V5 Ultimate
Ultimate
PricingResourcesCompany
Start free trial
HomeGlossaryGenchi Genbutsu
Manufacturing · The complete guide

Genchi GenbutsuJapanese 'actual place, actual thing' — Toyota Way Principle 12

In short

Genchi genbutsu (現地現物, literally 'actual place, actual thing') is the Toyota principle that real understanding of any situation — and therefore real problem-solving, real decision-making and real coaching — is only available at the place where the work is happening, looking at the actual thing, in the actual conditions.

Read the full summary

Codified as Principle 12 in Jeffrey Liker's The Toyota Way ('Go and see for yourself to thoroughly understand the situation'), genchi genbutsu is the philosophical engine under gemba walks, A3 authoring, root-cause analysis, design reviews and Toyota's famous insistence that engineers walk the production line, suppliers visit Toyota plants, and chief engineers personally drive every prototype. The opposite is management by report — making decisions from dashboards, summaries, status decks and second-hand narratives, all of which are necessarily filtered, lagging and incomplete. In regulated manufacturing genchi genbutsu is the operational discipline behind 21 CFR 820.20 / ICH Q10 §2.7 / ISO 13485 §5.6 management responsibility, behind 5 Whys done properly (not from a desk), behind CAPA root-cause investigations that survive auditor scrutiny, and behind every credible deviation closure. The discipline is simple to state and brutally hard to sustain — but plants that institutionalise it consistently outperform plants that do not, by margins that compound over years.

3,750 words · ~18 min read
On this page
  1. 01What genchi genbutsu actually is
  2. 02Toyota Way Principle 12 — go and see for yourself
  3. 03What you actually see at the gemba that reports do not show
  4. 04How to do genchi genbutsu properly
  5. 05Genchi genbutsu and the A3
  6. 06Genchi genbutsu and the regulated overlay
  7. 07How genchi genbutsu is measured
  8. 08Seven common genchi genbutsu mistakes
  9. 09How V5 ships genchi genbutsu support
On this page · 9 sections
  1. 1What genchi genbutsu actually is
  2. 2Toyota Way Principle 12 — go and see for yourself
  3. 3What you actually see at the gemba that reports do not show
  4. 4How to do genchi genbutsu properly
  5. 5Genchi genbutsu and the A3
  6. 6Genchi genbutsu and the regulated overlay
  7. 7How genchi genbutsu is measured
  8. 8Seven common genchi genbutsu mistakes
  9. 9How V5 ships genchi genbutsu support
AI · Explain it for MY operation

How does Genchi Genbutsu apply to your shop floor?

Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.

Your scale

01What genchi genbutsu actually is

Genchi genbutsu (現地現物) translates literally as 'actual place, actual thing.' The principle is that any meaningful understanding of a situation — a defect, a process problem, a supplier issue, a customer complaint, a design choice — requires the decision-maker to physically go to where the situation exists, look at the actual artefact or condition, and observe with their own eyes before forming a conclusion or making a decision. Descriptions, reports, summaries, dashboards and second-hand narratives are always filtered, always lagging, and always incomplete; the only complete data is at the place where the work happens.

The discipline is paired with two related concepts. Gemba (現場, 'the actual place') is the noun — the production floor, the dispensary, the QC bench, the warehouse pick aisle, the supplier's facility, the customer's site. Genchi genbutsu is the verb — going to the gemba with the explicit purpose of observing the actual thing in its actual context. Gemba walks are the most visible institutional practice of genchi genbutsu, but the principle is broader than walks — it applies to every decision a leader makes about work they did not personally see.

One-sentence framing

Genchi genbutsu is the discipline of going to the place where the work happens, looking at the actual artefact or condition, and observing with your own eyes before forming a conclusion — because descriptions are always filtered, always lagging, and always incomplete.

02Toyota Way Principle 12 — go and see for yourself

Jeff Liker's The Toyota Way articulates the discipline as Principle 12: 'Go and see for yourself to thoroughly understand the situation (genchi genbutsu).' Liker pairs this with the Toyota Way Fieldbook examples — the Sienna chief engineer who drove a minivan across all 50 US states and every Canadian province before designing the next generation; the engineer transferred onto a new programme whose first month was spent on the line they would be supporting, not in the office; the executive who refused to approve a supplier-quality CAPA closure until he had personally visited the supplier and walked the process.

The principle is the operational opposite of management by exception, management by dashboard, and management by status deck. Those models rely on filtered information arriving at the decision-maker; genchi genbutsu inverts the flow by sending the decision-maker to the unfiltered source. The Western executive default — 'I do not need to walk the line; I have a daily KPI report' — is precisely the failure mode Toyota built genchi genbutsu to prevent. KPIs report what was measured; they do not report what was missed, what the operator is working around, what the equipment sounds like, or what the actual product feels like in your hand.

The 'I read the report' fallacy

Plants frequently substitute reading the report for going to see. The substitution feels efficient — five minutes to read vs an hour to walk — but it systematically destroys the decision quality of every decision built on filtered data. The report tells you what someone chose to put in the report. Genchi genbutsu surfaces what nobody chose to put in the report, which is almost always where the real problem lives.

03What you actually see at the gemba that reports do not show

The case for genchi genbutsu is not philosophical; it is empirical. Reports systematically miss specific categories of information that are visible only at the gemba. Leaders who have institutionalised the discipline can list these categories from memory; leaders who have not are unaware of what they are missing.

  • Workarounds. Every operator working a non-trivial process has accumulated 5–15 small workarounds the procedure does not describe — taping a fixture, double-tapping a button, walking around a chronic equipment fault. Reports never show workarounds because nobody writes them down. Genchi genbutsu surfaces them in the first five minutes of any honest conversation with an operator.
  • Near-misses. Defects and deviations get reported; near-misses (the part that almost went wrong, the equipment that almost faulted, the operator who almost made the wrong call) usually do not. Walk the line and operators will tell you about near-misses; the report will not.
  • Conditions. Lighting, noise, vibration, temperature, ergonomic load, sightline to displays, distance between stations — none of this is in the report. Most of it materially affects quality and safety. You only know by being there.
  • The actual product. The feel of the part in your hand, the weight, the smell, the visual surface, the assembly fit — none of this is in the report. Engineers who design parts they have never held, operators who train other operators on parts they have never assembled, executives who approve product launches without touching the product — all are working on a model of the work, not the work.
  • Body language. The operator who pauses before saying 'yes, the procedure is clear,' the team leader who looks at the floor when asked about the changeover time, the supervisor whose answer is too quick — none of this transmits through email or a status update. It is visible only in person.
  • The actual queue. Reports give batch sizes and cycle times; the gemba gives the actual pile of WIP between stations, the actual length of the queue at QC, the actual containers of waiting material. Visualised reality always differs from reported reality.
  • Time. The report gives setup time as 47 minutes; the gemba gives the breakdown — 12 minutes for the operator to find tools, 8 minutes for the missing kit, 6 minutes for the second-shift supervisor to authorise the change, 11 minutes for actual changeover work, 10 minutes for documentation. Reports collapse that decomposition; genchi genbutsu surfaces it.

04How to do genchi genbutsu properly

Going to the gemba is necessary but not sufficient. The discipline has a structure that separates productive genchi genbutsu from disruptive 'leadership tours.' The structure is the difference between observation that develops the leader's understanding and observation that wastes everyone's time and degrades trust.

  1. Go with a purpose. Not 'walking the line.' Specifically: 'understanding why first-pass yield on line 3 dropped 4 points last month' or 'observing the new changeover procedure in execution' or 'meeting the team leader who flagged the andon issue.' Purposeless walks produce purposeless observations.
  2. Go to where the work is, when the work is happening. Not the office at 10am. The actual station at 2pm during the run, or at 6am at shift change, or during the changeover, or during the deviation, or during the customer-complaint product run. Timing matters; conditions matter.
  3. Observe before speaking. Stand quietly for 5–10 minutes and watch the actual work cycle before asking a single question. Most of what you need to learn is visible if you watch; questions asked too early shape the answers you get and prevent you from seeing what is actually there.
  4. Ask open questions, not leading questions. 'Walk me through your last cycle' rather than 'is the procedure clear?' 'What part of this job is hardest?' rather than 'do you have any problems?' Leading questions confirm what you came expecting to find; open questions surface what you did not know to ask about.
  5. Listen and respect the work. The operator at the station knows more about the actual work than you do, full stop. Your job is to learn, not to demonstrate that you know better. Leaders who 'help' by suggesting fixes mid-observation destroy the trust required for future visits.
  6. Capture commitments and follow through. If you committed to remove an obstacle, fix a tool, expedite a part, or escalate an issue, do it within 72 hours and close the loop with the operator. The single fastest way to destroy genchi genbutsu credibility is to walk, listen, commit, and not follow through.
  7. Return. One visit is observation; repeated visits are relationship. The operator who has seen you four times opens up in a way they never will on the first visit. Cadence and presence compound trust over months and years.
The 'tourist walk' anti-pattern

Senior executives who walk the line once a quarter, wear a hard hat, take photos, ask 'how's it going?' and leave — without observation, without follow-through, without return — actively damage gemba culture. Operators learn that the walks are theatre, that nothing comes of them, and that opening up costs effort without benefit. The right response to inability to commit to the discipline is to not pretend to do it at all. Tourist walks are worse than no walks.

05Genchi genbutsu and the A3

The discipline shows up most concretely in the 'current condition' box of every problem-solving A3. The A3 author cannot fill in box 3 — the factual measured state at the gemba — from their desk. They have to go, observe, measure, photograph, time, count, and watch the actual cycle. Coaches reading the A3 can tell within 30 seconds whether the author was at the gemba: gemba-derived current conditions include specifics (the actual count, the actual photo, the actual operator quote, the actual queue length) that desk-derived current conditions cannot fabricate.

Toyota's standard for a problem-solving A3 is that the author has been to the gemba multiple times — once to understand the problem, once to validate proposed root causes, once to test countermeasures in their context, and once to verify the result. The four gemba visits are the discipline; the A3 is the trace. Authors who skip the visits produce A3s with vague current conditions, speculative root causes, and countermeasures that fail at the actual workstation because they were designed against a model rather than reality.

06Genchi genbutsu and the regulated overlay

Regulated manufacturing has an unusually high tolerance for paper-based decision-making — change orders signed without seeing the equipment, deviations closed without observing the affected operation, CAPAs verified through document review rather than process observation. Auditors increasingly push back. Modern FDA and Notified Body inspection technique includes 'show me, not tell me' — the inspector wants to see the equipment, the work, the operator, the actual records being created in real time. Plants whose leadership has institutionalised genchi genbutsu pass these inspections; plants whose leadership has not, do not.

  • 21 CFR 820.20 / ISO 13485 §5.6 / ICH Q10 §2.7 — management responsibility / management review. The regulator's expectation that 'management with executive responsibility' understands the QMS in practice presumes the management has been to the gemba. A management review fed by genchi genbutsu observations is qualitatively different from one fed by reports.
  • 21 CFR 820.100 / 211.192 — CAPA + production-record review. CAPA investigations that survive audit scrutiny are grounded at the gemba — the investigator has watched the failing process, observed the operator, examined the equipment, and confirmed the validated root cause in context. Desk-derived CAPAs typically fail effectiveness verification and get reopened.
  • 21 CFR 820.30 / ISO 13485 §7.3 — design controls / design reviews. Design reviews benefit enormously from the reviewers having seen the manufacturing line, the customer-use environment, and the prototype in use. Toyota chief engineers personally use every prototype; medical-device design teams that observe surgeons using the device catch usability issues that pure document review never surfaces.
  • 21 CFR 820.50 / ISO 13485 §7.4 — supplier controls. Audits at the supplier's gemba surface materially different findings from desk audits of supplier-submitted documents. Supplier qualification done without genchi genbutsu produces qualified suppliers who fail in production.
  • EU GMP Annex 15 / ICH Q9(R1) — validation + quality risk management. Risk assessments authored from process descriptions miss the actual sources of risk visible at the gemba; risk assessments grounded in observed operation systematically catch what document-only assessments miss.
  • ICH Q10 §3 — continual improvement. Continual improvement of process performance and product quality is impossible without leaders who have seen the process and held the product. The §3 requirement implies the §2.7 management presence; both presume genchi genbutsu.
Auditors do this naturally

The best regulatory inspectors are intuitive practitioners of genchi genbutsu — they spend most of their inspection on the floor, with operators, watching the work, looking at the actual records being created. The plants that pass cleanly are plants whose own leadership operates the same way; the plants that fail are plants where the inspector's gemba-based observations diverge sharply from the document-based narrative leadership has been operating on.

07How genchi genbutsu is measured

  • Leader gemba hours per week — measurable by role tier. Team leaders: most of the shift. Supervisors: 4–6 hours per day. Plant manager: 8–12 hours per week. Executive: 4–8 hours per month per site. Quality leadership: cadenced presence weekly. Below these floors, the discipline is unsustained.
  • Gemba-walk follow-through rate — % of commitments made on a walk that close on time. World-class: 90%+ within 72 hours. Below 70% means walks degrade into tourism.
  • Operator engagement signal — frequency and quality of operator-initiated communication to leaders (suggestions, andon pulls, near-miss reports). Rises measurably 3–6 months after gemba presence institutionalises; collapses when presence lapses.
  • A3 gemba evidence — % of A3 current-condition boxes that contain gemba-derived evidence (photos, operator quotes, observed cycle data, on-station counts) rather than report-derived summaries. Mature culture: 90%+.
  • Audit finding posture — plants whose leaders practise genchi genbutsu tend to receive findings about process improvement opportunities; plants whose leaders do not tend to receive findings about systemic gaps between documentation and reality.
  • Inspector floor time vs leader floor time ratio — when an external inspector spends substantially more time on the floor than your own leadership does, the gap is the cultural diagnosis. World-class plants: leadership floor time exceeds inspector floor time. Distressed plants: the opposite.
  • Time from problem report to leader on-site — for any significant deviation, equipment failure, customer complaint or safety event, how long until a responsible leader physically arrives at the gemba. World-class: minutes for safety, hours for quality, same shift for production. The metric is one of the most diagnostic of culture maturity.

08Seven common genchi genbutsu mistakes

  1. Tourist walks. Quarterly executive sweeps with photo opportunities, no observation, no follow-through, no return. Operators learn the walks are theatre; the cultural cost exceeds the cultural benefit.
  2. Leading questions. 'Is the procedure clear?' confirms what you came to confirm. 'Walk me through your last cycle' surfaces what you needed to learn. Question quality determines observation quality.
  3. Observing for too short. Five minutes at a station is not observation; it is a glance. Real observation is 15–30 minutes minimum, often longer, watching multiple cycles, with patience for the conditions to reveal themselves.
  4. Talking instead of listening. The walk becomes a monologue from the leader, with the operator nodding politely. Nothing is learned. The discipline is roughly 80% listening and 20% asking questions; statements have no place at this stage.
  5. Failing to commit and follow through. The leader observes a real obstacle, commits to fix it, and never closes the loop. The operator quietly concludes that walks accomplish nothing. Trust collapses faster than it builds.
  6. Mistaking the dashboard for the gemba. Plants build elaborate digital-twin or real-time-dashboard systems and treat the dashboard view as a substitute for physical presence. The dashboard is a useful supplement, never a substitute. The body language, the conditions, the actual product, and the workarounds are invisible to any dashboard.
  7. Reserving genchi genbutsu for the production floor only. The principle applies to the supplier, the customer, the field-service site, the R&D lab, the warehouse, the QC bench, the design review, and the CAPA closure equally. Plants that restrict it to manufacturing miss the half of the value that lives elsewhere.

09How V5 ships genchi genbutsu support

V5 cannot send a leader to the gemba — that is the leader's job — but it can dramatically lower the friction of doing genchi genbutsu well, capture what is observed, and surface the cultural signals that show whether the discipline is being sustained. The platform is built on the assumption that the leader is on the floor, on the phone, on the move, not at a desk.

  • Gemba-walk workspace per role tier. Configurable templates per role (team leader / supervisor / plant manager / executive / quality director) with observation prompts, structured note capture, photo upload, operator quotes, commitment logging, and follow-up scheduling — all mobile-first.
  • Per-area live state on mobile. When a leader walks an area, the area kiosk shows live OEE, RFT, safety incidents in the last 24 hours, open andons, overdue training, kaizen suggestions awaiting decision, deviations in flight — so the leader walks with context, not blind.
  • Commitment auto-routing. Commitments captured on a walk auto-create tasks owned by the leader (not the operator), with 72-hour SLA, escalation if missed, and closure notification back to the operator who raised the issue. Builds trust mechanically.
  • Operator obstacle queue. Operators can flag obstacles to a leader queue (without going to the andon, which is for in-cycle issues) so leaders see what to look at on their next walk. Closes the operator-to-leader feedback loop the gemba walk depends on.
  • Gemba evidence into A3. Photos, operator quotes, observed cycle data and on-station counts captured on a walk attach directly into the A3 'current condition' box — the gemba evidence becomes the A3 evidence. Removes the friction that drives leaders to fabricate desk-derived current conditions.
  • Coaching-kata templates on mobile. The five-question Toyota Kata structure is available as a structured-walk template — current condition / target condition / obstacles / next step / when can we see what was learned — captured per coaching session, linked to the team leader being coached.
  • Walk cadence dashboard. Per leader and per area, V5 tracks walk frequency, walk duration, commitment-follow-through rate, operator-initiated communication rate, and A3 gemba evidence rate. Leadership sees their own discipline; coaches see the population.
  • Audit-walk vs coaching-walk separation. The platform separates audit walks (compliance, evidence gathering) from coaching walks (development, problem-solving). Confusing the two destroys both; V5 enforces the distinction in the templates and the audit trail.
  • Inspector-readiness export. 12-month rolling export of leader gemba hours, walk-derived observations, commitments closed, A3s with gemba evidence, and management-review records grounded in gemba data — the evidence package that demonstrates 820.20 / ICH Q10 §2.7 / ISO 13485 §5.6 management responsibility in practice, not on paper.
  • Regulated overlay (820.20 / 820.100 / 820.30 / 820.50 / 211.192 / ICH Q10 §2.7 / §3 / Q9(R1) / ISO 13485 §5.6 / §7.3 / §7.4 / EU GMP Ch.2 / Annex 15). The gemba evidence stream serves management responsibility, CAPA, design controls, supplier controls, validation and risk management simultaneously — one discipline, multiple regulated obligations.
  • Part 11 + Annex 11 audit trail. Every gemba walk, observation, commitment, follow-through and escalation is timestamped, attributed, immutable, and retained.
  • Mobile-safe (iPhone ≤390px). The platform is designed for use on the floor on a phone — every capture flow works thumb-only on a 390-pixel screen.
What this changes in practice

Plants converting from desk-based leadership to V5-supported genchi genbutsu typically see operator-initiated communication rise 3-5x within 6 months, gemba-walk commitment-follow-through rate move from anecdotal to 90%+, A3 quality (measured by effectiveness-verification rate) rise from 60–70% to 90%+, and audit findings shift from systemic-gap findings to improvement-opportunity findings — all because the gap between documented reality and gemba reality has narrowed. The technology does not replace the discipline; it makes the discipline cheap enough to sustain.

Frequently asked questions

Q.What's the difference between genchi genbutsu and a gemba walk?+

Genchi genbutsu is the principle ('go and see for yourself to understand'); the gemba walk is one institutional practice of it — a regular, scheduled, structured leadership presence at the place where the work happens. The principle is broader than the walk: it applies to CAPA investigators visiting the failing process, to engineers using prototypes, to executives visiting suppliers, to design reviewers observing the customer-use environment, and to auditors walking the line. Walks are the most visible practice; the principle is the foundation.

Q.How often should leaders be at the gemba?+

Tiered by role. Team leaders spend most of the shift there. Supervisors 4–6 hours per day. Plant managers 8–12 hours per week. Executives 4–8 hours per month per site (more during launches or major issues). Quality leadership weekly cadence with a regulatory-readiness lens. Below these floors, the discipline collapses; above them, the discipline strengthens but with diminishing returns. The point is sustained presence at a cadence appropriate to the role, not heroic occasional visits.

Q.Does genchi genbutsu still matter if we have great dashboards and digital twins?+

Yes, and arguably more. Digital dashboards are useful supplements to gemba presence and dangerous substitutes for it. The dashboard cannot show you the operator's workaround, the chronic equipment fault that everyone has stopped reporting, the actual product feel in your hand, the lighting, the body language, or the workstation conditions. Plants that lean on dashboards as substitutes systematically miss the failure modes the dashboard does not measure. The right model is dashboard plus presence; the wrong model is dashboard instead of presence.

Q.How does genchi genbutsu fit into a regulated CAPA investigation?+

It is the prerequisite. A CAPA investigator who has not observed the failing process, watched the affected operator, examined the equipment in context, and validated the proposed root cause at the gemba is producing a desk-derived CAPA. Auditors detect these by asking the investigator to walk through the failure on-site — and desk-derived CAPAs cannot survive that conversation. Genchi genbutsu is also what makes 5 Whys credible: each 'why' should be answered with evidence from the gemba, not speculation from a conference room.

Q.What's the difference between an audit walk and a coaching walk?+

Audit walks gather compliance evidence — is the procedure being followed, is the equipment maintained, are the records being created. Coaching walks develop people and surface improvement opportunities — what is the obstacle, how could this be easier, what is the team leader trying to solve. Mixing them destroys trust in both: operators stop telling you what is actually going wrong because they think it might land in an audit finding, and you stop seeing the real conditions because everyone is performing compliance. The two practices must be visibly separate, ideally with different cadences and different participants.

Q.How do we know our genchi genbutsu discipline is real and not theatre?+

Six signals. (1) Leaders can tell you specific things they observed in the last week that surprised them — if not, they were not observing. (2) Operators initiate communication with leaders frequently — if not, the trust mechanism is not working. (3) Commitments made on walks close within 72 hours at 90%+ rate — if not, follow-through is broken. (4) A3 current-condition boxes contain gemba-derived evidence — if not, the discipline has not penetrated problem-solving. (5) Time from problem to leader on-site is minutes for safety, hours for quality — if not, presence is not real. (6) Inspector floor time is less than leader floor time — if the reverse is true, you have a cultural problem.

Q.What's the single biggest mistake plants make trying to institutionalise this?+

Treating it as a leadership exercise without operator infrastructure. Leaders walk the line, operators say everything is fine, leaders conclude everything is fine, nothing changes. The discipline needs the operator-side infrastructure too — psychological safety to flag obstacles, a queue to capture them, follow-through that visibly closes the loop, and time for operators to engage in the conversation. Without the operator-side, the discipline degenerates into one-way observation, which builds resentment rather than trust. Genchi genbutsu is a two-way mechanism; missing the operator side breaks it.

Primary sources

  • Liker, J. — The Toyota Way (McGraw-Hill, 2004) — Principle 12: Go and see for yourself
  • Liker, J. + Meier, D. — The Toyota Way Fieldbook (McGraw-Hill, 2006) — genchi genbutsu in practice
  • Ohno, T. — Toyota Production System: Beyond Large-Scale Production (Productivity Press, 1988)
  • Rother, M. — Toyota Kata (McGraw-Hill, 2009) — coaching kata grounded in genchi genbutsu
  • Imai, M. — Gemba Kaizen (McGraw-Hill, 2nd ed. 2012)
  • Toyota Global — The Toyota Way (philosophy + leadership principles)
  • 21 CFR 820.20 — Management responsibility (the regulated equivalent of leader presence)
  • ICH Q10 — Pharmaceutical Quality System (§2.7 management review)

Further reading

  • Gemba
    The place where genchi genbutsu happens.
  • A3
    The 'current condition' box on every A3 is genchi genbutsu evidence.
  • 5 Whys
    Done at the gemba, not from a desk.
  • Root cause analysis
    RCA without genchi genbutsu is speculation.
  • Kaizen
    Operator-led improvement requires leaders who have seen the work.
  • Standard work
    Authored by team leaders with operators at the gemba.
  • Management review
    Reviews fed by genchi genbutsu beat reviews fed by slides.
  • CAPA
    CAPA investigations that survive audits are grounded at the gemba.
Software that covers Genchi Genbutsu
V5 Ultimate Medical Device MES
Device history records built from signed steps at the workstation: component lots, configured step order, inspections, UDI and…
V5 Ultimate (QMSR)
The FDA Quality Management System Regulation (QMSR) — the harmonized replacement for 21 CFR 820 — became effective 2 February…
V5 Ultimate ISO 13485 QMS
Design controls with a live requirements-trace matrix, ISO 14971 risk file linked to software requirements per IEC 62304, CAPA /…
V5 Ultimate eQMS Software
Document control, CAPA, deviations, change control, training and audits in one platform, with a rollout plan agreed with you.
Talk to us about Genchi Genbutsu

Want to see how Genchi Genbutsu could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.

Start free
Back to glossary
Inside V5
  • → Score your compliance gap — then download the validation pack.
  • → Document control — one version in force, every change signed and explained.
  • → QMS — quality records next to the work they concern.
Regulatory anchors
  • 21 CFR 820.20
  • 21 CFR 820.100
  • 21 CFR 211.192
  • ICH Q10 §2.7
  • ISO 13485 §5.6
  • EU GMP Ch.2
Related terms
  • → Gemba
  • → A3
  • → 5 Whys
  • → Root cause analysis
  • → Kaizen
  • → Standard Work
  • → Management review
  • → CAPA

Next step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse all features
V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal centre

© V5 Ultimate