V5 Ultimate
Ultimate
PricingResourcesCompany
English (original)DeutschΕλληνικάEspañolFrançaisItalianoעברית日本語한국어NederlandsPolskiPortuguêsSvenska
Talk to us Log in Start free trial
Food & Beverage
  • Bakery & Confectionery
  • Food Processing
  • Ingredients & Dry Mixes
  • Sausage & Meat Products
  • Produce Packing
  • Pet Food & Pet Supplements
  • Dairy & Chilled Foods
  • Beverages & Liquid Manufacturing
  • Infant Formula
Pharma & Life Sciences
  • Radiopharmaceuticals
  • Pharmaceutical
  • Medical Devices
  • Veterinary Pharmaceuticals
  • Blood & Tissue
  • Diagnostics & IVD Kits
  • Reference Materials & Standards
  • OTC Topical Creams & Gels
Supplements & Personal Care
  • Dietary Supplements
  • Cosmetics & Personal Care
  • Cannabis & Hemp Manufacturing
  • Fragrances & Perfumery
  • Soaps & Personal Hygiene
  • Botanical Extracts & Essential Oils
Chemicals & Materials
  • Plastics & Resins
  • Agricultural Chemicals
  • Specialty & Industrial Chemicals
  • Printing Inks, Pigments & Construction Chemicals
  • Lubricants & Metalworking Fluids
  • Coatings, Adhesives & Sealants
Other Manufacturing
  • Consumer Products
  • Electronics & Electrical Assembly
  • Textiles & Nonwoven
  • Contract Manufacturing & Co-Packing
  • Packaging & Food-Contact Materials
  • Regulated Warehousing & Distribution
Explore all industries
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Why V5? Product & Features
Why V5?Product & Features
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Explore all industries
    • Bakery & Confectionery
    • Food Processing
    • Ingredients & Dry Mixes
    • Sausage & Meat Products
    • Produce Packing
    • Pet Food & Pet Supplements
    • Dairy & Chilled Foods
    • Beverages & Liquid Manufacturing
    • Infant Formula
    • Radiopharmaceuticals
    • Pharmaceutical
    • Medical Devices
    • Veterinary Pharmaceuticals
    • Blood & Tissue
    • Diagnostics & IVD Kits
    • Reference Materials & Standards
    • OTC Topical Creams & Gels
    • Dietary Supplements
    • Cosmetics & Personal Care
    • Cannabis & Hemp Manufacturing
    • Fragrances & Perfumery
    • Soaps & Personal Hygiene
    • Botanical Extracts & Essential Oils
    • Plastics & Resins
    • Agricultural Chemicals
    • Specialty & Industrial Chemicals
    • Printing Inks, Pigments & Construction Chemicals
    • Lubricants & Metalworking Fluids
    • Coatings, Adhesives & Sealants
    • Consumer Products
    • Electronics & Electrical Assembly
    • Textiles & Nonwoven
    • Contract Manufacturing & Co-Packing
    • Packaging & Food-Contact Materials
    • Regulated Warehousing & Distribution
PricingResourcesCompany
Start free trial Log in Talk to us
HomeGlossaryKaizen
Manufacturing · The complete guide

KaizenJapanese: 改善 — "change for the better"

In short

Kaizen (改善, "change for the better") is the Toyota / Masaaki Imai continuous-improvement philosophy that treats small, daily, operator-led change as the dominant engine of long-term performance — not the rare strategic breakthrough.

Read the full summary

Codified by Imai in his 1986 book Kaizen: The Key to Japan's Competitive Success, it pairs a cultural posture (every employee owns improvement of their own work) with structured techniques (PDCA, A3, kaizen events, suggestion systems) and a respect-for-people principle that prohibits blame. In regulated manufacturing it is the only sustainable way to keep a validated process competitive: ICH Q10's continual-improvement pillar, the CAPA-effectiveness loop, and the change-control trail are kaizen wearing GMP clothing. Without kaizen, plants regress; with it, they compound.

2,895 words · ~14 min read
On this page
  1. 01What kaizen actually is
  2. 02Kaizen vs kaikaku — small steps vs breakthroughs
  3. 03PDCA and the A3 — the structural backbone
  4. 04The kaizen event (kaizen blitz)
  5. 05Suggestion system — the daily-kaizen mechanism
  6. 06Kaizen in regulated manufacturing
  7. 07KPIs and what to measure
  8. 08Common mistakes
  9. 09Where V5 Ultimate fits
  10. 10Frequently Asked Questions
On this page · 10 sections
  1. 1What kaizen actually is
  2. 2Kaizen vs kaikaku — small steps vs breakthroughs
  3. 3PDCA and the A3 — the structural backbone
  4. 4The kaizen event (kaizen blitz)
  5. 5Suggestion system — the daily-kaizen mechanism
  6. 6Kaizen in regulated manufacturing
  7. 7KPIs and what to measure
  8. 8Common mistakes
  9. 9Where V5 Ultimate fits
  10. 10Frequently Asked Questions
AI · Explain it for MY operation

How does Kaizen apply to your shop floor?

Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.

Your scale

01What kaizen actually is

Kaizen is the daily, small-step, operator-led improvement of the way work is done. The word combines kai (change) and zen (good / for the better) — change for the better. Masaaki Imai's 1986 book formalised what Toyota had been practising since the 1950s: that compounding small improvements, made by the people who do the work, beat occasional strategic breakthroughs imposed from above. Imai called this "the single most important concept in Japanese management — the key to Japanese competitive success".

Kaizen is simultaneously a philosophy (the cultural posture that nothing is fixed and everyone owns improvement of their own work), a system of techniques (PDCA, A3, kaizen events, suggestion systems, kobetsu kaizen, improvement + coaching kata) and a measurement discipline (improvements are tracked, sustained, audited). Strip any of the three and what remains is decorative.

One-Sentence Framing

Kaizen is the discipline of making small, daily, operator-led improvements to the way work is done — and proving they hold — until compounded gains outpace any breakthrough programme management could fund.

02Kaizen vs kaikaku — small steps vs breakthroughs

Toyota distinguishes kaizen (incremental, daily, operator-led) from kaikaku (radical, project-led, capital-intensive change — typically a line redesign or new-equipment programme). Both belong in a mature operation; the mistake is treating them as substitutes. Kaikaku gives a step-change; kaizen makes the step-change actually deliver and then keeps it improving.

DimensionKaizenKaikaku
ScaleHours-to-weeks of effort; rarely capitalMonths-to-years of effort; often capital project
Source of ideasOperators at the gembaEngineering + management
CadenceDaily, weekly, continuousQuarterly to annual
Risk profileLow — easily revertedHigh — programme-level
Compounding effectStrong — daily 0.1% gain ≈ 30% annualWeak — step then plateau without kaizen follow-up
Cultural impactBuilds ownership + engagementDone to people; risks disengagement
Regulated overlayInside change-control via streamlined process; CAPA-effectiveness verifiesFull change-control project; revalidation typically required
The Kaikaku-Only Trap

Plants that fund only kaikaku — new line, new MES, new ERP — and skip the kaizen layer routinely fail to realise the projected benefits. The line is delivered, but the daily small problems that erode it (poor changeovers, drifting calibrations, the wrong reasonable-default in software) compound faster than improvements arrive. Kaizen is what sustains kaikaku.

03PDCA and the A3 — the structural backbone

Every kaizen activity, however small, follows the PDCA cycle (Plan-Do-Check-Act, sometimes called the Deming cycle though Deming attributed it to Shewhart). It is the structural backbone of disciplined improvement and the only protection against "we tried something and it didn't work" cycles that produce no learning.

StagePurposeCommon failure mode
PlanDefine the problem precisely, identify the gap vs target, hypothesise the cause, design a small countermeasureJumping to solution; "we'll just" without measurement
DoExecute the countermeasure on a small scale — one line, one shift, one productRolling out plant-wide before pilot completes
CheckMeasure the actual result vs the hypothesis; compare to baselineSkipping measurement; declaring success on activity not outcome
ActIf the countermeasure worked, standardise it (new SOP, training, controls); if not, learn + iterateQuietly dropping the change without standardising or learning

The A3 is Toyota's one-page (A3 paper size) structured-storytelling artefact that turns PDCA into a teachable, reviewable document. Left side = Plan (background, current condition, target, root-cause analysis, countermeasures). Right side = Do/Check/Act (implementation plan, measured results, follow-up actions). The constraint of one page forces brevity, prioritisation, and visual thinking. John Shook's Managing to Learn (LEI, 2008) is the canonical introduction.

04The kaizen event (kaizen blitz)

A focused 3-5 day workshop where a cross-functional team takes a specific process apart and rebuilds it. Originated at Toyota; popularised in the West by Shingijutsu sensei in the 1990s. The structure forces fast, sustained progress and is the antidote to never-finishing improvement committees.

  1. Pre-event (2-4 weeks before) — scope the target process, gather baseline data (time studies, walk paths, defect Pareto, OEE), pre-stage materials, secure executive sponsorship + operator participation.
  2. Day 1 — observe and measure on the gemba; map the current state; identify the 7 wastes (overproduction, waiting, transport, over-processing, inventory, motion, defects); set the target condition.
  3. Day 2 — design the future state; build a paper / cardboard prototype; identify required changes (layout, signals, work content, fixtures, EWI revisions, training).
  4. Day 3 — implement physical changes (move equipment, build signals, install fixtures); revise SOPs + EWIs; train the operators who will run the new process.
  5. Day 4 — pilot the new process under observation; tune; iterate; refine; capture remaining issues into a 30-day action list.
  6. Day 5 — report-out to leadership with measured before/after, sustain plan, audit schedule, owner assignments; standardise into change-control if regulated.
  7. Post-event (30 / 60 / 90 day audits) — verify the change held, measure the sustained gain, escalate regressions; if the change drifted, root-cause and re-kaizen.
The Unsustained Kaizen Event

Industry data consistently shows 40-60% of kaizen-event gains erode within 12 months without a structured sustain mechanism. The event is the easy part; the sustain audit, the standardised work that captures the change, the training-record update and the next-quarter kaizen on the same area are what make it stick. Without 30/60/90-day audits and a clear owner, the area regresses.

05Suggestion system — the daily-kaizen mechanism

A mature suggestion system is the engine of daily kaizen. Toyota famously processed 75+ suggestions per employee per year by the 1980s with >95% implementation rate — the inverse of the typical Western suggestion box that gathers dust. The key design choices that make it work:

  • Low-friction submission — paper card, kiosk form, mobile-app, 30 seconds to file; one idea per card; operators do not chase bureaucratic forms.
  • Local-team decision — the area supervisor + team approve and implement most suggestions same-week without escalation; only large or cross-area suggestions escalate.
  • Implementation bias — the question is "why not implement?" not "why implement?"; the burden of proof is on rejection, not approval.
  • Recognition not cash-incentive — Toyota's experience is that small recognition (visibility, lunch with the plant manager, a wall of fame) outperforms cash bonuses, which distort the system toward gaming.
  • Visibility — every suggestion + outcome posted on an area board; nobody's idea quietly disappears.
  • Coaching not judging — supervisors coach operators on how to develop the idea (countermeasure design, PDCA), not pass/fail it.
  • Connected to the gemba walk — leadership sees the suggestion board on every walk; absence of fresh suggestions is itself a finding.

06Kaizen in regulated manufacturing

Pharma, medical device, supplements and food plants can and must do kaizen — but inside the QMS, not as a parallel system. Specific points of integration:

  1. ICH Q10 §3.2.4 — Continual improvement of process performance + product quality is a mandatory pillar of the PQS. Kaizen is the operational mechanism; ICH Q10 is the policy frame.
  2. 21 CFR 820.100 + 211.192 — CAPA effectiveness is the regulated demand that improvements actually hold. A kaizen with no effectiveness check after 30/60/90 days will not pass an FDA audit even if the immediate fix worked.
  3. ICH Q9(R1) — Quality risk management — risk-prioritises which improvements get attention first. The kaizen backlog should be ranked by severity × occurrence × detectability, not by who shouted loudest.
  4. Change control — every kaizen that touches a validated process, equipment, document, software, supplier or material must enter change control. The lightweight "minor change" track is the friction-reduced path for most operator kaizen; major changes follow full assessment + revalidation.
  5. Standardised work — once a kaizen is approved, the new method is captured in the EWI / SOP / training record so the next shift, the next operator, and the next audit all see the new standard.
  6. Training-record linkage — anyone executing the new method must be re-trained + signed before the change takes effect at their workstation; kiosk hard-block on overdue training prevents quiet reversion.
  7. Audit trail — every kaizen submission, approval, implementation, training event, effectiveness check and standardisation update is captured in the Part 11 / Annex 11 audit trail; nothing happens off-system.
Kaizen is not the opposite of validation

A common mistake is treating kaizen as informal and therefore incompatible with regulated process. The opposite is true: every Six Sigma project, every CAPA, every change-control item, every PQR finding is kaizen wearing a regulated label. The kaizen mindset is what populates the CAPA queue with real improvements rather than reactive box-ticking.

07KPIs and what to measure

  • Suggestions per employee per year — Toyota benchmark is 50+; world-class plants 20-30; most Western plants <2. Low number means the system is not working, not that operators don't have ideas.
  • Implementation rate — fraction of submitted suggestions actually implemented. World-class is 90%+; falling rate is the leading indicator of a system collapsing into bureaucracy.
  • Time-from-submission-to-implementation — median days; mature plants run <14 days for local suggestions; >60 days means the system is too escalation-heavy.
  • Sustain rate — fraction of kaizen-event gains still in place at 12 months; <60% means the sustain mechanism is broken.
  • Kaizen events per year — count + areas covered; mature plants run 20-50 events / year per site.
  • OEE + cost-per-unit + RFT trend — the outcome measures kaizen ultimately drives. A kaizen programme that doesn't move these is decorative.
  • CAPA-effectiveness pass rate — the regulated mirror of sustain rate; <80% means the underlying countermeasures are not robust.
  • Leadership gemba-walk frequency — minutes / week at the gemba per plant manager + functional director; the leading indicator that leadership owns kaizen rather than delegating it.

08Common mistakes

Mistake 1 — kaizen as a project, not a culture

Standing up a kaizen office, running 6 events, declaring victory, and shutting it down. Kaizen is a culture of daily improvement led by line management; the office at best supports it. When kaizen lives in a department, the rest of the plant believes kaizen is not their job, and the programme dies on schedule.

Mistake 2 — no sustain mechanism

Running events without 30/60/90-day audits. Six months later the area looks identical to pre-kaizen but the team feels they tried already. Sustain is the hardest, least glamorous part of kaizen and the most consequential.

Mistake 3 — incentivising suggestions with cash

Toyota learnt this in the 1960s: cash incentives distort the system toward easy / fake suggestions and toward gaming the count. Recognition + visibility + leadership presence are what produce real engagement. Cash makes it transactional and lifeless.

Mistake 4 — leadership absent from the gemba

If the plant manager + quality director + ops manager never walk the floor, never see the suggestion board, never participate in events, kaizen will not stick. Imai's Gemba Kaizen is explicit: improvement happens where leadership shows up.

Mistake 5 — blaming individuals when kaizen reveals problems

Kaizen surfaces problems — that is the point. If problem-surface is followed by blame, suggestions stop, near-misses go unreported, and the kaizen system collapses. Respect-for-people is not optional culture-talk; it is the load-bearing pillar.

Mistake 6 — fake standardised work

A kaizen that produces a new SOP nobody follows is no improvement. Standardisation requires training + sign-off + audit + kiosk hard-block. Otherwise the next shift reverts on day 2 and you proved nothing.

Mistake 7 — confusing kaizen with cost-cutting

Kaizen is improvement of process; cost reduction is a typical outcome but is not the goal. When kaizen is framed as a cost programme, operators correctly read it as a layoff threat and stop participating. Imai is explicit on this.

09Where V5 Ultimate fits

V5 ships kaizen as first-class infrastructure rather than a slide on a poster — the suggestion queue, the kaizen-event tracker, the 30/60/90-day sustain audit, and the regulated linkage into CAPA + change-control + training-record are all native modules.

  • Kaizen suggestion queue — operators submit ideas from the kiosk in under 30 seconds (one idea per card); area supervisor approves + assigns + implements without leaving the platform; each suggestion has a full audit trail.
  • Local-team decision support — the suggestion routes to the area supervisor by default; escalates to engineering / quality / management only on configured thresholds (capital, validated state touched, multi-area impact).
  • Kaizen-event module — pre-event scoping with baseline OEE + Pareto auto-population; daily report-out templates; report-out artefacts attached to the event record; 30/60/90-day sustain audits auto-scheduled.
  • Sustain mechanism — automated reminders at 30/60/90 days; metrics auto-pulled from the OEE / cost / RFT streams; regressions auto-flagged to area supervisor + kaizen office.
  • Suggestion-system metrics — per-area per-month dashboard of submissions, implementation rate, median time-to-implement, sustain rate; declining metric flags supervisor coaching opportunity.
  • CAPA linkage — kaizen events that touch a validated process or arise from a deviation auto-create the CAPA shell + effectiveness-check schedule; CAPA-effectiveness uses the same sustain-audit data.
  • Change-control integration — kaizen that touches validated state routes through the minor-change track by default; the system proposes which clauses are triggered (Annex 15 §10, ICH Q10, change-control SOP) and pre-populates the assessment.
  • Standardised-work capture — approved kaizen automatically prompts EWI / SOP revision; training-record + kiosk hard-block ensure the new method is in force at every workstation before sunset of the old method.
  • Gemba-walk support — leadership walk template with area kaizen metrics on the kiosk; the leadership-walk record itself is auditable evidence of management engagement.
  • Mobile-safe — entire kaizen surface works at iPhone (≤390 px CSS width) without horizontal scroll; supervisors can approve suggestions and complete sustain audits from the floor.
Kaizen as Auditable Evidence

Because every kaizen suggestion, decision, implementation, training event, sustain check and standardisation is in the Part 11 audit trail, the kaizen programme itself becomes inspector-visible evidence of ICH Q10 continual improvement — the regulator sees a living, breathing improvement system rather than a poster of intent.

10Frequently Asked Questions

Kaizen vs Six Sigma — what's the difference?

Six Sigma is a statistical-toolkit-heavy improvement methodology focused on reducing variation (DMAIC: Define-Measure-Analyse-Improve-Control) typically led by trained black-belts / green-belts on chartered projects. Kaizen is a broader, lighter, more cultural philosophy that includes Six Sigma as one tool among many. Mature plants run both — Six Sigma for variation-heavy problems with strong measurement systems; kaizen for daily improvement that doesn't need a black-belt.

Can pharma actually do kaizen with validated processes?

Yes — and ICH Q10 §3.2.4 requires it. Kaizen inside change-control + CAPA + training-record + Part 11 audit trail is exactly how regulated continual improvement works. The constraint isn't kaizen vs validation; it's that every kaizen must be assessed for validated-state impact and routed through the appropriate change-control path.

How long does it take to build a kaizen culture?

Realistic experience from Toyota Production System implementations: 2-3 years to a functioning system; 5-7 years to a mature one; 10+ years to world-class. The biggest predictor is leadership engagement — plants where the plant manager walks the gemba weekly and personally reviews suggestion-board metrics get there much faster.

What's the difference between kaizen and CAPA?

CAPA is the regulated mandatory process triggered by an existing deviation / non-conformance / customer complaint. Kaizen is the broader proactive improvement discipline that targets opportunities before they become deviations. Many CAPA records are kaizen activities in regulated dress; conversely, mature kaizen programmes reduce the CAPA backlog because problems get addressed before they become non-conformances.

How does V5 support kaizen?

Kaizen suggestion queue + local-team decision routing + kaizen-event module with 30/60/90-day sustain + CAPA + change-control integration + standardised-work capture with training-record hard-block + gemba-walk support + mobile-safe; everything in the Part 11 audit trail so the kaizen programme itself is inspector-visible evidence of ICH Q10 continual improvement.

What if leadership won't engage?

Honest answer: don't start. A kaizen programme without sustained leadership presence produces 6-12 months of artificial activity followed by collapse and operators who will be cynical for years. Better to spend that political capital getting leadership to weekly gemba walks before launching the suggestion system.

What's a realistic improvement to expect from kaizen?

Daily 0.1% improvement compounded over a year is ~30%; over 5 years ~430%. Real plants don't get this in any one metric — but mature kaizen programmes typically report 20-40% OEE lift, 30-50% defect reduction, 50%+ changeover-time reduction over 3-5 years. The compounding effect is the headline; any single year's improvement is unimpressive.

Frequently asked questions

Q.Kaizen vs Six Sigma — what's the difference?+

Six Sigma is a statistical-toolkit-heavy improvement methodology focused on reducing variation (DMAIC: Define-Measure-Analyse-Improve-Control) typically led by trained black-belts / green-belts on chartered projects. Kaizen is a broader, lighter, more cultural philosophy that includes Six Sigma as one tool among many. Mature plants run both — Six Sigma for variation-heavy problems with strong measurement systems; kaizen for daily improvement that doesn't need a black-belt.

Q.Can pharma actually do kaizen with validated processes?+

Yes — and ICH Q10 §3.2.4 requires it. Kaizen inside change-control + CAPA + training-record + Part 11 audit trail is exactly how regulated continual improvement works. The constraint isn't kaizen vs validation; it's that every kaizen must be assessed for validated-state impact and routed through the appropriate change-control path.

Q.How long does it take to build a kaizen culture?+

Realistic experience from Toyota Production System implementations: 2-3 years to a functioning system; 5-7 years to a mature one; 10+ years to world-class. The biggest predictor is leadership engagement.

Q.What's the difference between kaizen and CAPA?+

CAPA is the regulated mandatory process triggered by an existing deviation. Kaizen is the broader proactive improvement discipline that targets opportunities before they become deviations. Many CAPA records are kaizen activities in regulated dress; conversely, mature kaizen programmes reduce the CAPA backlog.

Q.How does V5 support kaizen?+

Kaizen suggestion queue + local-team decision routing + kaizen-event module with 30/60/90-day sustain + CAPA + change-control integration + standardised-work capture with training-record hard-block + gemba-walk support + mobile-safe; everything in the Part 11 audit trail so the kaizen programme itself is inspector-visible evidence of ICH Q10 continual improvement.

Q.What if leadership won't engage?+

Don't start. A kaizen programme without sustained leadership presence produces 6-12 months of artificial activity followed by collapse. Better to spend that political capital getting leadership to weekly gemba walks before launching the suggestion system.

Q.What's a realistic improvement to expect from kaizen?+

Daily 0.1% improvement compounded over a year is ~30%; over 5 years ~430%. Real plants don't get this in any one metric — but mature kaizen programmes typically report 20-40% OEE lift, 30-50% defect reduction, 50%+ changeover-time reduction over 3-5 years.

Primary sources

  • Imai, M. — Kaizen: The Key to Japan's Competitive Success (McGraw-Hill, 1986)
  • Imai, M. — Gemba Kaizen: A Commonsense Approach to a Continuous Improvement Strategy (2nd ed., McGraw-Hill, 2012)
  • Toyota Production System — kaizen + respect-for-people (Toyota Global)
  • Liker, J. — The Toyota Way (McGraw-Hill, 2004) — Principle 14: Hansei + kaizen
  • Rother, M. — Toyota Kata (McGraw-Hill, 2009) — improvement + coaching kata as the daily kaizen mechanism
  • Shook, J. — Managing to Learn: Using the A3 management process (Lean Enterprise Institute, 2008)
  • ICH Q10 — Pharmaceutical Quality System (continual improvement of process performance + product quality)
  • 21 CFR 820.100 — Corrective and preventive action (the GMP shell around kaizen)

Further reading

  • Gemba
    The place where the work happens — the only valid site for kaizen.
  • 5 Whys
    The classical RCA technique inside every kaizen cycle.
  • CAPA
    The regulated wrapper that turns kaizen into auditable evidence.
  • CAPA Effectiveness
    The proof that a kaizen actually held.
  • ICH Q10
    The pharma quality system that mandates continual improvement.
  • TPM
    TPM's focused-improvement pillar is kobetsu kaizen by name.
  • OEE
    The measurement that targets kaizen at the biggest loss.
Software that covers Kaizen
V5 Ultimate Medical Device MES
Device history records built from signed steps at the workstation: component lots, configured step order, inspections, UDI and…
V5 Ultimate CAPA Software
Root cause, corrective and preventive actions and effectiveness checks sit with the source event, so owners can see what is open…
V5 Ultimate (QMSR)
The FDA Quality Management System Regulation (QMSR) — the harmonized replacement for 21 CFR 820 — became effective 2 February…
V5 Ultimate ISO 13485 QMS
Design controls with a live requirements-trace matrix, ISO 14971 risk file linked to software requirements per IEC 62304, CAPA /…
Talk to us about Kaizen

Want to see how Kaizen could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.

Start free
Back to glossary
Inside V5
  • → Score your compliance gap — then download the validation pack.
  • → Document control — one version in force, every change signed and explained.
  • → QMS — quality records next to the work they concern.
Regulatory anchors
  • ISO 13485:2016 cl. 8.5.2–8.5.3 via 21 CFR 820.10 (QMSR; replaced former 820.100)
  • 21 CFR 211.192
  • ICH Q10 §3.2.4
  • ICH Q9
  • ISO 13485 §8.5
Related terms
  • → Gemba
  • → 5 Whys
  • → CAPA
  • → CAPA Effectiveness
  • → TPM

Next Step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse All Features

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.

V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal Centre

© S.G. Systems, LLC