V5 Ultimate
Ultimate
PricingResourcesCompany
English (original)DeutschΕλληνικάEspañolFrançaisItalianoעברית日本語한국어NederlandsPolskiPortuguêsSvenska
Talk to us Log in Start free trial
Food & Beverage
  • Bakery & Confectionery
  • Food Processing
  • Ingredients & Dry Mixes
  • Sausage & Meat Products
  • Produce Packing
  • Pet Food & Pet Supplements
  • Dairy & Chilled Foods
  • Beverages & Liquid Manufacturing
  • Infant Formula
Pharma & Life Sciences
  • Radiopharmaceuticals
  • Pharmaceutical
  • Medical Devices
  • Veterinary Pharmaceuticals
  • Blood & Tissue
  • Diagnostics & IVD Kits
  • Reference Materials & Standards
  • OTC Topical Creams & Gels
Supplements & Personal Care
  • Dietary Supplements
  • Cosmetics & Personal Care
  • Cannabis & Hemp Manufacturing
  • Fragrances & Perfumery
  • Soaps & Personal Hygiene
  • Botanical Extracts & Essential Oils
Chemicals & Materials
  • Plastics & Resins
  • Agricultural Chemicals
  • Specialty & Industrial Chemicals
  • Printing Inks, Pigments & Construction Chemicals
  • Lubricants & Metalworking Fluids
  • Coatings, Adhesives & Sealants
Other Manufacturing
  • Consumer Products
  • Electronics & Electrical Assembly
  • Textiles & Nonwoven
  • Contract Manufacturing & Co-Packing
  • Packaging & Food-Contact Materials
  • Regulated Warehousing & Distribution
Explore all industries
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Why V5? Product & Features
Why V5?Product & Features
  • Warehouse & TraceabilityReceive, store, pick and trace
  • Production & PlanningPlan jobs and guide production
  • Quality & LaboratoryTest, investigate and review
  • Documents & TrainingControl procedures and qualifications
  • Equipment & PerformanceMaintain assets and measure losses
  • Orders & IntegrationsConnect customers, suppliers and systems
  • Outputs & InsightsReports, KPIs and label design
Explore all industries
    • Bakery & Confectionery
    • Food Processing
    • Ingredients & Dry Mixes
    • Sausage & Meat Products
    • Produce Packing
    • Pet Food & Pet Supplements
    • Dairy & Chilled Foods
    • Beverages & Liquid Manufacturing
    • Infant Formula
    • Radiopharmaceuticals
    • Pharmaceutical
    • Medical Devices
    • Veterinary Pharmaceuticals
    • Blood & Tissue
    • Diagnostics & IVD Kits
    • Reference Materials & Standards
    • OTC Topical Creams & Gels
    • Dietary Supplements
    • Cosmetics & Personal Care
    • Cannabis & Hemp Manufacturing
    • Fragrances & Perfumery
    • Soaps & Personal Hygiene
    • Botanical Extracts & Essential Oils
    • Plastics & Resins
    • Agricultural Chemicals
    • Specialty & Industrial Chemicals
    • Printing Inks, Pigments & Construction Chemicals
    • Lubricants & Metalworking Fluids
    • Coatings, Adhesives & Sealants
    • Consumer Products
    • Electronics & Electrical Assembly
    • Textiles & Nonwoven
    • Contract Manufacturing & Co-Packing
    • Packaging & Food-Contact Materials
    • Regulated Warehousing & Distribution
PricingResourcesCompany
Start free trial Log in Talk to us
HomeGlossaryPoka-yoke
Quality · The complete guide

Poka-yokeJapanese: ポカヨケ — "mistake-proofing"

In short

Poka-yoke (ポカヨケ, "mistake-proofing") is Shigeo Shingo's engineering discipline — refined at Toyota in the 1960s — that designs work so that defects either cannot occur (prevention) or cannot escape (detection). It replaces the unworkable strategy of "be more careful" with mechanical, electrical or procedural devices that make the wrong action either physically impossible or immediately obvious.

Read the full summary

Where SPC catches drift statistically and inspection catches defects after the fact, poka-yoke prevents the mistake at the moment it would otherwise happen — the only zero-defect strategy that scales. It is the engine under Shingo's Zero Quality Control philosophy and the technique that converts good intent into reliable output across discrete assembly, regulated batch production and the kiosk-driven execution surface.

2,560 words · ~12 min read
On this page
  1. 01What poka-yoke actually is
  2. 02Prevention vs detection — the two poka-yoke modes
  3. 03The three poka-yoke trigger functions
  4. 04Industrial examples by industry
  5. 05Poka-yoke in regulated manufacturing
  6. 06How to implement a poka-yoke
  7. 07KPIs and what to measure
  8. 08Common mistakes
  9. 09Where V5 Ultimate fits
  10. 10Frequently Asked Questions
On this page · 10 sections
  1. 1What poka-yoke actually is
  2. 2Prevention vs detection — the two poka-yoke modes
  3. 3The three poka-yoke trigger functions
  4. 4Industrial examples by industry
  5. 5Poka-yoke in regulated manufacturing
  6. 6How to implement a poka-yoke
  7. 7KPIs and what to measure
  8. 8Common mistakes
  9. 9Where V5 Ultimate fits
  10. 10Frequently Asked Questions
AI · Explain it for MY operation

How does Poka-yoke apply to your shop floor?

Pick your industry and scale — Ask V5 rewrites the definition in your context, gives a worked example, and shows what V5 does on day one.

Your scale

01What poka-yoke actually is

Poka-yoke is the engineering of a workstation, fixture, tool, instrument, package, label, screen, or procedure so that the wrong action is either physically impossible or immediately detected. The Japanese term combines poka (an inadvertent mistake) and yokeru (to avoid). The original 1960s name was baka-yoke ("fool-proofing"), which Shingo softened after an operator was reportedly offended; the message is the same — humans make slips, the system should not let those slips become defects.

Shingo's core argument: statistical quality control catches defects after they happen, inspection catches them late, exhortation ("pay more attention") fails because attention is a limited resource. The only scalable zero-defect strategy is to engineer the mistake out at source. A poka-yoke is the device — mechanical, electrical, procedural, or software — that does this.

One-Sentence Framing

Poka-yoke engineers the slip out before it becomes a defect — the only zero-defect strategy that scales, and the only one that survives the inevitable distraction, fatigue and turnover that no amount of training can eliminate.

02Prevention vs detection — the two poka-yoke modes

Every poka-yoke operates in one of two modes. Both are valid; prevention is strictly stronger when feasible.

ModeWhat it doesExampleStrength
Prevention (control)Makes the wrong action physically impossibleAsymmetric connector that only fits one way; interlocked guard that disables the machine when open; SIM-card tray that only inserts one orientationStrongest — the mistake cannot happen
Detection (warning)Allows the action but signals it is wrong before the consequence landsVehicle seat-belt chime; over-torque clutch click; kiosk red border + audible alert when a scanned label does not match the WOStrong — but depends on the responder honouring the signal

Where you have a choice, always prefer prevention. Detection is the fall-back when prevention is engineering-impractical or would compromise the operator's ability to do legitimate work. Detection without a structured response (acknowledge + stop + escalate) decays into background noise within weeks.

03The three poka-yoke trigger functions

Shingo classified poka-yoke devices by how they detect the condition that triggers the response. Most modern poka-yokes are hybrids across these three.

FunctionHow it triggersTypical implementation
Contact methodPhysical contact verifies presence / absence / position / shapeLimit switches, mechanical stops, fixture pins, key-slot interlocks, asymmetric connectors, weight-sensors
Fixed-value methodCounts a fixed number of operations / units / actionsClick-counter dispenser ensures correct pill count, kit-pack box has only enough cells for the required components, label printer prints only the released quantity
Motion-step methodVerifies that each step in a sequence is performed in the prescribed orderLight-curtain pick-to-light, sequenced kiosk steps that won't advance without prior step completion, sensor-confirmed torque sequence on a multi-bolt assembly

04Industrial examples by industry

Poka-yoke is universal but the specific implementations are deeply industry-specific. Concrete examples that ship in production today:

IndustryCommon poka-yoke deviceMistake it prevents
Pharma packagingVision-system + barcode-scan of every label vs WO scheduled componentWrong-label mix-ups (the #1 cause of 21 CFR 211.130 recalls)
Pharma dispenseConnected balance + bin-scan; wrong-bin or wrong-quantity refuses to commitMis-dispense + wrong-API substitution
Medical device assemblyAsymmetric mating connectors; torque clutch + sensor-confirmed sequenceWrong-orientation install + under/over-torque failures
Sterile fill-finishStopper hopper geometry only accepts correct stopper size; environmental-monitoring particle-count interlockWrong-stopper + contaminated-batch escape
Dietary supplementsAllergen-cleaning verification scan before next batch starts; allergen-graph sequencing enforced by schedulerAllergen cross-contact across batches
Food processingMetal detector + check-weigher + X-ray on every pack; CCP monitoring with kick-out divertForeign-material escape + under-weight pack escape
CosmeticsPump-cap orientation interlock at filler; serial-number range check against WO releaseWrong-pump build + wrong-quantity packed
RadiopharmaceuticalsDose calibrator + auto-decay-correction + bypass-block on uncalibrated meterWrong-activity dispense + un-released dose escape
Discrete assemblyVision system + pick-to-light + torque sensor in sequence; first-article fixture confirms assembly orientationWrong-part install + skipped-step escape
Warehouse / pickingVoice-pick with confirmation digits + bin-confirm scan; FEFO enforced by systemWrong-lot pick + expired-material release
The kiosk is a poka-yoke surface

A modern MES kiosk is itself an aggregated poka-yoke: it refuses to start a WO without released formula + trained operator + cleared line + calibrated instrument; it refuses each step until the prior step is signed; it refuses the next dispense if the balance is out of cal; it refuses release until QC passes. Each refusal is a prevention-mode poka-yoke embedded in the workflow.

05Poka-yoke in regulated manufacturing

Regulated environments make poka-yoke a regulatory expectation, not just a productivity improvement. Specific clauses that demand engineering controls over administrative ones:

  1. 21 CFR 211.130 — Packaging + labelling operations must include controls designed to prevent mix-ups. Labelling controls per 211.122 + 211.125 require reconciliation; engineered scan-verify poka-yoke is the modern interpretation.
  2. 21 CFR 820.70(a) — Manufacturer shall develop, conduct, control, and monitor production processes to ensure a device conforms to its specifications. Process controls per ISO 14971 + IEC 62366 explicitly favour engineering controls over administrative ones — the hierarchy of risk control.
  3. ICH Q9(R1) — Risk-control hierarchy explicitly ranks: eliminate the hazard > engineering controls (poka-yoke) > administrative controls (SOP) > PPE (operator vigilance). Poka-yoke sits at the engineering-controls level — the second-strongest in the hierarchy.
  4. IEC 62366-1 — Usability engineering for medical devices requires use-error analysis + design mitigations; poka-yoke is the implementation pattern.
  5. EU GMP Annex 15 §5.21 — Critical equipment and processes that affect product quality shall be qualified; engineered controls (poka-yoke) are typically what gets qualified rather than relying on operator procedure alone.
  6. EU GMP Annex 1 §8.123 — For sterile manufacturing, the principle that contamination is prevented at source rather than detected after the fact is doctrinal poka-yoke applied to aseptic process.
Administrative controls are the weakest

Writing a procedure that says "operator must verify lot number" is the weakest type of control — it relies entirely on operator vigilance. Inspectors increasingly expect engineered poka-yoke (system scans, vision check, interlocks) for any critical step where a mistake has high consequence. "Train harder" is not a CAPA an investigator will accept twice.

06How to implement a poka-yoke

  1. Identify the slip — usually surfaced by deviation, NCR, near-miss, customer complaint or focused-improvement loss-tree analysis. Be specific about exactly what went wrong, when, with what cause.
  2. Trace to root cause — five whys / fishbone / Apollo RCA. The root cause must be specific enough that an engineered control could prevent it.
  3. Choose mode — can you make the mistake physically impossible (prevention)? If not, can you make it immediately obvious (detection)? Prefer prevention.
  4. Pick the trigger function — contact, fixed-value, or motion-step (often hybrid).
  5. Prototype cheaply — cardboard fixtures, dummy connectors, paper-based pick lists with check digits. Validate the concept before tooling spend.
  6. Pilot on one line / shift / product — measure defect-rate change + operator acceptance + cycle-time impact. Iterate based on real data, not predictions.
  7. Engineer + qualify — for regulated processes, IQ/OQ/PQ the engineered control + update risk file + change-control approval before full deployment.
  8. Roll out + train — operators must understand WHAT the poka-yoke is checking + WHY, even if they cannot defeat it. Otherwise mysterious refusals erode trust.
  9. Measure retained effectiveness — quarterly check that the poka-yoke is still in place, still functional, still calibrated. Disabled or worn poka-yokes are a common audit finding.

07KPIs and what to measure

  • Defect-rate (PPM) at the step the poka-yoke targets — before vs after; sustained reduction is the headline measure.
  • Number of poka-yoke devices deployed per line — the inventory; mature lines have dozens of small ones rather than a handful of large ones.
  • Poka-yoke effectiveness audit score — quarterly verification that each device is in place, functional + calibrated; declining score is the leading indicator of regression.
  • First-pass yield (FPY) + right-first-time (RFT) — system-level measures that improve as the poka-yoke inventory grows.
  • Customer complaints + 21 CFR recalls attributable to the targeted defect mode — the executive-visible outcome.
  • Operator-attempted-override rate per device — a critical leading indicator of poor design (operators trying to defeat the poka-yoke usually have a legitimate reason; investigate before re-clamping down).
  • Cycle-time impact — well-designed poka-yokes are net-neutral or net-positive on cycle time; consistently adding time means the design is wrong.

08Common mistakes

Mistake 1 — administrative "poka-yoke"

Writing a checklist or SOP that says "verify X" is not poka-yoke; it is documentation. True poka-yoke is a mechanical / electrical / system control that operates without operator vigilance. A checklist is necessary but not sufficient.

Mistake 2 — defeated by design

Poka-yokes that are inconvenient get tape, magnets, override buttons, fake scans, work-arounds within weeks. Designing in opt-outs ("emergency bypass") that get used routinely is identical to no poka-yoke at all. If it can be defeated easily, it will be.

Mistake 3 — detection alone where prevention was feasible

Alarms + lights + warnings that allow the action to proceed leave the defect intact. Wherever feasible, the system should stop, not just complain. "Operator must acknowledge warning" is not strong enough for high-consequence steps.

Mistake 4 — over-poka-yoke

Adding poka-yoke for every conceivable mistake regardless of frequency × consequence creates an unworkable workstation. ICH Q9 risk-prioritisation is the right discipline — high-impact × high-likelihood gets the most engineering attention.

Mistake 5 — no maintenance / verification

Poka-yokes wear, drift, get knocked out of alignment, get bypassed during maintenance + not restored. Without a quarterly effectiveness audit, half the inventory will silently be non-functional within 2 years.

Mistake 6 — confusing poka-yoke with inspection

Inspection catches defects after they happen; poka-yoke prevents them. "Final QC check" is inspection; "vision system refuses to release pack with wrong label" is poka-yoke. Don't conflate them on the control plan.

09Where V5 Ultimate fits

V5's kiosk + dispense + scheduler + WMS modules ship dozens of prevention-mode poka-yokes out of the box, and the platform exposes a configuration surface for tenant-specific ones. The regulated-overlay audit trail captures every refused-action event for inspector-readiness.

  • Kiosk step interlocks — every WO step refuses to advance without the prior step's e-sig + sensor confirmation + training currency + line clearance + instrument calibration; refusal events captured in the Part-11 audit trail.
  • Dispense balance interlock — connected balance + bin-scan; out-of-tolerance weight or wrong-bin refuses to commit; cumulative weight enforcement on shared containers.
  • Label + barcode poka-yoke — every label scanned at print + at apply against the WO scheduled component; mismatch refuses to release the pack; integrates with serialisation + GS1-128 + Rx aggregation.
  • Training hard-block — operator without current training on the required procedure cannot start the task; document-control linkage is the gate.
  • Allergen-graph scheduler — proposes campaign sequencing that minimises worst-case allergen changeover; refuses sequencing violations at the scheduler level before they reach the floor.
  • Calibration-due interlock — instruments past calibration due-date cannot be used on regulated steps; survey-meter + balance + thermometer + dispense-vessel all gated.
  • Conditional release gates — radwaste release per RG 1.86 with two-person e-sig + survey-meter values inside acceptance; pharma conditional release per 21 CFR 212.70(d) for short-half-life PET drugs.
  • Override audit — when override of a poka-yoke is legitimately needed (qualified troubleshooting, validated maintenance), the path requires elevated-role e-sig + reason + auto-promotion to deviation; no silent bypass.
  • Effectiveness reporting — per-device-class refusal-rate + override-rate dashboard; sudden drops or spikes flagged for investigation; ties to CAPA backlog.
  • Mobile-safe — all kiosk poka-yokes operate identically at iPhone (≤390 px CSS width); no functionality removed on small screens; signal + refusal + audit-trail unchanged.
Poka-yoke as the default

In V5 the prevention-mode poka-yoke is the default behaviour, not an add-on. The kiosk doesn't have to be configured to refuse a wrong-label scan or an out-of-cal balance — refusal is the baseline; bypass requires explicit elevated-role authority + auto-creates a deviation. This inverts the typical software stance that defaults to permit + relies on operator vigilance to catch errors.

10Frequently Asked Questions

Poka-yoke vs SPC — what's the difference?

SPC (Statistical Process Control) detects drift in a process variable over time using statistical limits — it identifies the process moving toward an out-of-control state. Poka-yoke prevents a specific mistake at the moment it would happen — wrong part, wrong orientation, wrong quantity, wrong label. They're complementary: SPC monitors the process distribution; poka-yoke prevents individual slips. Both belong in a mature quality system.

Is software a valid poka-yoke?

Yes — and in modern manufacturing it's where most new poka-yokes live. A kiosk refusing to advance, a scanner refusing to release, a scheduler refusing to sequence are all valid prevention-mode poka-yokes provided they cannot be casually overridden. The Part-11 audit trail + validated CSV is what gives software poka-yokes regulatory weight.

How is poka-yoke different from inspection?

Inspection catches defects after they happen + before they ship; it does nothing to prevent them. Poka-yoke prevents the defect from happening in the first place. Shingo's argument was that inspection is the most expensive, least effective approach to quality — prevention scales, inspection doesn't.

Do FDA inspectors expect poka-yoke?

Increasingly yes — particularly for high-consequence steps (labelling, dispense, sterile fill, device assembly). The ICH Q9 risk-control hierarchy explicitly ranks engineering controls (poka-yoke) above administrative ones (SOP), and modern 483s frequently cite over-reliance on administrative controls where engineering controls were feasible.

What does a poka-yoke cost?

Anywhere from $0 (re-shape a connector during the next design revision; sequence the kiosk steps differently in software) to $50,000+ (vision-inspection cell, robotic check-weigher, dedicated automated reconciliation line). Mature programmes hit thousands of small zero-or-low-cost poka-yokes — the cumulative effect dwarfs any single big investment.

How does V5 ship poka-yoke?

Kiosk step interlocks + dispense balance + bin-scan + label scan-verify + training hard-block + allergen-graph scheduler + calibration-due interlock + conditional release gates + override audit + effectiveness reporting + mobile-safe operation. Prevention is the default behaviour; override is elevated-role-only + auto-promotes to deviation; the Part-11 audit trail captures every refused action for inspector-readiness.

How do I prioritise which mistakes to poka-yoke?

ICH Q9 risk-prioritisation: severity × occurrence × detectability. Start with high-severity, high-occurrence slips with weak existing detection — those have the highest ROI. The plant's deviation + NCR backlog is the empirical starting point; the customer-complaint + recall history is the strategic one.

Frequently asked questions

Q.Poka-yoke vs SPC — what's the difference?+

SPC (Statistical Process Control) detects drift in a process variable over time using statistical limits — it identifies the process moving toward an out-of-control state. Poka-yoke prevents a specific mistake at the moment it would happen — wrong part, wrong orientation, wrong quantity, wrong label. They're complementary: SPC monitors the process distribution; poka-yoke prevents individual slips. Both belong in a mature quality system.

Q.Is software a valid poka-yoke?+

Yes — and in modern manufacturing it's where most new poka-yokes live. A kiosk refusing to advance, a scanner refusing to release, a scheduler refusing to sequence are all valid prevention-mode poka-yokes provided they cannot be casually overridden. The Part-11 audit trail + validated CSV is what gives software poka-yokes regulatory weight.

Q.How is poka-yoke different from inspection?+

Inspection catches defects after they happen + before they ship; it does nothing to prevent them. Poka-yoke prevents the defect from happening in the first place. Shingo's argument was that inspection is the most expensive, least effective approach to quality — prevention scales, inspection doesn't.

Q.Do FDA inspectors expect poka-yoke?+

Increasingly yes — particularly for high-consequence steps (labelling, dispense, sterile fill, device assembly). The ICH Q9 risk-control hierarchy explicitly ranks engineering controls (poka-yoke) above administrative ones (SOP), and modern 483s frequently cite over-reliance on administrative controls where engineering controls were feasible.

Q.What does a poka-yoke cost?+

Anywhere from $0 (re-shape a connector during the next design revision; sequence the kiosk steps differently in software) to $50,000+ (vision-inspection cell, robotic check-weigher, dedicated automated reconciliation line). Mature programmes hit thousands of small zero-or-low-cost poka-yokes — the cumulative effect dwarfs any single big investment.

Q.How does V5 ship poka-yoke?+

Kiosk step interlocks + dispense balance + bin-scan + label scan-verify + training hard-block + allergen-graph scheduler + calibration-due interlock + conditional release gates + override audit + effectiveness reporting + mobile-safe operation. Prevention is the default behaviour; override is elevated-role-only + auto-promotes to deviation; the Part-11 audit trail captures every refused action for inspector-readiness.

Q.How do I prioritise which mistakes to poka-yoke?+

ICH Q9 risk-prioritisation: severity × occurrence × detectability. Start with high-severity, high-occurrence slips with weak existing detection — those have the highest ROI. The plant's deviation + NCR backlog is the empirical starting point; the customer-complaint + recall history is the strategic one.

Primary sources

  • Shingo, S. — Zero Quality Control: Source Inspection and the Poka-Yoke System (Productivity Press, 1986)
  • Shingo, S. — A Study of the Toyota Production System (Productivity Press, 1989) — chapter on source inspection
  • Nikkan Kogyo Shimbun — Poka-Yoke: Improving Product Quality by Preventing Defects (Productivity Press translation, 1988) — 240+ industrial case studies
  • Toyota Production System — jidoka + autonomation overview (Toyota Global)
  • 21 CFR 820.70(a) — Production + process controls (device GMP error-prevention requirement)
  • 21 CFR 211.130 — Packaging + labelling operations (error-prevention controls)
  • ICH Q9(R1) — Quality Risk Management (informs poka-yoke prioritisation)
  • IEC 62366-1 — Usability engineering for medical devices (use-error prevention)

Further reading

  • SMED
    Poka-yoke is the discipline that makes fast changeover defect-free.
  • SPC
    Statistical detection — complementary, not equivalent.
  • Line Clearance
    Regulated poka-yoke against product mix-ups.
  • CAPA
    Permanent corrective action often ends in a poka-yoke.
  • IEC 62366
    Use-error prevention standard for medical devices.
  • ISO 14971
    Risk-management framework that justifies poka-yoke investments.
  • EWI
    Kiosk surface that ships poka-yoke at every step.
Software that covers Poka-yoke
V5 Ultimate Medical Device MES
Device history records built from signed steps at the workstation: component lots, configured step order, inspections, UDI and…
V5 Ultimate (QMSR)
The FDA Quality Management System Regulation (QMSR) — the harmonized replacement for 21 CFR 820 — became effective 2 February…
V5 Ultimate ISO 13485 QMS
Design controls with a live requirements-trace matrix, ISO 14971 risk file linked to software requirements per IEC 62304, CAPA /…
V5 Ultimate for Annex 1
Sterile and aseptic manufacturing under the revised EU GMP Annex 1 (August 2023 effective) — a live Contamination Control…
Talk to us about Poka-yoke

Want to see how Poka-yoke could fit into your own records and workflows? Explore the related V5 pages or talk to our team about what applies to your operation.

Start free
Back to glossary
Inside V5
  • → Score your compliance gap — then download the validation pack.
  • → Document control — one version in force, every change signed and explained.
  • → QMS — quality records next to the work they concern.
Regulatory anchors
  • 21 CFR 211.130
  • 21 CFR 211.122
  • 21 CFR 211.125
  • ISO 13485:2016 cl. 7.5.1 via 21 CFR 820.10 (QMSR; replaced former 820.70)
  • ICH Q9
  • IEC 62366-1
  • EU GMP Annex 1
Related terms
  • → SMED
  • → SPC
  • → Line Clearance
  • → CAPA
  • → IEC 62366
  • → ISO 14971
  • → EWI

Next Step

Try V5 with your own records, or ask a question first. Ask V5 opens with an editable question; nothing is sent until you choose to.

Start your free trial Browse All Features

Showing the site for the United States. Local spelling, dates and prices are applied automatically; change the language at the top of the page.

V5 Ultimate
Ultimate

Warehouse, quality and manufacturing software for regulated operations.

ProductIndustriesPricingResourcesSecurity & TrustCompanyLegal Centre

© S.G. Systems, LLC