev A scope); CR-EF-12: historical-configuration impact onlyLBL-EF-ASH-EF-A to Site Cedar; site issue recorded in accountability
EF-005DHR-EF-005Revision A; DV-EF-AAUTH-EF-A (rev A scope); CR-EF-12: affected-stock review; not covered by AUTH-EF-BLBL-EF-ASH-EF-A to Site Cedar; returned unused; quarantined
EF-006DHR-EF-006Revision A; DV-EF-AAUTH-EF-A (rev A scope); CR-EF-12: affected-stock review; not covered by AUTH-EF-BLBL-EF-ASH-EF-A to Site Cedar; returned unused; quarantined
EF-007DHR-EF-007Revision B; DV-EF-BCR-EF-12; REG-CR-EF-12 (prior approval); AUTH-EF-B (rev B scope)LBL-EF-BSH-EF-B to Site Cedar; receipt recorded in site accountability
EF-008DHR-EF-008Revision B; DV-EF-BCR-EF-12; REG-CR-EF-12 (prior approval); AUTH-EF-B (rev B scope)LBL-EF-BSH-EF-B to Site Cedar; receipt recorded in site accountability
EF-009DHR-EF-009Revision B; DV-EF-BCR-EF-12; REG-CR-EF-12 (prior approval); AUTH-EF-B (rev B scope)LBL-EF-BSH-EF-B to Site Cedar; receipt recorded in site accountability
EF-010DHR-EF-010Revision B; DV-EF-BCR-EF-12; REG-CR-EF-12; AUTH-EF-B scope includes serial, but unit withheldLBL-EF-B: intended basisWithheld: component nonconformance; no shipment; no site-use permission

Reading the table row by row shows what each reference can and cannot prove. EF-001 to EF-004 were shipped under AUTH-EF-A, so their permission is traced to the revision A authorization in force at dispatch; CR-EF-12 adds only a note that a later configuration exists. EF-005 and EF-006 share that original authorization, but the change record flags them for affected-stock review, and AUTH-EF-B does not extend to them because its recorded scope is revision B units. EF-007 to EF-009 were released for shipment only after AUTH-EF-B was recorded, and their dispatch dates follow its date. EF-010 falls within AUTH-EF-B's unit scope, yet an authorization covering a configuration is not a release of a specific build, so the unit stays withheld pending its own nonconformance disposition.

A reviewer checking the allocation would typically confirm three dates for each shipped serial: the build completion date in the device history record, the date of the authorization reference listed for that serial, and the dispatch date. In this fictional record, every revision B dispatch date is later than the AUTH-EF-B date, and no revision A unit was dispatched after CR-EF-12 was opened. Where a date sequence does not line up, the gap is recorded as an open question for the responsible quality and regulatory reviewers rather than corrected by editing either record.

LBL-EF-A and LBL-EF-B connect to the applicable labeling assessment discussed above, rather than an unexplained compliance checkbox. CR-EF-12 preserves revision A history; it does not retroactively authorize those units as revision B.

Read shipment and receipt alongside investigational device accountability: receipt is not clinical use. Manufacturing records establish which configuration a subject could have received; clinical conclusions belong to the investigation.

07Worked case: returned revision A units stay distinguishable

Continuing the fictional allocation case above, Site Cedar reports EF-005 and EF-006 unused. The sponsor records physical receipt of both returned units and places them in quarantine. Each remains identified as revision A. The allocation table remains the starting point for their build references; the return adds events to those histories rather than replacing them.

The return record separates what the site declares from what the sponsor receives and subsequently assesses. For each serial, it links the site's unused-declaration reference, the return event and receipt date, the current quarantine location, and the named disposition owner. In this example, sponsor quality owns disposition, with regulatory review of any proposed further investigational use. Receipt does not itself establish condition or suitability. No inspection outcome is assumed, and the site's declaration is not recorded as a sponsor assessment.

The recorded revision B authorization does not change either returned unit's physical configuration or unit-use status in this workflow. These are still revision A units held in quarantine, not revision B inventory awaiting shipment. A reviewer can therefore distinguish authorization of a changed configuration from a decision about a particular returned device.

If rework or another disposition is proposed, the sponsor creates a separate linked record describing the proposed work, intended resulting configuration, applicable evidence, and documented authorization decision. Any completed work and resulting configuration are then recorded without rewriting the original build entry. This is the recordkeeping principle behind an electronic device history record: preserve the original manufacturing history while associating later return, assessment, and rework events with the same unit identity.

Through investigational device accountability, the reviewer retrieves the original outbound shipment and the linked inbound return by serial. They remain distinct custody movements, with opposite directions and separate event references—not duplicate inventory transactions or a cancelled shipment. The fictional outcome is narrow: neither EF-005 nor EF-006 is reused after revision B authorization unless a documented, unit-specific decision supports that use. Quarantine remains their recorded status pending disposition.

08Worked case: a nonconforming component blocks one unit

In this fictional catheter-delivered implant case, review of DHR-EF-010 identifies a component that did not conform to the specified build requirement. EF-010 remains withheld. Its association with revision B, design verification evidence set DV-EF-B and change record CR-EF-12 does not establish that this particular build is acceptable.

The unit-specific exception record captures the following information, with unresolved entries left pending rather than inferred:

  • Component identity and lot: transcribed from the component-use entry in DHR-EF-010.
  • Affected serial and configuration: EF-010, revision B, linked to its build record.
  • Nonconformance reference: the assigned record identifier, linked to the component entry and unit.
  • Containment location: the recorded physical quarantine location, with the unit's inventory status set to withheld.
  • Disposition: pending review by the responsible quality and engineering personnel, with regulatory involvement where relevant.

This illustrates nonconforming product control, not a new design revision. The exception stays linked to revision B; changing the revision field would obscure what was actually built. A first article inspection report covering a process or sample is distinct from evidence resolving the affected component in EF-010. This example does not prescribe first-article inspection for EFS units.

The open decision record awaits the responsible people's disposition, rationale, supporting evidence, approvals and any resulting restrictions. No acceptance, successful rework or subsequent clinical use is assumed.

09Connecting records and recovering broken evidence links

A practical EFS record handoff connects engineering document control’s released baseline, manufacturing’s unit history, inventory’s custody events, sponsor regulatory records’ authorization references and site accountability’s receipt and disposition records. Information can move through controlled exports or reviewed entries; the receiving record should retain a traceable reference to its source.

Use serial_number and revision_id as explicit join keys, with separate source-system identifiers, event times and document versions. Distinguish the manufacturer’s internal serial key from other identification schemes, including unique device identification, without treating that distinction as a determination of UDI applicability. Preserve both when systems use different identifiers for the same unit, with a reviewed mapping between them.

  • Duplicate import: retain the original event identifier. Compare the source transaction and custody evidence to distinguish a repeated message from a second physical movement. Reconcile the exception before updating the accountable quantity.
  • Broken link: mark the affected evidence relationship unresolved. Recover the correct versioned reference and record who reconciled it, when and on what basis. Do not silently substitute the newest file; it may describe a different configuration.
  • Out-of-order event: retain event times and receipt order so the physical event sequence remains reconstructable. Determine the unit’s actual custody from reconciled records before changing its location or use status.

Keep clinical participant data outside the manufacturing allocation table. Where reconciliation with investigation records is appropriate, use controlled references rather than copying participant details into manufacturing records.

10Failure modes that make an EFS build history misleading

An EFS history can contain the right documents yet give a misleading answer because its views, associations or status fields lose context. Useful checks target these relationships, not just document completeness.

  • Current-revision-only filtering: pair the default revision view with a historical-configuration view searchable by serial number. An older unit should remain visible with its original configuration and subsequent events when the default revision changes.
  • Verification attached at the wrong assembly level: review report applicability separately for the implant, delivery system and combined configuration. Record what was tested and the basis for applying that evidence; a shared project identifier alone does not establish coverage.
  • Incomplete affected-unit lists after a BOM change: reconcile the list in change control against actual component usage and serialized build records. Investigate unmatched units rather than assuming the planned build allocation captures every affected assembly.
  • Site-status exports treated as sponsor decisions: keep site events separate from authorization records. A receipt, return or availability status describes an event or local condition; it is not, by itself, the sponsor’s decision permitting use.

Link change assessments to relevant risk records; ISO 14971 addresses medical-device risk management. Keep the returned and withheld units discussed above visible in these checks, including exceptions still awaiting resolution.

11A manufacturer review checklist for one investigational unit

Select one serial number and reconstruct its history without relying on the latest revision folder. Use this practical manufacturer review aid to test whether the records explain that unit’s configuration and permitted use.

  1. Identify the build baseline. Can the reviewer locate the manufacturing instructions and component configuration actually used, including component revisions, lots and any documented substitutions?
  2. Read the completed build record. Does it identify the selected serial, completed operations, acceptance results and unresolved entries rather than merely pointing to a blank master document?
  3. Locate the applicable evidence set. Can the reviewer connect design verification evidence to this configuration and understand any recorded limitations on its applicability?
  4. Follow the change-control decision. Is the sponsor’s regulatory pathway decision recorded with its rationale and implementation status, rather than inferred from the revision letter?
  5. Reconstruct movement and labeling. Can the reviewer identify the correct label-review record, shipment event or confirmation that the unit never shipped, current custody, and disposition or pending decision?
  6. Resolve exceptions. Does any open issue, including a nonconforming component, affect permitted-use status? Is the responsible person’s dated decision distinguishable from an imported inventory status?
  7. Repeat the test against the cases above: an earlier revision, an unused return and the withheld unit that never shipped. Does reconstruction still work without substituting current records for historical ones?

The deliverable is a coherent unit evidence chain with explicit gaps and decision ownership—not an automatic compliance verdict or a clinical conclusion.

Frequently asked questions

Q.Does the number of investigational units built determine the number of initial EFS subjects?+

No. For US medical devices, FDA’s EFS definition describes a small number of initial subjects. Manufacturing quantities answer a different question: which units exist and what each is intended for. A sponsor commonly separates investigational-use stock from bench-test units, retained samples, spares and rejected builds. A serial allocation record can distinguish those purposes without implying enrollment or actual use. This separation also supports continuity across the device’s total product life cycle.

Q.What if the sponsor and contract manufacturer use different revision identifiers for the same configuration?+

Use a controlled cross-reference rather than silently replacing either identifier. It commonly maps the sponsor’s configuration identifier to the manufacturer’s drawing, assembly specification and build-instruction revisions, with applicability to individual serials or a defined build group. Record who accepted the mapping and its supporting comparison. Different names alone do not establish equivalence; unresolved technical differences remain open. Link subsequent changes through change control so the mapping preserves historical relationships rather than showing only the latest naming convention.

Q.Can a draft [device master record](/glossary/dmr) still provide an unambiguous historical build reference?+

Yes, as a recordkeeping practice, if the referenced draft is uniquely identified and preserved. Record the actual document revisions used, their status when issued, and any authorized build-specific departures. A mutable working folder is a weak reference because its contents can change after assembly. An electronic device history record can reference a preserved document package instead. The draft label neither erases configuration identity nor, by itself, establishes that a unit was authorized for investigational use.

Q.How can later verification evidence be linked to an earlier [device history record](/glossary/dhr) without rewriting what was known at the time?+

Add a dated relationship to the later report while preserving the original build record and its contemporaneous evidence references. The link commonly identifies the tested configuration, applicable serials, report revision and rationale for applying the result retrospectively. Distinguish the test date from the date someone assessed applicability. A design history file can organize that assessment. Later evidence can inform a new disposition decision, but it does not establish that the evidence existed when the earlier decision was made.

Q.How should an unconfirmed site receipt be represented in [investigational device accountability](/glossary/investigational-device-accountability)?+

Represent shipment and receipt as separate events. A practical record shows dispatch evidence, destination, serial identifiers and receipt confirmation pending, with an owner for follow-up. Carrier delivery information can be attached without treating it as confirmation that the site reconciled the units. Avoid assigning availability for use merely because a parcel reached an address. Where the sponsor’s investigational plan defines relevant handling arrangements, link them to the discrepancy record and document the eventual reconciliation.

Q.How should a returned unit intended only for bench work be distinguished from a unit permitted for investigational use?+

Give the returned unit a distinct intended-use status, physical segregation and a documented bench-work authorization. Preserve its serial identity, return history and configuration; do not make a new identifier conceal previous use or handling. If it also has a defect, link the nonconforming product record separately rather than treating bench allocation as defect resolution. A practical disposition states permitted activities and prevents ordinary investigational-stock allocation unless a subsequent documented decision explicitly changes that status.

Q.Does an internal serial-based evidence chain answer whether a particular EFS device needs a [UDI](/glossary/udi)?+

No. An internal serial chain establishes identity within the sponsor’s records; it does not determine the applicability of an external identification framework. Keep the device-specific UDI assessment separate from the configuration history, even if both use related identifiers. Record the assessment’s scope, rationale and responsible reviewer rather than inferring an answer from EFS status alone. Likewise, an internal serial appearing on packaging does not settle the separate questions addressed by investigational device labeling.

Q.How can a sponsor provide a unit's configuration history without including clinical participant information?+

Prepare a manufacturing-focused history keyed to the unit serial: configuration, component genealogy, build record, applicable verification evidence, change decisions and shipment or return events. Keep participant identifiers and clinical narratives outside that export. Where reconciliation is needed, use a controlled reference that authorized investigation personnel can resolve separately. Production context tagging can organize manufacturing relationships without embedding participant details. Review attachments and free-text fields too; a clean summary can still expose information through an attached site communication.

Primary sources

  • FDA guidance: Investigational Device Exemptions (IDEs) for Early Feasibility Medical Device Clinical Studies, Including Certain First in Human (FIH) Studies
Software that covers Early Feasibility Study
V5 Ultimate Medical Device MES
Device history records built from signed steps at the workstation: component lots, configured step order, inspections, UDI and…
Talk to us about Early Feasibility Study

Want to see how Early Feasibility Study could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.

Start free
Back to glossary
Where this term comes up
Medical Devices
Related terms
  • → Investigational Plan
  • → Investigational Device Accountability
  • → Investigational Device Labeling
  • → ISO 14155

Next Step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse All Features

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.

V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal Centre

© S.G. Systems, LLC